3F0198-46, Provides Notification That Commitment Due Date Re Response to NOV Identified in Insp Rept 50-302/97-10 Concerning Installation of Video Capture Sys Being Extended to 980214

From kanterella
(Redirected from 3F0198-46)
Jump to navigation Jump to search
Provides Notification That Commitment Due Date Re Response to NOV Identified in Insp Rept 50-302/97-10 Concerning Installation of Video Capture Sys Being Extended to 980214
ML20199G110
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/30/1998
From: Marano M
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0198-46, 3F198-46, 50-302-97-10, NUDOCS 9802040216
Download: ML20199G110 (3)


Text

.

i Florida p" Pswer 'I

"=.L

- n-January 30,1998 3F0198-46 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 0001

Subject:

-COMMITMENT DUE DATE EXTENSION INSTALLATION OF VIDEO CAPTURE SYSTEM

Reference:

Reply to Notice of Violation 97-10-01 FPC to NRC letter 3F0997 20, dated September 15,1997 e

Dear Sir:

The purpose of this letter is to provide notification that a commitment due date is being extended. Reply to Notice of Violation 97-10-01 discussed inadequate capabilities of the Closed Circuit Television (CCTV) system that would not allow full assessment of csdain protected area perimeter zone alarms. Crystal River Unit 3 immediately compensated for the inadequacy by posting security force personnel to act as assessors in the event of an alarm in an affected zone. Two of the corrective action commitments that were made in the Reply stated:

A video capture system capable of detecting intruder presence prior to generating or receiving an alarm indication will be installed by s

February 14,1998 Concertina wire, additional fencing and ' stride-breaking" cables will also be installed by February 14, 1998 to correct physical deficiencies along portions of the Protected Area fenceline.

gf5

()/)h hbb ,

e CRYSTAL RIVER ENERoY COMPLEX a 16760 W. Power Line street crystal River, Florida 344284708 - (352)735-64d6 A Floride Progress Company 9002040216 900130 PDR ADOCK 05000302 O PDR W

  1. ' U. S. Nuclear Regulatory Commission Page 2 of 3 3F0198-46

' As a result of the outage schedule, the resources needed to complete the engineering work for the video capture system have been redirected to restart activities. The video capture system will be installed by April 17,1998. Concertina wire, additional fencing and 'strido-breaking

  • cables have been installed in certain areas but ad."tlonal areas may also require upgrading. This detortnination will be based on the capabilities of the video capture system. Any additional concertina wire and ' stride-breaking" cables will be installed by May 1,1998. Adequate compensator / measures will terr.aln in effect until these actions are completed.

Sincerely, M. W. Marano 4

Director, Site and Business Support MWM/rlm Attachment xc: Regional Administrator, Region ll Senior Resident inspector NRR Project Manager k.

. U. S. Nuclear Regulat:ry Commtsion Page- 3 of 3

. 3F0198-46 AIIACHMENT The following table contains a listing of commitments contained in FPC's response:

l ESPONSE COMMITMENT DUE DATE SECTION Page 2 The video capture system will be installed by. April 17, April 17,1998 1998.-

Page 2 Concertina wire, additional fencing and "stridd breakirg" May 1,1998 cables have been installed in certain areas but additional

  • areas may also require upgrading. This determination will be based on the capabilities of the video capture system. Any additional concertina wire and " stride-i breaking
  • cables will be installed by May 1, 'l098.

.o t t

__d