3F0198-44, Provides Util Schedule for Submitting Hot Leg Injection Via Reverse Flow Method of Post LOCA Boron Precipitation Control for NRC Review.Change Necessary Due to Rev to Analyses Associated W/Lar 223, Post-LOCA Boron Precipitation

From kanterella
(Redirected from 3F0198-44)
Jump to navigation Jump to search
Provides Util Schedule for Submitting Hot Leg Injection Via Reverse Flow Method of Post LOCA Boron Precipitation Control for NRC Review.Change Necessary Due to Rev to Analyses Associated W/Lar 223, Post-LOCA Boron Precipitation
ML20199J630
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/31/1998
From: Rencheck M
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0198-44, 3F198-44, NUDOCS 9802050369
Download: ML20199J630 (2)


Text

.

r .

Florida Power 9 Eo."Jm".n,, w:::.m f January 31,1998 1 3F0198-44 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 .

Subject:

Revision to Submittal Date for llot Leg injection via Reverse Flow Method of Post LOCA Baron Precipitation Control

Reference:

FPC to NRC letter,3F1097-32, dated October 31,1997, " License Amendment Request #223, Revision 0; Post LCCA Horon Precipitation Prmation"

Dear Sir:

This letter provides Florida Power Corporation's (FPC) revised schedule for submitting the hot leg injection via reverse flow method of post loss of coolant accident (LOCA) boron precipitation control for NRC review. FPC hereby revises the expected submittal date for this letter from November 14,1997, as provided in the referenced letter, to February 27,1998. The change in schedule is necessary due to revisions to analyses associated with License Amendment Request (LAR) #223, " Post-LOCA Horon Precipitation Prevention." These revisions were rmmpted by a more detailed review of analysis inputs and assumptions associated with the LAR i analyses. The revisions to the calculation for hot leg injection via reverse flow have not

, aged the conclusion that this method will be effective in controlling post-LOCA baron precipitation. Reliance on this method of boron dilutica is not required prior to the restart of Crystal River Unit 3 and is not credited in LAR #223.

This commitment is reflected in the attached table. If you have any questions regarding this submittal, please contact Mr. David Kunsemiller, Manager, Nuclear Licensing at (352) S63-4566.

Sincerely, l .

M. W. Rencheck, Director Nuclear Engineering and Projects hob l I 'O MWR:dah 9802050369 930131 liq PDR ADOCK 03000302 Attachment P poa Illh,j /y

{j j xc:

[////

Regional Administrator, Region 11 NRR Project Manager Senior Resident Inspector CRYSTAL RPJ2R ENERGY COMPLEX. 15760 W Power Line Street

  • Crystal River, Flonda 34428-6708 - (352) 795-6486 A Flonda Progress Company s

U. S. Nuclear Regulatory Commission 3F0198-44 Page 2 of 2 LIST OF COMMITMENTS '

l The following table identifies those actions committed to by Florida Power Corporation in this document. Any other a;1 ions discussed in the submittal represent intended er planned actions by Florida Power Corporation. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager, Nuclear Licensing of any questions regarding this document or any associated regulatory commitments.

Commitment Due Date This letter provides Florida Power Corporation's (FPC) February 27,1998 revised schedule for submitting the hot leg injection via reverse flow method of post loss of coolant accident ,

(LOCA) boron precipitation control. FPC hereby revises {

the expected submittal date for this letter from November 14, 1997, as provided in the referenced letter, to February 27,1998.