Title | Failure to Correct an Identified Degraded Condition on the Division 3 Shutdown Service Water Pump |
Description | A self-revealing finding and an apparent violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, with associated violations of Technical Specification (TS) 3.7.2 and TS 3.5.1 were identified on June 15, 2017, for the licensees failure to correct a degraded condition identified during the evaluation performed as a result of the Division 3 shutdown service water (SX) pump failure in 2014. Specifically, the licensee identified corrosion of the Division 3 SX pump sleeves as a contributing cause of the 2014 pump failure and failed to appropriately evaluate and correct this issue. This resulted in the Division 3 SX pumps failure to start on June 15, 2017, and rendered the Division 3 SX pump inoperable for a time longer than its TS allowed outage time. The licensee entered this issue into the corrective action program and implemented design changes to the pump and motor assembly, including installing a new motor with higher starting torque characteristics and replacing the pump shaft sleeves and packing with parts more resistant to corrosion. The licensee has completed multiple successful runs of the new pump with no abnormalities noted. The inspectors determined that the licensees failure to correct a degraded condition identified during the evaluation performed as a result of the 2014 Division 3 SX pump failure appears to be not in accordance with the requirements of 10 CFR 50, Appendix B, Criterion XVI, and was a performance deficiency. The performance deficiency was determined to be more than minor because it impacted the Mitigating Systems cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, capability and reliability of equipment that responds to initiating events. Specifically, the performance deficiency resulted in the failure of the Division 3 SX pump, which impacted the operability and functionality of the high pressure core spray system and the Division 3 emergency diesel generator. Using IMC 0609, Appendix A, Significance Determination Process for Findings At-Power, dated June 19, 2012, a Significance and Enforcement Review Panel preliminarily determined the finding to be of low to moderate safety significance. The inspectors determined that this finding affected the cross-cutting area of problem identification and resolution in the aspect of evaluation, where the organization thoroughly evaluates issues to ensure that resolutions address causes and extent of
3 conditions commensurate with their safety significance. Specifically, the licensee failed to properly evaluate the Division 3 SX pump sleeve corrosion rates when performing the component life evaluation, the component operability evaluation and the evaluation in response to the abnormal noises identified during periodic pump runs. [P.2] |
Site: | Clinton |
---|---|
Report | IR 05000461/2017011 Section 4OA2 |
Date counted | Dec 31, 2017 (2017Q4) |
Type: | AV: White |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | W Schaup E Sanchez J Hanna |
Violation of: | 10 CFR 50 Appendix B Criterion XVI Technical Specification |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |
Finding - Clinton - IR 05000461/2017011 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Clinton) @ 2017Q4
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||