05000458/FIN-2013007-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Resolve Noncompliances Associated with Multiple Spurious Operations in a Timely Manner |
Description | The team identified a Green violation of 10 CFR Part 50, Appendix B, Criterion XVI for the failure to complete corrective actions associated with multiple spurious operations concerns in a timely manner. Specifically, the licensee failed to implement all of the required corrective actions for multiple spurious operations concerns prior to November 2, 2012, which marked the expiration of enforcement discretion for multiple spurious operations contained in Enforcement Guidance Memorandum 09-002. The licensee entered this issue into their corrective action program as Condition Report CR-RBS-2013-03465. The failure to implement all of the required corrective actions for multiple spurious operations concerns in a timely manner was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The team evaluated this finding using Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination Process, dated September 20, 2013, because it affected the ability to reach and maintain safe shutdown conditions in case of a fire. A senior reactor analyst performed a Phase 3 evaluation to determine the risk significance of this finding since it involved multiple fire areas. The senior reactor analyst determined this finding was of very low safety significance (Green). The finding had a cross-cutting aspect in the Work Practices component of the Human Performance area because the licensee failed to ensure supervisory and management oversight of work activities, including contractors, such that nuclear safety was supported. |
Site: | River Bend |
---|---|
Report | IR 05000458/2013007 Section 1R05 |
Date counted | Dec 31, 2013 (2013Q4) |
Type: | Violation: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | A Barrett G Miller J Mateychick S Achen S Alferinkb Parksd Bradley G Guerra G Warnick J Mateychick J O'Donnell J Sowa L Brandt M Phalen R Deese S Makor |
Violation of: | 10 CFR 50 Appendix B Criterion XVI |
CCA | H.2, Field Presence |
INPO aspect | LA.2 |
' | |