LER-2003-003, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements
Docket Number
Event date: 08-28-2003
Report date: 03-31-2004
4542003003R01 - NRC Website

APPROVED BY OMB NO. 3150-0104 EXPIRES 0713112004 collection request 50 hrs. Reported lessons learned are incorporated into the licensing process and fed back to industry. Forward comments regarding burden estimate to the information and Records Management Branch (t-6 f33), U.S.

Paperwork Reduction Project (3150-0104), Office Of Management And Budget, Washington, DC 20503. If an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6 PAGE (3) Byron Station, Unit 1 STN 05000454 (If more space Is required, use additional copies of NRC Form 366A)(17)

A. Plant Conditions Prior to Event:

Event Date/Time: August 28, 2003 / 1743 hours0.0202 days <br />0.484 hours <br />0.00288 weeks <br />6.632115e-4 months <br /> Unit 1- Mode 1— Power Operations, Reactor Power 100% Unit 2 - Mode 1— Power Operations, Reactor Power 100% Reactor Coolant System [AB] for both units: Normal operating temperature and pressure.

No structures, systems or components were inoperable at the start of the event that contributed to the event.

Background

An Ultrasonic Flow Measurement System (UFMS) was installed on each of the four main feedwater [SJ] loops and was utilized as a calibration tool to correct feedwater venturi flow measurements through use of a correction factor . The UFMS uses ultrasonic cross-correlation technology to measure feedwater flow. The UFMS vendor for Byron Station is Advanced Measurement and Analysis Group (AMAG), Inc.

B. Description of Event:

Byron Station Units 1 and 2 installed the UFMS in May 1999. During testing, measurements of the correction factors indicated an unexpected difference between the Braidwood Station Unit 1 and Byron Station Unit 1 feedwater venturi flowrates and venturi correction factors. This resulted in different megawatt electric recoveries between the two Units with Byron Station Unit 1 potentially generating more megawatts electric (approximately 15 mw) than Braidwood Station Unit 1.

An evaluation was conducted to determine and understand the difference between Byron Station Unit 1 and Braidwood Station Unit 1 and was inconclusive. However, the evaluation did verify the UFMS was installed correctly and it was operating within design criteria established for the UFMS. Consequently, a decision was made to implement feedwater venturi correction factors using the UFMS at Byron in May 2000.

Over the next several months, additional internal and external evaluations were conducted in an attempt to understand the discrepancy between the two units. The results of these investigations concluded that the UFMS was operating in accordance with the criteria required by the UFMS vendor.

(KIBYR_DOCS1_LERS120031ers1454-2003-003-00.doc) APPROVED BY OMB NO. 3150-0104 EXPIRES 0713112004 collection request 50 hrs. Reported lessons learned are incorporated into the licensing process and fed back to industry. Forward comments regarding burden estimate to the information and Records Management Branch (t-0133), U.S.

Paperwork Reduction Project (3150-0104), Office Of Management And Budget, Washington, DC 20503. If an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6 PAGE (3) Byron Station, Unit 1 STN 05000454 (If more space is required, use additional copies of NRC Form 366A)(17) A broader test plan was developed in early 2003 to continue the investigation. In May 2003, a flow comparison test with the common main feedwater header UFMS flow to the sum of the UFMS measurement in the four main feedwater loops was conducted on Braidwood Station Unit 1. The results of this test were within the acceptance criteria. In August 2003, this test was re-performed at Byron Station Unit 1. The difference between the sum of the UFMS measurements in the four main feedwater loops and the common main feedwater header was outside the acceptance criteria (1.572% compared to a maximum allowable statistical limit of 0.70%). With this test outside of its acceptance criteria, Byron Station reduced power and returned the correction factors to 1.0 on both units, pending resolution of the issue.

Upon investigation by site and vendor personnel, it was determined that signal noise affected the flow velocity calculations, which in turn affected the determination of the correction factors. With the noise contaminated correction factors used in the calorimetric calculation, a non-conservative or lower power measurement resulted. When reactor power was adjusted to match the calorimetric power, an overpower condition was created. An overpower condition on Unit 1 and Unit 2 potentially existed since initial implementation in May 2000.

As part of the UFMS independent review, a flow measurement utilizing a radioactive tracer was performed on the Unit 1 and Unit 2 main feedwater systems. The tracer results indicated there was a non-conservative bias in the UFMS installed on the common main feedwater header. This test also validated the accuracy of the installed venturi flow measurement system.

The originally reported worst-case overpower conditions on Unit 1 and Unit 2 (Sept. 2003) were based on the premise that the UFMS on the common main feedwater header was providing accurate flow measurements. Based on the results of the tracer test on Unit 1 and Unit 2 validating the accuracy of the venturi flow measurement, the worst-case overpower is now based on the maximum UFMS correction factor applied to the venturi flow measurement. The worst-case overpower conditions are 102.62% for Unit 1 and 101.88% for Unit 2.

In accordance with Byron Station Unit 1 License Condition 2.F and Byron Station Unit 2 License condition 2.G notification was made to the NRC at 1355 CST on August 28, 2003, due to the violation of License Condition 2.C(1) of each license, " Maximum Power Level.

C. � Cause of Event:

The initial root cause of this event was determined to be noise contamination of the UFMS ultrasonic signal. I Feedwater flow pressure pulses occurred at frequencies that affected the UFMS signal and resulted in a bias in the determinations of the flow correction factors. This noise caused the UFMS to indicate a lower than actual feedwater flowrate which resulted in a non-conservative calorimetric calculation.

(IC1BYR_DOCS_LERS120031ers1454-2003-003-00 doc) APPROVED BY OMB NO. 3150-0104 EXPIRES 0713112004 collection request 50 hrs. Reported lessons learned are Incorporated into the licensing process and fed back to industry. Forward comments regarding burden estimate to the information and Records Management Branch (t-0133), U.S.

Paperwork Reduction Project (3150-0104), Office Of Management And Budget.

Washington, DC 20503. If an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6 PAGE (3) Byron Station, Unit 1 STN 05000454 (If more space is required, use additional copies of NRC Form 366A)(17) Contributing causes were a lack of questioning attitude during the implementation and subsequent I evaluations and the failure to use the diagnostic tool which could have identified the noise.

Based on the result of the tracer test mentioned above, the initial root cause for inaccuracies in the feedwater ultrasonic measurement is incomplete. The UFMS vendor is currently investigating the performance issues associated with the UFMS.

D. Safety Consequences:

The evaluations below envelope the revised overpower condition discussed in section B.

The safety significance of the overpower issue for Byron Station Units 1 and 2 has been evaluated by Westinghouse and Exelon Nuclear Fuels. The evaluations considered a conservatively bounding overpower value of 102.62% plus a 2% of the Byron uprated power limit (i.e., 3586.6 Mwt) calorimetric uncertainty.

Byron station implemented a 5% power uprate in May 2001. The impact of the overpower condition was evaluated for pre and post power uprate operations. The following areas were reviewed:

Design Transients Operating Margin to Reactor Trip Neutron Fluence Projections, Reactor Vessel Integrity, and Low Temperature Overpressure Protection Loss of Coolant Containment Integrity Steamline Break Containment Integrity All Updated Final Safety Analysis Report Chapter 15 accidents Fuel Evaluation The acceptance criteria were met for all the evaluated events.

This event did not result in a safety system function failure.

E. � Corrective Actions:

Byron Station Units 1 and 2 reduced reactor power to ensure the licensed thermal power limit was not being exceeded. Additionally, the correction factors for the feedwater flow venturis were reset to 1.0.

The implementation of the UFMS has been suspended.

(KABYR_DOCM_LERSX20031ers454-2003-003-00.doc) APPROVED BY OMB NO. 3150-0104 EXPIRES 0713112004 collection request: 50 hrs. Reported lessons learned are incorporated into the licensing process and fed back to industry. Forward comments regarding burden estimate to the information and Records Management Branch (t-0133), U.S.

Paperwork Reduction Project (3150-0104), Office Of Management And Budget, Washington, DC 20503. If an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6 PAGE (3) Byron Station, Unit 1 STN 05000454 (If more space is required, use additional copies of NRC Form 366A)(17)

F. Previous Occurrences:

There were no previous occurrences of a violation of licensed maximum power level due to the UFMS system noise. Byron reported an overpower of 0.12% on Unit 1 and 2 due to personnel error while using the UFMS system (LER 2001-001-01 dated June 14, 2001.)

G. Component Failure Data:

N/A (K1BYR_DOCS1 LERS12003Iers1454-2003-003-00.doc)