05000529/LER-2003-003, Corrected Copy of Letter for LER 03-003-00 for Palo Verde, Unit 2

From kanterella
(Redirected from 05000529/LER-2003-003)
Jump to navigation Jump to search
Corrected Copy of Letter for LER 03-003-00 for Palo Verde, Unit 2
ML040500240
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/21/2004
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
192-01133-DMS/SAB/DGM/DFH LER 03-003-00
Download: ML040500240 (1)


LER-2003-003, Corrected Copy of Letter for LER 03-003-00 for Palo Verde, Unit 2
Event date:
Report date:
5292003003R00 - NRC Website

text

CORRECTED COPY - Letter date - (year only)

Jlhh_' I -

A_s Palo Verde Nuclear Generating Station David M. Smith Plant Manager 1 OCFR50.73 Tel: 623-393-6116 Mail Station 7602 Fax: 623-393-6077 PO Box 52034 e-mail:

Phoenix, Arizona 85072-2034 DSMITH10@apsc.com 192-01133-DMS/SAB/DGM/DFH JanuaFy 21, 2003 January 21, 2004 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 2 Docket No. STN 50-529 License No. NPF-51 Licensee Event Report 2003-003-00 Attached, please find Licensee Event Report (LER) 50-529/2003-003-00 that has been prepared and submitted pursuant to 10CFR50.73. The LER reports a condition where a Source Range Monitor was inoperable at the start of core reload while loading the first two fuel assemblies, following a refueling outage involving complete core off load.

In accordance with 10CFR50.4, a copy of this LER is being forwarded to the NRC Regional Office, NRC Region IV and the Resident Inspector. If you have questions regarding this submittal, please contact Daniel G. Marks, Section Leader, Regulatory Affairs, at (623) 393-6492.

Arizona Public Service Company makes no commitments in this letter. The corrective

- actions described in this LER are not necessary to maintain compliance with - -

regulations.

Sincerely, j

DMS/SAB/DGMWDFH/kg Attachment cc:

B. S. Mallett N. L. Salgado M. B. Fields NRC Region IV Administrator NRC Senior Resident Inspector for PVNGS NRC NRR Project Manager HS17 9-;