05000445/FIN-2010006-05
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Provide Accurate Information in Response to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients |
| Description | The team identified a noncited violation of 10 CFR 50.9, Completeness and Accuracy of Information, which states, in part, that information provided to the Commission by a licensee shall be complete and accurate in all material respects. Specifically, on June 20, 2007, the licensee asserted in their response to Generic Letter 2007-01, Inaccessible or Underground Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients, Request 2, that Comanche Peak periodically performs visual inspection for corrosion and degradation of cable tray supports and a preventive maintenance program for inspection/removal of water from manholes. The team determined the licensee had no preventive maintenance program or procedures in place to govern the inspection or preventive maintenance activities described in their response, and there was no evidence that these manholes, raceways, and supports had ever been inspected prior to November 2009. This finding was entered into the licensees corrective action program as Condition Report CR-2010- 005784. The team determined that the failure to provide accurate information in the licensees response to Generic Letter 2007-01 was a performance deficiency. The finding is more than minor because the information was material to the NRCs decision-making processes. Specifically, the information requested by Generic Letter 2007-01 was to enable NRC staff to determine whether the applicable regulatory requirements identified in the generic letter (10 CFR Part 50, Appendix A, General Design Criteria 4, 17, and 18; 10 CFR 50.65(a)(1); 10 CFR Part 50, Appendix B, Criterion XI), were being met with regard to the operational readiness of critical systems that could cause a plant transient or mitigate accidents, and to obtain further information on cable failures. |
| Site: | Comanche Peak |
|---|---|
| Report | IR 05000445/2010006 Section 1R21 |
| Date counted | Jun 30, 2010 (2010Q2) |
| Type: | TEV: Severity level IV |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | B Rice J Leivo J Watkins K Clayton M Yeminy P Goldberg R Caniano W Sifre |
| INPO aspect | |
| ' | |