| Title | Inadequate Alternative Shutdown Procedure |
| Description | The inspectors identified a noncited violation of Technical Specification 5.4.1.d for the failure to maintain adequate written procedures covering fire protection program implementation. Specifically, during operator walkthroughs, the inspectors identified that Procedure ABN-803A, Response to a Fire in the Control Room or Cable Spreading Room, Revision 8, used to perform an alternative shutdown from outside of the control room, had two examples of critical actions that could not be completed in the time required by the postfire safe shutdown analysis. The steps to respond to a potential spurious opening of the train A power-operated relief valve and a potential loss of station service water cooling to the emergency diesel generator were not completed within the maximum allowable times specified in the procedure. As a compensatory measure, the licensee issued night orders to alert operators of these procedural concerns. The licensee entered the finding into their corrective action program as Smart Form SMF-2009-004455-00. Failure to provide adequate procedural guidance to implement the requirements of the approved fire protection program was a performance deficiency. This finding was more than minor because it was associated with the protection against external factors attribute of the Mitigating Systems cornerstone, and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to external events (such as fire) to prevent undesirable consequences. Based on the senior reactor analysts significance determination process Phase 3 analysis, this finding was determined to have very low safety significance. The finding did not have a crosscutting aspect because it was not representative of current licensee performanc |
| Site: | Comanche Peak |
|---|---|
| Report | IR 05000445/2009004 Section 4OA5 |
| Date counted | Sep 30, 2009 (2009Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | |
| Inspectors (proximate) | P Elkmann W Walker B Tindell R Hagar J Mateychick J Kramer |
| INPO aspect | |
| ' | |