Finding | |
|---|---|
| Title | Inadequate Test Control of the Diesel Generator Air Starting System |
| Description | The team identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion XI, Test Control, which states, in part, that all testing required to demonstrate that structures, systems, components will perform satisfactorily in service is identified and performed in accordance with written test procedures which incorporate the requirements and acceptance limits contained in applicable design documents. Specifically, as of June 18, 2010, the licensee failed to complete pre-operational testing required to demonstrate that the emergency diesel generator air start system receivers satisfied the requirements and acceptance limits contained in applicable design documents. This finding was entered into the licensees corrective action program as Condition Report CR-2010-005924. The team determined that the failure to ensure that the testing required to demonstrate that the Unit 1 emergency diesel generator air start systems will perform satisfactorily in service and in accordance with written test procedures which incorporated the requirements and acceptance limits contained in applicable design documents was a performance deficiency. The finding was more than minor because it was associated with the Mitigating Systems Cornerstone and affected the cornerstone objective of ensuring the availability, reliability and capability of safety systems that respond to initiating events to prevent undesirable consequences. The team performed a Phase 1 screening in accordance with Inspection Manual Chapter 0609, Attachment 4, Phase 1 Initial Screening and Characterization of Findings, and determined that the finding was of very low safety significance (Green) because it was a design or qualification issue confirmed not to result in a loss of operability or functionality, it did not result in the loss of a system safety function, it did not represent the loss of a single train for greater than technical specification allowed outage time, it did not represent a loss of one or more non-technical specification risk significant equipment for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and it did not screen as potentially risk significant due to seismic, flooding, or severe weather. This finding did not have a crosscutting aspect because the most significant contributor did not reflect current licensee performance |
| Site: | Comanche Peak |
|---|---|
| Report | IR 05000445/2010006 Section 1R21 |
| Date counted | Jun 30, 2010 (2010Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | B Rice J Leivo J Watkins K Clayton M Yeminy P Goldberg R Caniano W Sifre |
| INPO aspect | |
| ' | |