Title | Failure to Provide Required Electrical Isolation for Post-Fire Safe Shutdown Electrical Circuits |
Description | The inspectors identified a finding of very low safety significance and associated NCV of the Perry Nuclear Power Plant, Unit 1, Facility Operating License Condition 2.C.(6)and 10 CFR Part 50, Appendix R, Section III.G.3, for failure to provide the required electrical isolation in the design of the post-fire safe shutdown control logic circuitry. Specifically, the control logic for the Division 1 diesel generator building ventilation fan1M43-C001A did not have the required physical isolation to isolate control room fire induced electrical faults when transferring control to the remote shutdown station. This is required to ensure that postulated fire-induced electrical faults would not result in the loss of post-fire alternative safe shutdown equipment. The licensees immediate corrective action was to perform a preliminary evaluation of the electrical circuitry and cables. The licensee entered this finding into their corrective action program as CR 09-60873. The control room area, which is susceptible to this condition, is continuously manned; therefore making a compensatory action of a fire watch unnecessary. The finding was determined to be more than minor because the finding was associated with the mitigating systems cornerstone attribute of protection against external factors(Fire) and affected the cornerstones objective of ensuring the capability of systems that respond to initiating events to prevent undesirable consequences. The violation is associated with degradation of a fire protection feature. In accordance with IMC 0609,Significance Determination Process, Attachment 0609.04, Phase 1 - Initial Screening and Characterization of Findings, Table 3b, the inspectors determined the finding degraded the fire protection defense-in-depth strategies. Therefore, screening under IMC 0609, Appendix F, Fire Protection Significance Determination Process, was required. Using Part 1 of the Fire Protection SDP Phase 1 Worksheet in Manual Chapter0609, Significance Determination Process (SDP), the performance issue was determined to be in the post-fire safe shutdown category. The degradation rating was low based on FirstEnergy Nuclear Operating Companys (FENOCs) engineering evaluation that concluded that there were no fire induced electrical faults resulting from a control room fire that would prevent the plant from achieving and maintaining a safe shutdown in the event of a control room fire. Therefore, the finding screened as Green or of very low safety-significance in the Phase 1 Worksheet. This violation is being treated as a NCV consistent with Section VI.A of the Enforcement Policy. The cause of the finding related to the cross-cutting aspect of problem identification and resolution |
Site: | Perry |
---|---|
Report | IR 05000440/2009007 Section 1R05 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | Z Falevits R Daley R Winter G Hausman D Passehl |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |