| Q | CCA | Title |
---|
05000416/FIN-2012403-01 | 2012Q4 | | Security |
05000416/FIN-2012202-01 | 2012Q4 | H.5 | Security |
05000416/FIN-2012005-07 | 2012Q4 | | Failure to Establish Gain Settings on APRM and LPRM Instruments in Accordance with Design Requirements |
05000416/FIN-2012005-06 | 2012Q4 | H.8 | Failure to Evaluate the Risk Significances and Develop Action Plans to Address Equipment Identified During Extent of Condition Review for a Post Scram Root Cause Analysis |
05000416/FIN-2012005-05 | 2012Q4 | H.5 | Failure To Follow the Radiation Work Permit Requirements During Reactor Cavity High Water Operations |
05000416/FIN-2012005-04 | 2012Q4 | H.5 | Failure to Adequately Plan and Control Work Activities to Maintain ALARA |
05000416/FIN-2012005-03 | 2012Q4 | | Failure to Implement Adequate Procedure Instructions to Perform Preventive Maintenance Requiring the Periodic Replacement of the Control Relays in GE Magne Blast Circuit Breakers |
05000416/FIN-2012005-02 | 2012Q4 | H.8 | Failure to Adequately Monitor the Condition of the Auxiliary Building Water Intrusion Barrier |
05000416/FIN-2012005-01 | 2012Q4 | P.2 | Failure to Make Timely Corrective Actions to Repair the Degraded Auxiliary Building Water Intrusion Barrier |
05000416/FIN-2013002-02 | 2013Q1 | H.5 | Failure to Monitor for Ice on Standby Service Water Towers |
05000416/FIN-2013002-01 | 2013Q1 | H.7 | Failure to Properly Seal Safety-related Manholes |
05000416/FIN-2013002-03 | 2013Q1 | | Failure to Maintain Design Control for Setpoint Calculations |
05000416/FIN-2013002-04 | 2013Q1 | P.1 | Failure to Correct a Scaffold Affecting Fire Brigade Access |
05000416/FIN-2013002-05 | 2013Q1 | H.7 | Automatic Reactor Scram Caused by Ground Condition on the A Phase Neutral Current Transformer |
05000416/FIN-2013002-06 | 2013Q1 | | Inadequate Procedure for Removal of a Foreign Material Exclusion Plug |
05000416/FIN-2013002-07 | 2013Q1 | | Reactor Scram Due to Moisture in Isophase Bus Duct |
05000416/FIN-2013002-08 | 2013Q1 | H.8 | Failure to Revise the Scram Procedure After Temporary Modification |
05000416/FIN-2013201-01 | 2013Q2 | | 10 CFR 54.13 Apparent Violation for failure to provide complete and accurate information in response to RAIs |
05000416/FIN-2013003-01 | 2013Q2 | | Failure to Properly Implement a Compensatory Fire Watch per Station Fire Protection Procedures |
05000416/FIN-2013003-02 | 2013Q2 | | Failure to Revise Figures and Tables in the Updated Final Safety Analysis Report |
05000416/FIN-2013003-03 | 2013Q2 | | Failure to Correct a Nonconforming Condition with the Standby Diesel Generator Inlet Plenum Turning Vanes |
05000416/FIN-2013003-05 | 2013Q2 | H.2 | Failure to Verify the Residual Heat Removal B System was Full of Water Within its Specified Frequency |
05000416/FIN-2013003-04 | 2013Q2 | | Failure to Correct a Nonconforming Condition in the Train B Starting Circuit |
05000416/FIN-2013403-01 | 2013Q3 | | Security |
05000416/FIN-2013004-07 | 2013Q3 | H.8 | Failure to Follow Alarm Response Steps to Restore the TSE Following Maintenance |
05000416/FIN-2013004-06 | 2013Q3 | H.5 | Failure to Include Some Solid Radwaste Released in the 2012 Regulatory Guide 1.21 Annual Effluent Report |
05000416/FIN-2013004-05 | 2013Q3 | H.9 | Failure to Implement the Offsite Dose Calculation Manual |
05000416/FIN-2013004-04 | 2013Q3 | H.2 | Failure to Maintain Design Control of the Power Supplies for the Emergency Switchgear and Battery Room Fire Dampers |
05000416/FIN-2013004-03 | 2013Q3 | H.2 | Failure to Review Temporary Modifications by Operations Personnel During Turnover |
05000416/FIN-2013004-02 | 2013Q3 | | Failure to Obtain NRC Approval for a Change in Method of Evaluation for Determining Reactor Vessel Fluence |
05000416/FIN-2013004-01 | 2013Q3 | P.2 | Failure to Follow Procedure Results in Inadequate Operability Determination |