| Q | CCA | Title |
---|
05000416/FIN-2012002-04 | 2012Q1 | | Modification of the Spent Fuel Pool without Prior NRC Approval |
05000416/FIN-2012002-01 | 2012Q1 | H.8 | Failure to Take Timely Corrective Actions Associated with Division 1 and 2 Standby Service Water Safety Related Cables that were Partially Submerged in Cable Manhole/Vault |
05000416/FIN-2012002-02 | 2012Q1 | H.14 | Manual Reactor Scram Caused by Failure to Ensure the Main Steam Supply Valve to Reactor Feed Pump Turbine B was Full Open |
05000416/FIN-2012002-03 | 2012Q1 | H.1 | Failure to Perform an Online Risk Assessment Per Severe Weather Off Normal Procedure Due to a Declared Tornado Warning Affecting Grand Gulf Nuclear Station |
05000416/FIN-2012002-05 | 2012Q1 | H.5 | Failure to Correct a Condition Adverse to Fire Protection, in That the Licensee Failed to Adequately Provide Contingency Lighting in the Fire Brigade Dress Out Area While Normal Lighting was Inoperable |
05000416/FIN-2012003-06 | 2012Q2 | H.12 | Failure to Follow Procedure Results in Loss of Decay Heat Removal to the Spent Fuel Pool |
05000416/FIN-2012003-08 | 2012Q2 | H.2 | Failure of Hot-Work Fire Watch to Follow Procedural Requirements |
05000416/FIN-2012003-07 | 2012Q2 | H.14 | Inappropriate Use of Waivers to Allow Workers to Exceed the Minimum Day Off Rule |
05000416/FIN-2012003-05 | 2012Q2 | H.13 | Failure to Follow a Post-Modification Test Procedure |
05000416/FIN-2012003-04 | 2012Q2 | H.7 | Failure to Implement a Surveillance Requirement to Assure that the Limiting Condition for Operation Will be Met |
05000416/FIN-2012003-03 | 2012Q2 | | Loss of Alternate Method of Decay Heat Removal Due to Reactor Water Clean Up Pumps Tripping on Low Suction Flow Signal |
05000416/FIN-2012003-02 | 2012Q2 | H.9 | Inadequate Corrective Actions to Address Configuration Control of Previous Non-Cited Violation |
05000416/FIN-2012003-01 | 2012Q2 | P.1 | Failure to Ensure Materials are Stored Properly in the 500 KV Switchyard |
05000416/FIN-2012008-03 | 2012Q3 | | Failure to Obtain NRC Approval for a Change to Credible Passive Failures in the Standby Service Water System |
05000416/FIN-2012008-07 | 2012Q3 | | Potential Internal Flooding Caused by Circulation Water System Failure |
05000416/FIN-2012404-03 | 2012Q3 | H.12 | Security |
05000416/FIN-2012404-02 | 2012Q3 | H.10 | Security |
05000416/FIN-2012404-01 | 2012Q3 | H.2 | Security |
05000416/FIN-2012008-06 | 2012Q3 | P.5 | Failure to Incorporate Test and Inspection Requirements for 4160 Vac Circuit Breakers into Preventive Maintenance Procedures |
05000416/FIN-2012008-05 | 2012Q3 | H.13 | Failure to Follow Operability Determination Process Procedure |
05000416/FIN-2012008-04 | 2012Q3 | P.1 | Failure to Promptly Enter an NRC Violation Regarding the Standby Service Water System into the Corrective Action Program |
05000416/FIN-2012008-02 | 2012Q3 | P.2 | Failure to Establish a Testing Program for Safety-Related 125 Vdc Circuit Breakers |
05000416/FIN-2012008-01 | 2012Q3 | H.7 | Preconditioning of 4160 Vac Circuit Breakers for As-Found Tests |
05000416/FIN-2012004-02 | 2012Q3 | P.2 | Failure to Follow Procedure Results in Inadequate Operability Determination |
05000416/FIN-2012005-07 | 2012Q4 | | Failure to Establish Gain Settings on APRM and LPRM Instruments in Accordance with Design Requirements |
05000416/FIN-2012005-06 | 2012Q4 | H.8 | Failure to Evaluate the Risk Significances and Develop Action Plans to Address Equipment Identified During Extent of Condition Review for a Post Scram Root Cause Analysis |
05000416/FIN-2012005-05 | 2012Q4 | H.5 | Failure To Follow the Radiation Work Permit Requirements During Reactor Cavity High Water Operations |
05000416/FIN-2012005-04 | 2012Q4 | H.5 | Failure to Adequately Plan and Control Work Activities to Maintain ALARA |
05000416/FIN-2012202-01 | 2012Q4 | H.5 | Security |
05000416/FIN-2012403-01 | 2012Q4 | | Security |
05000416/FIN-2012005-03 | 2012Q4 | | Failure to Implement Adequate Procedure Instructions to Perform Preventive Maintenance Requiring the Periodic Replacement of the Control Relays in GE Magne Blast Circuit Breakers |
05000416/FIN-2012005-02 | 2012Q4 | H.8 | Failure to Adequately Monitor the Condition of the Auxiliary Building Water Intrusion Barrier |
05000416/FIN-2012005-01 | 2012Q4 | P.2 | Failure to Make Timely Corrective Actions to Repair the Degraded Auxiliary Building Water Intrusion Barrier |