Title | Failure to Perform a Timely Operability Evaluation Following the Discovery of a SSW Fan Failure Mechanism |
Description | The inspectors identified a Green finding involving the failure to perform an operability determination after a new failure mechanism was discovered for standby service water Fan B. The inspectors were performing a follow up review of a condition report that detailed a trip of Division 1 standby service water Fan B. The fan had tripped on start up from the control room on December 31, 2007.The licensee had initially determined the trip was due to a faulty solid state trip device. Subsequent testing in failed to identify a problem with the trip device, and the apparent cause of the fan trip was attributed to reverse rotation of the fan. Operations personnel were not informed of this new information as required by the corrective action program procedure. The licensee entered this issue into their corrective action program as Condition Report CR-GGN-2009-01726.This finding is more than minor because it was associated with the equipment performance attribute of the reactor safety mitigating systems cornerstone, and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using the Manual Chapter 0609, Significance Determination Process, Phase 1 Worksheet, the inspectors determined that the finding had very low safety significance (Green) since it did not represent an actual loss of a safety function of the standby service water cooling towers, nor did it screen as potentially risk significant due to a seismic, flooding, or severe weather-initiating event. The cause of this finding had a crosscutting aspect in the area of human performance associated with work practices in that licensee personnel failed to apply procedural requirements to write a new condition report when new information was acquired related to the trip of the Division 1 standby service water Fan B |
Site: | Grand Gulf ![]() |
---|---|
Report | IR 05000416/2009003 Section 4OA2 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | Finding: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | R Smith A Barrett G Miller B Correll |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |