October 1, 2009
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000416/2009402
Dear Mr. Douet:
On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Grand Gulf Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed during a pre-exit on August 7, 2009, with Ms. C. Perino, Manager, Licensing, and other members of your staff. On September 4, 2009, the final inspection results were presented to Mr. J. Browning, General Manager of Plant Operations, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before inspectors left the site.
UNITED STATES NUCLEAR REGULATORY COMMISSION R EGIO N I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.
- 2 - However, because of the very low security significance and because it was entered into your corrective action program, the NRC is treating this violation as a non-cited violation consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Grand Gulf Nuclear Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system, (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief
Plant Support Branch-1
Division of Reactor Safety
Docket Nos.: 50-416 License Nos.: NPF-29
Nonpublic Enclosure:
NRC Inspection Report 05000416/2009402 w/Attachment: Supplemental Information Entergy Operations, Inc.
- 3 - cc w/o enclosure:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Vice President, Oversight Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Senior Manager Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Manager, Licensing Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc.
- 4 - Distribution w/enclosure:
Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Senior Resident Inspector (Rich.Smith@nrc.gov)
Electronic distribution by RIV:
bcc w/o enclosure:
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Rich.Smith@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/C (David.Proulx@nrc.gov)
GG Site Secretary (Nancy.Spivey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource ROPreports DRS STA (Dale.Powers@nrc.gov)
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
Security-Related Complete Report - OUO:
SUNSI Review Completed: ___Y___
ADAMS: : Yes Initials: KSB
- Non-Publicly Available : Sensitive
Letter Only:
SUNSI Review Completed: __Y____
ADAMS: : Yes Initials: KSB
- Publicly Available
- Non-Sensitive
SPSI/PSB-1 PSI/PSB-1 PSI/PSB-1 C:PSB-1 C:PBC C:PSB-1 KBrooks JBuchanan PFrechette MPShannon GMiller MPShannon
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
10/1/09 10/1/09 10/1/09 10/1/09 10/1/09 10/1/09 OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax