September 8, 2009

SUBJECT:

GRAND GULF NUCLEAR STATION - NRC SECURITY TEMPORARY INSTRUCTION 2201/002 INSPECTION REPORT 05000416/2009405

Dear Mr. Douet:

On August 7, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a temporary instruction inspection at your Grand Gulf Nuclear Station. The inspection covered the transition from a contract security to a proprietary security force. The enclosed inspection report documents the inspection results, which were discussed on August 7, 2009, with Ms. C. Perino, Manager, Licensing, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

UNITED STATES NUCLEAR REGULATORY COMMISSION R EGIO N I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.

- 2 - In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response, Security-Related Information-Withhold Under 10 CFR 2.390, and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch - 1 Division of Reactor Safety

Docket: 50-416 License: NPF-29

Nonpublic Enclosure:

Inspection Report 05000416/2009405 (DRS)

w/Attachment: Supplemental Information

cc w/enclosure:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Senior Vice President and COO Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

Vice President, Oversight Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc.

- 3 - Senior Manager Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Manager, Licensing Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc.

- 4 - Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Senior Resident Inspector (Rich.Smith@nrc.gov)

Electronic distribution by RIV:

bcc w/o enclosure:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/C (David.Proulx@nrc.gov)

GG Site Secretary (Nancy.Spivey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource ROPreports DRS STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

S:DRS/REPORTS/GG 2009405-nonsgi-KSB.doc SUNSI Rev Compl.

7 Yes No ADAMS 7 Yes No Reviewer Initials KSB Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials KSB PSI:PSB PSI:PEER C:PSB C:PBC C:PSB KBrooks JBuchanan MShannon GMiller MShannon

/RA/

/RA/

/RA/

/RA/

/RA/

8/8/2009 9/1/2009 9/2/2009 9/2/2009 9/8/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax