| | Q | CCA | Title |
|---|
| 05000293/FIN-2016003-04 | 2016Q3 | H.8 | Failure to Adequately Evaluate the Effect of Degraded Normally Energized Agastat relays on PCIVs Operability |
| 05000293/FIN-2016003-03 | 2016Q3 | | Failure to Properly Implement Agastat Control Relays Preventive Maintenance Procedure in Accordance with TS 5.4.1 |
| 05000293/FIN-2016003-02 | 2016Q3 | P.5 | Inadequate Operability Assessment on EDG B |
| 05000293/FIN-2016003-01 | 2016Q3 | P.2 | Process Radiation Monitor Subsystems 10 CFR 50.65(a)(2) Not Met |
| 05000293/FIN-2016403-02 | 2016Q4 | H.1 | Security |
| 05000293/FIN-2016403-10 | 2016Q4 | | Security |
| 05000293/FIN-2016004-05 | 2016Q4 | H.5 | Feedwater Regulating Valve Failure Results in Reactor Scram |
| 05000293/FIN-2016004-04 | 2016Q4 | H.14 | Failure to Correct a Condition Adverse to Quality Associated with Main Steam Isolation Valve |
| 05000293/FIN-2016004-02 | 2016Q4 | H.6 | Ineffective Corrective Actions to Correct High Pressure Coolant Injection System Vibrations |
| 05000293/FIN-2016403-01 | 2016Q4 | H.12 | Security |
| 05000293/FIN-2016403-03 | 2016Q4 | H.11 | Security |
| 05000293/FIN-2016403-04 | 2016Q4 | H.14 | Security |
| 05000293/FIN-2016403-06 | 2016Q4 | | Security |
| 05000293/FIN-2016004-03 | 2016Q4 | H.12 | Failure to Properly Assess and Manage Risk Associated with Shutdown Transformer Protective Relay Testing |
| 05000293/FIN-2016403-05 | 2016Q4 | H.7 | Security |
| 05000293/FIN-2016004-01 | 2016Q4 | H.14 | Failure to Promptly Perform an Operability Evaluation for a Recirculation Flow Converter |
| 05000293/FIN-2016011-10 | 2017Q1 | H.14 | Failure to Promptly Correct a Condition Adverse to Quality for the Residual Heat Removal System |
| 05000293/FIN-2017001-01 | 2017Q1 | | Concern Regarding Ability to Declare EALs during Loss of Control Room Air Conditioning |
| 05000293/FIN-2017406-01 | 2017Q1 | | Security |
| 05000293/FIN-2017001-04 | 2017Q1 | | Failure to Submit a Required 50.72 Notification |
| 05000293/FIN-2016011-07 | 2017Q1 | | Failure to Report Condition Prohibited by Technical Specifications and a Safety System Functional Failure |
| 05000293/FIN-2017001-03 | 2017Q1 | P.2 | Untimely Corrective Actions associated with Boraflex degradation in the Spent Fuel Pool |
| 05000293/FIN-2017001-02 | 2017Q1 | H.8 | Failure to Follow Procedures for Controlled Shutdown |
| 05000293/FIN-2016011-11 | 2017Q1 | H.3 | Failure to Adequately Develop and Implement Targeted Performance Improvement Plans |
| 05000293/FIN-2016011-09 | 2017Q1 | P.2 | Ineffective Corrective Actions to Address Conditions Adverse to Quality Regarding Components in Contact with or Close Proximity to the Drywell Liner |
| 05000293/FIN-2016011-08 | 2017Q1 | P.2 | Failure to Adequately Monitor the Performance of Maintenance Rule Scoped Components |
| 05000293/FIN-2016011-05 | 2017Q1 | H.1 | Failure to Establish Corrective Actions to Address Scope of Procedure Quality Issues |
| 05000293/FIN-2016011-04 | 2017Q1 | H.4 | Programmatic Issue with Implementation of the Operability Determination Process |
| 05000293/FIN-2016011-03 | 2017Q1 | H.8 | Failure to Issue Appropriate Corrective Actions to Preclude Repetition for the Causes of the September 2016 Scram |
| 05000293/FIN-2016011-02 | 2017Q1 | H.8 | Failure to Establish Corrective Actions to Preclude Repetition of a Significant Condition Adverse to Quality |
| 05000293/FIN-2016011-01 | 2017Q1 | H.12 | Failure to Identify All Root Causes of a Significant Condition Adverse to Quality |
| 05000293/FIN-2016011-06 | 2017Q1 | | Design Change Not Appropriately Reviewed by Entergy |