Finding | |
---|---|
Title | Untimely Corrective Actions associated with Boraflex degradation in the Spent Fuel Pool |
Description | Green. The inspectors identified a Green NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Actions, when Entergy did not take timely corrective action to correct a condition adverse to quality. Specifically, when BADGER testing results revealed gaps in 4 neutron absorber material that exceeded spent fuel storage design feature assumptions and therefore did not ensure compliance with TSs, the station did not establish corrective actions to ensure configurations and limitations would meet subcriticality analysis beyond September 2017. Entergy entered this into the CAP as CR 2017-1650 and is performing a root cause evaluation to evaluate options and establish corrective actions to ensure compliance is met beyond this timeframe. The performance deficiency was more than minor because it was associated with the Barrier Integrity cornerstone attribute of configuration control (reactivity control) and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 3 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, the inspectors determined that this finding is of very low safety significance (Green) because the finding did not adversely affect any of the barrier integrity screening questions. The inspectors determined this finding had a cross-cutting aspect in Problem Identification and Resolution, Evaluation, because the organization did not thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance. Specifically, the casual evaluation written to address the boraflex degradation was focused on restoring compliance and correcting immediate condition, and did not include longer term corrective actions to mitigate the likelihood of recurrence. [P.2] |
Site: | Pilgrim |
---|---|
Report | IR 05000293/2017001 Section 4OA2 |
Date counted | Mar 31, 2017 (2017Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Burritt B Pinson E Carfang J Vasquez L Brandt S Elkhiamy S Haney |
Violation of: | 10 CFR 50 Appendix B Technical Specification |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |