05000293/FIN-2016003-04
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Adequately Evaluate the Effect of Degraded Normally Energized Agastat relays on PCIVs Operability |
Description | The inspectors identified a Green NCV of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, because Entergy did not perform an immediate operability determination and adequately evaluate the operability of primary containment isolation valves (PCIVs) in accordance with procedure EN-OP-104, Operability Determinations/Functionality Assessments, Revision 10. Entergys immediate corrective actions included electrically deactivating two relays, 16A-K17X11 and 16AK18X11. Subsequently, two PCIVs, CV-5065-91 and CV-5065-92, were closed until all six relays were replaced. Entergy entered this issue into the CAP as CR-2016-04753. The inspectors determined that the performance deficiency was more than minor because it was associated with the Human Performance attribute of the Barrier Integrity cornerstone and adversely affected the objective of providing reasonable assurance that physical design barriers protect the public from postulated radionuclide releases caused by accidents or events. Specifically, Entergy did not perform a timely and adequate operability determination as required by procedure. It took Entergy 74 days and four different operability determinations upon discovery of the degraded relays to finally conclude that PCIVs CV-5065-91 and CV-5065-92 were operable. The inspectors determined that this finding is of very low safety significance (Green) in accordance with IMC 0609.04, initial Characterization of Findings, and Exhibit 3 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, issued June 19, 2013, because it did not result in an actual open pathway in the physical integrity of reactor containment and did not involve an actual reduction in function of hydrogen igniters in the reactor containment. The inspectors determined that this finding had a cross-cutting aspect in the area of Human Performance, Procedure Adherence, because Entergy did not initially evaluate the operability of the Agastat relays thoroughly as prescribed in EN-OP-104. Furthermore, Entergy failed to adequately evaluate the effect of the aging Agastat relays pertaining to the PCIVs operability. |
Site: | Pilgrim |
---|---|
Report | IR 05000293/2016003 Section 4OA2 |
Date counted | Sep 30, 2016 (2016Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Burritt B Fuller B Pinson D Werkheiser E Burket E Carfang J Brand J Pfingstein L Dumont M Fannon M Modes S Rich T Dunn |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |
Finding - Pilgrim - IR 05000293/2016003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Pilgrim) @ 2016Q3
Self-Identified List (Pilgrim)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||