| Q | CCA | Title |
---|
05000285/FIN-2013018-03 | 2014Q4 | | Failure to Furnish Evidence of Activities Affecting Quality |
05000285/FIN-2013018-04 | 2014Q4 | P.2 | Failure to Promptly Identify and Correct Inadequate Internal Flooding Analysis |
05000285/FIN-2013018-05 | 2014Q4 | H.14 | Use of Non-Conservative Inputs in Thermal Lag Analyse |
05000285/FIN-2013018-06 | 2014Q4 | H.14 | Failure to Recognize Adverse Design Changes |
05000285/FIN-2013018-07 | 2014Q4 | P.3 | Failure to Maintain Design Control of the Auxiliary Feedwater |
05000285/FIN-2014005-01 | 2014Q4 | P.2 | Failure to establish Appropriate Preventive Maintenance and Failure to Identify Raw Water SSC Maintenance Rule Performance Criteria Exceeded and thereby establish Monitoring Requirements for the SSC |
05000285/FIN-2014005-02 | 2014Q4 | H.5 | Failure to determine the availability of local population data for use in estimating changes in the EPZ population |
05000285/FIN-2013018-01 | 2014Q4 | | Failure to Correctly Translate Design Requirements into Installed Plant Configuration |
05000285/FIN-2013018-02 | 2014Q4 | H.2 | Use of Non-conservative Values in Design Analyses |
05000285/FIN-2015007-04 | 2015Q1 | | Inadequate Justification for Power Supplies Installed Beyond Vendor Recommended Life |
05000285/FIN-2015007-01 | 2015Q1 | | Failure to Perform an Adequate Battery Sizing and Load Profile Calculation |
05000285/FIN-2015007-05 | 2015Q1 | | Failure to Perform an Adequate Evaluation for the Auxiliary Building Crane |
05000285/FIN-2015007-06 | 2015Q1 | H.14 | Failure to Perform an Adequate Auxiliary Feedwater Pump Runout Design Calculation |
05000285/FIN-2015007-07 | 2015Q1 | H.7 | Failure to Perform an Adequate Evaluation for the Intake Structure Crane Trolley and Bridge Rail |
05000285/FIN-2015007-08 | 2015Q1 | H.6 | Failure to Obtain Prior NRC Approval for a Change in Seismic Analysis Damping |
05000285/FIN-2015007-10 | 2015Q1 | | Failure to Adequately Account for Raw Water Pump Discharge Check Valve Back Leakage |
05000285/FIN-2015007-12 | 2015Q1 | H.13 | Failure to Properly Implement Procedures for Verifying Operator Time Critical Actions |
05000285/FIN-2015008-04 | 2015Q1 | | Failure to Make Required Licensee Event Report |
05000285/FIN-2015010-01 | 2015Q1 | | Failure to Provide Complete and Accurate Information on Licensed Operator Applications |
05000285/FIN-2015008-02 | 2015Q1 | | Unresolved Item associated with the weld repair of SI-339 vent pipe leakage |
05000285/FIN-2015007-09 | 2015Q1 | | Intake Structure Design Requirements |
05000285/FIN-2015007-11 | 2015Q1 | | Raw Water Strainer Analysis and Commercial Dedication |
05000285/FIN-2015001-03 | 2015Q1 | | Required In-Service Testing for Steam Generator Auxiliary Feedwater Inlet Valves |
05000285/FIN-2015007-02 | 2015Q1 | H.7 | Failure to Establish Correct Acceptance Criteria Values for Battery Intercell Resistance Measurements |
05000285/FIN-2015008-03 | 2015Q1 | H.8 | Failure to Promptly Identify and Correct a Condition Adverse to Quality |
05000285/FIN-2015008-01 | 2015Q1 | H.11 | Failure to Follow Procedure during an Operability Determination |
05000285/FIN-2015007-03 | 2015Q1 | P.5 | Failure to Account for Elevated Battery Room Temperature Effects on Battery Service Life |
05000285/FIN-2015001-01 | 2015Q1 | H.3 | Failure to Conduct and Evaluate Simulator Testing In Accordance with ANSI/ANS-3.5-2009 |
05000285/FIN-2015001-02 | 2015Q1 | H.3 | Failure to Implement Risk Management Actions for Planned Maintenance Activities |
05000285/FIN-2015002-08 | 2015Q2 | | Failure to Submit Summaries of the Impact of Changes to the Emergency Plan and Implementing Procedures |
05000285/FIN-2015002-01 | 2015Q2 | H.14 | Failure to Include a Class 1 Component in the Reactor Vessel Pressure Boundary Integrity Test |
05000285/FIN-2015002-02 | 2015Q2 | H.14 | Failure to Perform a Valid 40-Month Inservice Test |
05000285/FIN-2015002-03 | 2015Q2 | H.14 | Failure to Establish Adequate Work Instructions to Clean and Inspect the Reactor Vessel Head |
05000285/FIN-2015002-04 | 2015Q2 | | Failure to Incorporate Vendor Manual Recommendations for Conducting Preventative Maintenance on the Reactor Vessel Head Vent Valve |
05000285/FIN-2015002-05 | 2015Q2 | H.10 | Failure to Promptly Identify and Correct a Condition Adverse to Quality Involving a Spent Fuel Pool Cooling Vent Valve Leak |
05000285/FIN-2015002-06 | 2015Q2 | H.2 | Failure to Identify and Correct Loose Incore Instrument Nozzle Connection |
05000285/FIN-2015002-07 | 2015Q2 | H.9 | Failure to Perform Functionality Assessments for the Spent Fuel Pool Cooling System |
05000285/FIN-2015002-09 | 2015Q2 | H.5 | Failure to Follow Instructions and Procedures Related to Snubber Activities |
05000285/FIN-2015003-01 | 2015Q3 | P.2 | Failure to Maintain Safety Injection Tank Boron Concentration within Technical Specification Limits |
05000285/FIN-2015003-02 | 2015Q3 | H.1 | Failure to Maintain Fire Watch and Fire Watch Logs |
05000285/FIN-2015011-03 | 2015Q3 | H.10 | Failure to Correct a Non-Conforming Condition Associated with Auxiliary Feedwater Valves |
05000285/FIN-2015011-02 | 2015Q3 | H.13 | Failure to Establish a Technical Basis for Operability of the Auxiliary Feedwater System |
05000285/FIN-2015011-01 | 2015Q3 | P.5 | Failure to Ensure the Suitability of Replacement Materials during the Design Review Process |