| Q | CCA | Title |
---|
05000275/FIN-2010005-06 | 2010Q4 | P.2 | Inadequate Emergency Diesel Generator Surveillance Testing |
05000275/FIN-2010005-05 | 2010Q4 | H.7 | Less than Adequate Containment Recirculation Sump Design Control |
05000275/FIN-2010005-04 | 2010Q4 | H.14 | Inadequate Operability Determinations |
05000275/FIN-2010005-02 | 2010Q4 | H.7 | Inadequate Transient Combustibles Procedure |
05000275/FIN-2010005-01 | 2010Q4 | P.3 | Failure to Maintain a Fire Barrier |
05000275/FIN-2010005-03 | 2010Q4 | | Corrosion of Containment Fan Cooler Unit Cooling Coil Casings |
05000275/FIN-2010005-07 | 2010Q4 | P.6 P.3(c) | Inadequate Quality Verification Audits |
05000275/FIN-2011002-02 | 2011Q1 | H.7 | Failure to Document Design Basis of Containment Fan Cooler Unit Cooling Coil Casings |
05000275/FIN-2011402-04 | 2011Q1 | | Security |
05000275/FIN-2011402-03 | 2011Q1 | | Security |
05000275/FIN-2011402-02 | 2011Q1 | H.2 | Security |
05000275/FIN-2011402-01 | 2011Q1 | H.5 | Security |
05000275/FIN-2011002-04 | 2011Q1 | H.11 H.12 | Inadequate Design Control for the Auxiliary Building Ventilation System Control Panel Modification |
05000275/FIN-2011002-03 | 2011Q1 | H.14 | Requirement to Perform an Operability Evaluation Following Receipt of New Seismic Information |
05000275/FIN-2011002-01 | 2011Q1 | P.2 | Inadequate Design Control for the Preferred Offsite Power System |
05000275/FIN-2011003-06 | 2011Q2 | P.2 | Less than Adequate Evaluation of New Security Modifications |
05000275/FIN-2011003-05 | 2011Q2 | | Inadequate Review of Severe Accident Management Guidelines |
05000275/FIN-2011003-04 | 2011Q2 | H.8 | Failure to Follow Procedures for Testing HEPA Ventilation Units |
05000275/FIN-2011003-03 | 2011Q2 | H.12 | Unplanned Loss of Preferred Offsite Power Due to the Failure to Follow Work Instructions |
05000275/FIN-2011003-02 | 2011Q2 | H.5 | Unplanned Loss of Preferred Offsite Power Due to Less than Adequate Work Planning |
05000275/FIN-2011003-01 | 2011Q2 | P.2 | Inadequate Fire Hazard Evaluations |
05000275/FIN-2011004-04 | 2011Q3 | P.2 | Failure to Perform Surveillances on Fire Barriers |
05000275/FIN-2011004-05 | 2011Q3 | H.14 | Failure to Ensure Emergency Response Organization Qualifications |
05000275/FIN-2011004-06 | 2011Q3 | H.8 | Failure to Follow a Procedural Requirement for Reactivity Manipulation |
05000275/FIN-2011004-03 | 2011Q3 | P.3 | Failure to Maintain a Fire Barrier |
05000275/FIN-2011004-01 | 2011Q3 | H.5 | Failure to Maintain the Control Room Habitability System in the Design Configuration |
05000275/FIN-2011403-01 | 2011Q3 | | Security |
05000275/FIN-2011004-02 | 2011Q3 | | Inconsistent Control Room In-Leakage Test Results Reported to NRC |