IR 05000275-11-404, 05000323-11-404; on 05/13/2011; Diablo Canyon Power Plant, Units 1 & 2; NRC Material Control and Accounting Program Inspection (Cover Letter)
ML111470833
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/27/2011
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Conway J
Pacific Gas & Electric Co
References
IR-11-404
Download: ML111470833 (3)


Text

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N May 27, 2011

SUBJECT:

DIABLO CANYON POWER PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000275/2011404, 05000323/2011404

Dear Mr. Conway:

On May 13, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on May 13, 2011, with Mr. J. Becker, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. Pacific Gas and Electric Company -2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Gregory E. Werner, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:

NRC Inspection Report 05000275/2011404; 05000323/2011404 w/Attachment: Supplemental Information cc w/o enclosure:

James R. Becker, Site Vice President Pacific Gas and Electric Company Diablo Canyon Nuclear Plant P.O. Box 56, Mail Station 104/6/601 Avila Beach, CA 93424 Jennifer Post, Esq.

Pacific Gas & Electric Co.

77 Beale Street, Room 2496 Mail Code B30A San Francisco, CA 94120 Pacific Gas and Electric Company -3-bcc w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Senior Resident Inspector (Michael.Peck@nrc.gov)

Electronic distribution by RIV:

bcc w/o enclosure:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

DC Administrative Assistant (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

Security-Related Complete Report - OUO Security-Related Information SUNSI Review Completed: LCC2 ADAMS: Yes Initials: LCC2 Non-Publicly Available Sensitive Letter Only:

SUNSI Review Completed: LCC2 ADAMS: Yes Initials: LCC2 Publicly Available Non-Sensitive PSB2 PSB2 C:PSB2 C:DRP/ C:PSB2 CAlldredge LCarsonII GEWerner GMiller GEWerner

/RA/ /RA/ /RA/ /RA/ /RA/

5/23/2011 5/23/11 5/26/11 5/26/11 5/27/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax