Finding | |
---|---|
Title | Inadequate Review of Severe Accident Management Guidelines |
Description | The inspectors identified a finding after Pacific Gas and Electric failed to periodically review and update the severe accident management guidelines. Procedure OM10.ID5, Severe Accident Management, required the licensee to review and update the severe accident management guidelines biennially to ensure that any changes in plant design or procedures, experience in severe accident management requalification training, and any changes in industry understanding of severe accidents were incorporated into the severe accident management guidelines. As a result of the licensees failure to implement the periodic review, the severe accident management guidelines did not incorporate the latest owners group guidance or recent plant design and hardware changes. The licensee took corrective actions to implement the biennial reviews and entered this finding into the corrective action program as Notification 50399554. Pacific Gas and Electrics failure to follow procedural requirements for periodic review of the severe accident management guidelines was a performance deficiency. The finding was more than minor because if left uncorrected, the failure to review and update the severe accident management guidelines has the potential to lead to a more significant safety concern. This finding affected the barrier integrity cornerstone because the severe accident management guidelines are procedures that would be used to maintain the functionality of the containment should a severe accident occur. The inspectors concluded that the finding was of very low safety significance because it did not represent a degradation of the radiological, smoke, or toxic atmosphere barrier function; or represent an actual open pathway in the physical integrity of the reactor containment; or involve the function of the containment hydrogen igniters. The finding did not have any crosscutting aspects because the performance deficiency occurred more than three years ago and is not indicative of current licensee performance in that the licensee has improved the design review process since the performance deficiency occurred. |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2011003 Section 4OA5 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | Finding: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | I Anchondo C Alldredge N Greene L Micewski M Peck L Carson S Garchow L Willoughby G Miller W Sifre C Osterholtz |
INPO aspect | |
' | |