Finding | |
---|---|
Title | Inadequate Design Control for the Auxiliary Building Ventilation System Control Panel Modification |
Description | The inspectors reviewed a self-revealing noncited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, after Pacific Gas and Electric failed to ensure that the design basis requirements for single failure criteria were correctly translated into auxiliary building ventilation system controls modifications. On January 10, 2011, a single failure of a Unit 2 auxiliary building ventilation Train A damper resulted in the loss of system safety function for both trains. The loss of safety function occurred because of a logic error in the programmable logic controllers. The licensee programmed and installed the logic controllers in November 2010 for Unit 1 and in November 2009 for Unit 2. The inspectors identified that the engineering department performed a less than adequate review to identify the single point vulnerability during the modification review process. Pacific Gas and Electric entered this issue into the corrective action program as Notification 50370698, replaced the failed damper, and implemented compensatory actions to mitigate the design deficiency. The licensee plans to implement corrective actions to program the logic controller program consistent with the design basis requirements. The inspectors concluded that the failure to ensure that the modification met design basis requirements was a performance deficiency. This performance deficiency is more than minor because it was associated with the design control attribute of the Barrier Integrity Cornerstone and affected the cornerstone objective to provide reasonable assurance that physical design barriers and radiological barriers, including the Auxiliary Building, protect the public from radionuclide releases caused by accidents or events. The inspectors determined that the finding had very low safety significance because the finding only represents degradation to the radiological barrier function provided for the auxiliary building. This finding had a crosscutting aspect in the area of human performance associated with work practices because the licensee did not ensure human error prevention techniques, such as self and peer checking, were effectively used in the preparation of the modification H.4(a). |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2011002 Section 1R18 |
Date counted | Mar 31, 2011 (2011Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.18 |
Inspectors (proximate) | D Reinert J Braisted C Denissen P Goldberg M Peck G Miller |
CCA | H.12, Avoid Complacency |
INPO aspect | QA.4 |
' | |