Title | Failure to Document Design Basis of Containment Fan Cooler Unit Cooling Coil Casings |
Description | The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, that measures shall be established to assure that applicable regulatory requirements and the design basis are correctly translated into specifications, drawings, procedures, and instructions. Specifically, prior to December 15, 2010, the licensee failed to assure that the design basis function of the containment fan cooler unit casings was translated into specifications, drawings, procedures, and instructions. The licensee has entered this violation into the corrective action program as Notification 50384801. The inspectors determined that the failure to establish measures to assure that the design basis function of the containment fan cooler unit cooling coil casings was translated into specifications, drawings, procedures, and instructions was a performance deficiency. The finding was more than minor because it adversely affected the barrier integrity cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radionuclide releases caused by accidents or events. Using Inspection Manual Chapter 0609, Attachment 4, Initial Screening and Characterization of Findings, the finding was determined to be of very low safety significance (Green) because it did not represent a degradation of the barrier function of the control room against a smoke or toxic barrier, an open pathway in the physical integrity of reactor containment, or an actual reduction in function of hydrogen igniters in the reactor containment. The inspectors determined that this finding has a crosscutting aspect in the area of human performance because the licensee failed to ensure that personnel, equipment, procedures and other resources were available to assure nuclear safety by maintaining complete, accurate and up-to-date design documentation H.2(c). |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2011002 Section 1R07 |
Date counted | Mar 31, 2011 (2011Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.07 |
Inspectors (proximate) | D Reinert J Braisted C Denissen P Goldberg M Peck G Miller |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |