Finding | |
---|---|
Title | Failure to Perform an Operability Determination for New Seismic Information |
Description | The inspectors identified a non-cited violation of 10 CFR Part 50, Appendix B, Criteria V, Instructions, Procedures, and Drawings, after Pacific Gas and Electric failed to evaluate the effect of new seismic information on the operability of plant structures, systems and components. On January 7, 2011, the licensee completed and submitted to the NRC a report detailing the results of a deterministic reevaluation of the local seismology. This report concluded that an earthquake on three local faults could produce greater vibratory ground motion than the safe shutdown earthquake as described in the Final Safety Evaluation Report Update. Quality Procedure OM7.ID12, Operability Determinations, required plant operators to assess the impact of nonconforming conditions for the effect on plant structures, systems and components without delay. On June 22, 2011, the licensee entered the condition into the corrective action program as Notification 50410266 and completed an operability determination on June 24, 2011. The inspectors determined that the licensees failure to promptly evaluate the new seismic information against the plant design and licensing bases was a performance deficiency. The finding was more than minor because the performance deficiency was associated with the Mitigating Systems Cornerstone initial design control attribute and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The senior reactor analyst evaluated the significance of the finding using a Phase 3 analysis because the inspectors were unable to confirm that the operability of plant systems was not impacted. The senior reactor analyst concluded that the finding was of very low risk significance (Green) because no significant change in overall core damage frequency resulted from the new seismic hazards. This finding had a cross-cutting aspect in the area of human performance associated with the decision-making component because the licensee used non-conservative assumptions in deciding not to evaluate the new seismic information against the current plant design and licensing bases [H.1.(b)] |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2011005 Section 1R15 |
Date counted | Dec 31, 2011 (2011Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | E Ruesch D Reinert C Alldredge L Micewski N Makris L Ricketson G Guerra M Peck N O'Keefe M Young A Fairbanks |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |
Finding - Diablo Canyon - IR 05000275/2011005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Diablo Canyon) @ 2011Q4
Self-Identified List (Diablo Canyon)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||