| Q | CCA | Title |
---|
05000255/FIN-2014004-03 | 2014Q3 | | Failure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers |
05000255/FIN-2014004-02 | 2014Q3 | P.5 | Spent Fuel Pool Region II Criticality Analysis |
05000255/FIN-2014004-01 | 2014Q3 | H.9 | Inadequate Procedure for Protection against High Winds |
05000255/FIN-2014005-01 | 2014Q4 | P.1 | Failure to Follow Procedure for Storage of Equipment in the Vicinity of Safety-Related Equipment |
05000255/FIN-2014008-10 | 2014Q4 | | Lack of Analysis for Electrical Containment Penetration Protection |
05000255/FIN-2014008-11 | 2014Q4 | | Classification of CCW Piping and Components Inside the Reactor Containment Building |
05000255/FIN-2014008-12 | 2014Q4 | | Component Cooling Water System Licensing Bases |
05000255/FIN-2014008-09 | 2014Q4 | | Failure To Include The Degraded Voltage Channel Time Delay In TS Surveillance Requirement 3.3.5.2.a |
05000255/FIN-2014008-08 | 2014Q4 | H.14 | Failure to Establish an Adequate Test Program for the Shutdown Cooling Heat Exchangers |
05000255/FIN-2014008-07 | 2014Q4 | | Failure to Identify Non-Safety-Related Sub-Components Improperly Supplied with Safety-Related Valves |
05000255/FIN-2014008-06 | 2014Q4 | | Failure to Correctly Translate Valve Leakage Limits into Test Procedure |
05000255/FIN-2014405-01 | 2014Q4 | | Security |
05000255/FIN-2014008-13 | 2014Q4 | H.1 | Non-Conservative Surveillance for Emergency Diesel Generator Largest Load Reject Test |
05000255/FIN-2014008-05 | 2014Q4 | P.2 | Failure to Perform Comprehensive Pump Testing of Containment Spray Pump P-54A in accordance with the Inservice Testing Program |
05000255/FIN-2014008-04 | 2014Q4 | | Failure to Ensure that 480V System Voltages do not Exceed Equipment Ratings |
05000255/FIN-2014008-03 | 2014Q4 | H.6 | Undersized Motors |
05000255/FIN-2014008-02 | 2014Q4 | H.6 | Undersized Supply Cables from Startup Transformer to 2400V Buses |
05000255/FIN-2014008-01 | 2014Q4 | | Failure to Ensure Engineered Safeguards Systems Arent Adversely Affected By Air Entrainment |
05000255/FIN-2014010-01 | 2014Q4 | H.3 | Failure to Monitor The Highest Exposed Part Of The Compartment When Using EDEX |
05000255/FIN-2015013-03 | 2015Q1 | | Failure to perform the surveillance test within 24 hours or perform a risk evaluation to complete the surveillance at a later date |
05000255/FIN-2015001-03 | 2015Q1 | | Turbine-Driven AFW Pump Trip During Surveillance Testing |
05000255/FIN-2015013-01 | 2015Q1 | | Willful failure to enter information concerning a leak in the SIRWT into the corrective action program |
05000255/FIN-2015001-01 | 2015Q1 | H.12 | Inadequate Procedure Results in Failure of Component Cooling Water Pump |
05000255/FIN-2015001-05 | 2015Q1 | | Failure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers |
05000255/FIN-2015001-07 | 2015Q1 | H.5 | Inadequate Procedure Leads to Primary Coolant Pump Seal Degradation |
05000255/FIN-2015009-02 | 2015Q1 | | Unqualified Non-Destructive Examinations of J-Groove Welds 29 and 30 |
05000255/FIN-2015009-01 | 2015Q1 | P.2 | Failure to Determine the Cause of Head Penetration Nozzle J-Groove Weld Cracking |
05000255/FIN-2015001-06 | 2015Q1 | H.14 | Failure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers |
05000255/FIN-2015001-04 | 2015Q1 | | Failure to Verify the Adequacy of Credited High Energy Line Break Barriers |
05000255/FIN-2015001-02 | 2015Q1 | H.12 | Inoperability of Safety Injection Tank Due to Long-Term Leakage |