| Q | CCA | Title |
---|
05000255/FIN-2013005-01 | 2013Q4 | H.9 | Failure to Complete a Transient Combustible Evaluation |
05000255/FIN-2013005-06 | 2013Q4 | | Qualification Basis for Safety-Related Agastat Relays and Molded Case Circuit Breakers |
05000255/FIN-2013005-03 | 2013Q4 | | Evaluation of HRA Controls on the Refuel Floor |
05000255/FIN-2013005-04 | 2013Q4 | | Evaluation of Dose Received by Workers Repairing Control Rod Drive 24 |
05000255/FIN-2013005-07 | 2013Q4 | | Periodic Design Basis Testing of Safety-Related Electrical Components |
05000255/FIN-2013005-05 | 2013Q4 | P.1 P.1(a) | Aging Effects of the Biological Shield Wall Wetted Environment Not Managed |
05000255/FIN-2013005-02 | 2013Q4 | H.8 | Three Examples of Inadequate Control of Entry into High Radiation Areas |
05000255/FIN-2014002-01 | 2014Q1 | H.3 | Inadequate Installation of Steam Generator Nozzle Dams |
05000255/FIN-2014403-01 | 2014Q1 | H.13 | Security |
05000255/FIN-2014406-01 | 2014Q1 | | Security |
05000255/FIN-2014406-02 | 2014Q1 | | Security |
05000255/FIN-2014002-06 | 2014Q1 | | Failure to Maintain Radiation Exposure ALARA on CRDM 24 Repairs |
05000255/FIN-2014002-03 | 2014Q1 | | Spent Fuel Pool Region II Criticality Analysis |
05000255/FIN-2014002-05 | 2014Q1 | | Failure to Follow Procedures During Reactor Vessel Head Lift |
05000255/FIN-2014002-04 | 2014Q1 | | Introduction of Foreign Material Into the SW System |
05000255/FIN-2014002-02 | 2014Q1 | P.2 | Failure to Complete Volumetric Examinations for DM Butt Welds in Branch Connections |
05000255/FIN-2014003-02 | 2014Q2 | H.8 | Exam Security Issues |
05000255/FIN-2014003-04 | 2014Q2 | H.4 | Failure to Evaluate Long-Term Scaffolds in Accordance with Procedures |
05000255/FIN-2014003-01 | 2014Q2 | | Written NRC Biennial Written Examinations Did Not Meet Qualitative Standards |
05000255/FIN-2014003-03 | 2014Q2 | | Failure to Notify the NRC Within 30 Days of Discovering Changes in Medical Conditions |
05000255/FIN-2014004-01 | 2014Q3 | H.9 | Inadequate Procedure for Protection against High Winds |
05000255/FIN-2014004-02 | 2014Q3 | P.5 | Spent Fuel Pool Region II Criticality Analysis |
05000255/FIN-2014004-03 | 2014Q3 | | Failure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers |