Issue date | Title | Topic | |
---|---|---|---|
ML20217K445 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20211P673 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20211A705 | 31 July 1999 | Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With | |
ML20209G063 | 30 June 1999 | Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20212H549 | 18 June 1999 | Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium |
ML20195E796 | 31 May 1999 | Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20206N743 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20205P540 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20204C820 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20199E467 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20195E832 | 31 December 1998 | 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With | Safe Shutdown Shutdown Margin Non-Destructive Examination Grab sample Fire Barrier Stroke time Temporary Modification Flow Induced Vibration |
ML20198D209 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20195J859 | 12 November 1998 | Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan | |
ML20195C427 | 6 November 1998 | Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle | Safe Shutdown Earthquake |
ML20155J302 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20154R498 | 20 October 1998 | Core Spray Sys Insp Program - 17R | EVT-1 |
ML20154L305 | 14 October 1998 | Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage | |
ML20154Q337 | 30 September 1998 | Rev 8 to Oyster Creek Cycle 17,COLR | |
ML20154L557 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20151V631 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20237D569 | 31 August 1998 | Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification | |
ML20237D571 | 18 August 1998 | Rev 0 to SE-000222-002, Core Plate Wedge Installation | Internal Flooding Foreign Material Exclusion Liquid penetrant Flow Induced Vibration |
ML20237B013 | 31 July 1998 | Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station | |
ML20236R051 | 30 June 1998 | Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station | |
ML20249B298 | 31 May 1998 | Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station | |
ML20248F353 | 21 May 1998 | Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted | Reverse polarity |
ML20247F189 | 5 May 1998 | Risk Evaluation of Post-LOCA Containment Overpressure Request | Probabilistic Risk Assessment Containment Hardened Vent Hardened vent |
ML20247G058 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station | |
ML20216K034 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station | |
ML20151Y465 | 31 March 1998 | Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept | |
ML20217A463 | 23 March 1998 | Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively | |
ML20212E229 | 4 March 1998 | Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected | Nondestructive Examination |
ML20216J084 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station | |
ML20203B278 | 16 February 1998 | 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures | Hot Short Safe Shutdown Reactor Vessel Water Level High Radiation Area Half scram Ultimate heat sink Stroke time Fuel cladding Scaffolding |
ML20203A380 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station | |
ML20198P179 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station | |
ML20217C759 | 31 December 1997 | 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station | NJPDES |
ML20197E913 | 30 November 1997 | Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station | |
ML20199E456 | 13 November 1997 | Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant | Fire Barrier |
ML20199D438 | 31 October 1997 | Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station | |
ML20202E851 | 21 October 1997 | Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included | |
ML20211M948 | 3 October 1997 | Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification | |
ML20198J736 | 30 September 1997 | Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station | |
ML20211B746 | 24 September 1997 | Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl | |
ML20210V018 | 31 August 1997 | Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station | |
ML20210L296 | 31 July 1997 | Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station | |
ML20149F996 | 18 July 1997 | Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station | |
ML20196H011 | 11 July 1997 | Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc | |
ML20210L308 | 30 June 1997 | Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station | |
ML20141H205 | 30 June 1997 | Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station |