ML20217H522 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With | |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212B926 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With | |
ML20210R343 | 31 July 1999 | Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With | |
ML20210E225 | 21 July 1999 | B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Pressure Boundary Leakage |
ML20209G175 | 8 July 1999 | SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) | |
ML20207H794 | 30 June 1999 | Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation | |
ML20207H807 | 30 June 1999 | Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations | Anticipated operational occurrence Hydrostatic |
ML20207H785 | 30 June 1999 | Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation | |
ML20207H777 | 30 June 1999 | Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 | |
ML20209H371 | 30 June 1999 | Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With | |
ML20207H756 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20207H762 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20195J800 | 31 May 1999 | Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With | |
ML20207B648 | 25 May 1999 | SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station | |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |
ML20206R699 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With | |
ML20195C796 | 28 April 1999 | Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) | Shutdown Margin |
M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) | 28 April 1999 | Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) | Shutdown Margin |
ML20205P700 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With | |
ML20205B509 | 26 March 1999 | SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 | Boric Acid VT-2 Incorporated by reference Scaffolding |
ML20205C510 | 21 March 1999 | Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections | Ultimate heat sink Offsite Circuit |
ML20204G383 | 19 March 1999 | Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 | Boric Acid VT-2 Incorporated by reference Scaffolding |
M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function | 17 March 1999 | Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function | Shutdown Margin |
ML20206A883 | 17 March 1999 | Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function | Shutdown Margin |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML20204H994 | 3 March 1999 | Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Boric Acid High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Affidavit Depleted uranium |
ML20204C767 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With | Annual Radiological Environmental Operating Report |
ML20199G827 | 31 December 1998 | Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept | |
ML20205M706 | 31 December 1998 | Unicom Corp 1998 Summary Annual Rept. with | |
ML20202F618 | 31 December 1998 | Cycle 8 COLR in ITS Format & W(Z) Function | Shutdown Margin |
ML20206B400 | 31 December 1998 | Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations | |
ML20199E637 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With | |
ML20202F602 | 31 December 1998 | Cycle 9 COLR in ITS Format & W(Z) Function | Shutdown Margin |
ML20196K673 | 31 December 1998 | 10CFR50.59 Summary Rept for 1998 | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal Packing leak Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Operating Basis Earthquake VT-2 Tornado Generated Missile Foreign Material Exclusion Frazil ice Fuel cladding Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Flow Induced Vibration Unidentified leak |
ML20207H773 | 30 November 1998 | Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 | |
ML20207H801 | 30 November 1998 | Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation | Anticipated operational occurrence Hydrostatic |
ML20198D150 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With | |
ML20196A419 | 19 November 1998 | Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB | |
ML20195F832 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With | |
05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a | 9 October 1998 | Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a | Safe Shutdown |
ML20207H767 | 5 October 1998 | Rv Weld Chemistry & Initial Rt Ndt | |
ML20154L550 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With | |
ML20197C905 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With | |
ML20151Z965 | 31 August 1998 | Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept | |
ML20238F655 | 28 August 1998 | SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams | VT-2 Incorporated by reference |
ML20237E233 | 21 August 1998 | Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20237B336 | 14 August 1998 | B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 | Hydrostatic Nondestructive Examination VT-2 Pressure Boundary Leakage |
ML20237B484 | 31 July 1998 | Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 |