Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18018B11518 January 2018Scram Summary 91-01 Relating to a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal Fault on August 13, 1991Reactor Vessel Water Level
Packing leak
Slow transfer
Post Accident Monitoring
Scram Discharge Volume
ML18018B11218 January 2018Scram Summary 91-01 Relating to an Event on August 13, 1991 Concerning a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal FaultReactor Vessel Water Level
Packing leak
Post Accident Monitoring
Residual transfer
Scram Discharge Volume
05000410/LER-2017-00228 November 2017Secondary Containment Inoperable Due to Wind Conditions
LER 17-002-00 for Nine Mile Point Nuclear Station, Unit 2 Regarding Secondary Containment Inoperable Due to Wind Conditions
High winds
05000220/LER-2017-0032 November 2017Automatic Reactor Scram due to Reactor Vessel Low Water Level
LER 17-003-00 for Nine Mile Point, Unit 1, Regarding Automatic Reactor Scram due to Reactor Vessel Low Water Level
05000410/LER-2017-0014 October 20171 OF 5
LER 17-001-00 for Nine Mile Point Nuclear Station, Unit 2, Regarding Automatic Reactor Scram due to High Reactor Pressure
Temporary Modification
05000220/LER-2017-00218 May 2017Manual Reactor Scram Due to Pressure Oscillations
LER 17-002-00 for Nine Mile Point Nuclear Station, Unit 1 Regarding Manual Reactor Scram Due to Pressure Oscillations
05000220/LER-2017-0018 February 2017Manual Reactor Scram Due to Hiah Turbine Vibration
LER 17-01-00 for Nine Mile Point Unit 1 RE: Manual Reactor Scram Due to High Turbine Vibration
NMP1L3129, LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration8 February 2017LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration
05000220/LER-2016-00226 September 2016Isolation of both Emergency Condensers due to loss of UPS 162B
LER 16-002-00 for Nine Mile Point, Unit 1, Regarding Isolation of Both Emergency Condensers due to Loss of UPS 1628
Half scram
Probabilistic Risk Assessment
05000220/LER-2016-00112 July 2016Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors
LER 16-001-00 for Nine Mile Point Nuclear Station Unit 1 Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors
05000410/LER-2016-0016 June 2016Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors
LER 16-001-00 for Nine Mile Point, Unit 2, Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors
05000410/LER-2015-00331 March 2016Primary Containment Isolation Function for some valves not maintained during Surveillance Testing
LER 15-003-01 for Nine Mile Point, Unit 2, Regarding Primary Containment Isolation Function For Some Valves Not Maintained During Surveillance Testing
Reactor Vessel Water Level
ML10055048415 February 2010Special Report: Inoperable Suppression Chamber Water Level Instrumentation
ML09036051721 January 2009Special Report: Inoperable Channel of Suppression Chamber Water Level Instrumentation
ML0534802052 December 2005Special Report for Nine Mile Point Unit 1 Re Channel #12 of the Containment Hydrogen Monitoring System Inoperable
ML05154003624 May 2005Special Report, Channel #11 of the Containment Hydrogen Monitoring Inoperable for Scheduled Preventive Maintenance
ML05096024217 December 2004Final Precursor Analysis - NMP-1 Grid LoopFitness for Duty
Mission time
ML05096025217 December 2004Final Precursor Analysis - NMP-2 Grid LoopFitness for Duty
Mission time
ML04343044922 November 2004Special Report for Nine Mile Point, Unit 1 Regarding Channel #12 of the Containment Hydrogen Monitoring System Removed from Service for Planned Maintenance
ML04253007327 August 2004Special Report for Nine Mile Point Unit 1 Re Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance
ML04181051518 June 2004Revised Special Report for Nine Mile Point, Unit 1 Re Channel #12 of the Containment Hydrogen Monitoring System Inoperable
ML0413204994 May 2004Special Report for Nine Mile Point Unit 1 Regarding Inoperability of Channel #12 of the Containment Hydrogen Monitoring System
ML0410603997 April 2004Special Report, Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Corrective Maintenance
ML03364049319 December 2003Special Report Regarding Channel #11 Containment Hydrogen Monitoring System Being Inoperable for Scheduled Preventive Maintenance
ML02213035723 July 2002Special Report for Nine Mile Point Unit 2 Re Noble Gas Activity Monitoring Instrumentation Inoperable for Greater than 72 Hours
ML18018B1117 March 2000LER 99-019-01 Supplement 1, for Nine Mile Point, Unit 2, Regarding Two Standby Liquid Control Valves Not Tested as Required by Technical Specification 4.0.5 and LER 99-010-01, Supplement 1, Unit 2 Reactor Trip Due to a Feedwater Master ..Probabilistic Risk Assessment
ML18018B07729 December 1997Letter Replying to Notice of Violation as Contained in NRC Inspection Report 50-220/97-07 and 50-410/97-07
ML18018B1174 September 1991NRC UPS Meeting
ML18018B25129 September 1978LER 78-034-00 for Nine Mile Point, Unit 2, Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples
ML18018B25224 August 1978LER 78-030-00, 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve ..
ML18018B25328 July 1978LER 78-029-00 for Nine Mile Point, Unit 2, Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications
ML18018B25425 July 1978LER 78-028-00 for Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been ExceededPower-Operated Valves
ML18018B25513 July 1978LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery of RE22D wit
ML18018B25621 June 1978LER 78-024-00 for Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results
ML18018B25712 June 1978LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery of Turbine ...
ML18018B2591 June 1978LER 78-019-00 for Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe
ML18018B25826 May 1978LER 78-009-01 for Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric ContactSquib
ML18018B26024 April 1978LER 78-018-00 for Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification
ML18018B2617 April 1978LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and RE04B ..
ML18018B26228 March 1978LER 78-014-00 and LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That #12 Control Room Air Treatment Fan Would Not Run
ML18018B26316 March 1978LER 78-011-00, LER 78-012-00 and LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2
ML18018B2641 March 1978LER 78-007-00, LER 78-008-00, LER 78-009-00 and LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed SectionsSquib
ML18018B26524 February 1978LER 78-006-00 for Nine Mile Point, Unit 1 Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression ChaSquib
ML18018B2667 February 1978LER 78-004-00 and LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovere
ML18094A03031 January 1978LER 1978-003-03 for Nine Mile Point Unit 1 Re Surveillance Test Found Main Steam High Flow Switch with Setpoint of 107.5 PSI
ML18018B12231 January 1978LER 78-002-00 for Nine Mile Point 1 Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00
ML18018B27013 January 1978Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. SpecBackfit
ML18094A02913 January 1978LER 1978-001-00 for Nine Mile Point Station Unit 1 Re Delta Temperature of Discharge Water Exceeded Specification 2.1.5 of Environmental Tech Specs
ML18018B13621 July 1977LER 77-032-00 for Nine Mile Point Unit 1 Regarding a Water Phase Material Sample in the Reactor Vessel Inspection Lapse During RefuelingBackfit
ML18018B14214 July 1977LER 77-029-00, 77-030-00, 77-031-00, 77-034-00, & 77-035-00 for Nine Mile Point Unit 1 Low-Low-Low Level Set Point Out of Specs on RE-18A, Vacuum Switch Trip & Reset Point on Torus Relief Valves Out of Specs, Weld Leak in Emergency CondenseHydrostatic