Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NL-18-039, LER 2018-001-00 for Indian Point, Unit 2 Re Penetration Indications Discovered During Reactor Pressure Vessel Head Inspection | 21 May 2018 | LER 2018-001-00 for Indian Point, Unit 2 Re Penetration Indications Discovered During Reactor Pressure Vessel Head Inspection | Non-Destructive Examination Weld Overlay VT-2 Liquid penetrant Pressure Boundary Leakage |
05000286/LER-2017-004 | 20 December 2017 | Reactor Trip Due to Main Generator Loss of Field LER 17-004-00 for Indian Point Unit 3, Regarding Reactor Trip Due to Main Generator Loss of Field | Temporary Modification |
ML17252A866 | 9 September 2017 | Letter Regarding a 04/26/1977 Occurrence Concerning Failure of Number 22 Main Steam Line Isolation Valve to Close to a Manual Signal Initiated by the Control Room Operator - Indian Point Unit No. 2 | |
05000247/LER-2015-001 | 29 August 2017 | Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size that Results in Exceeding the Allowed Leakage Rate for Containment LER 15-001-02 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size that Results in Exceeding the Allowed Leakage Rate for Containment | Time of Discovery Through-Wall Leak Through Wall Leak |
05000286/LER-2017-003 | 29 August 2017 | Condensate Storage Tank Declared Inoperable Per Technical Specification LER 17-003-00 for Indian Point, Unit 3, Regarding Condensate Storage Tank Declared Inoperable Per Technical Specification | Time of Discovery Non-Destructive Examination Through Wall Leak |
NL-17-107, LER 15-001-02 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate fo | 29 August 2017 | LER 15-001-02 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for | Time of Discovery Through-Wall Leak Through Wall Leak |
05000247/LER-2017-003 | 23 August 2017 | Technical Specification Violation of Section 3.3.1 RPS Instrumentation LER 17-003-00 for Indian Point Unit 2, Regarding Technical Specification Violation of Section 3.3.1 RPS Instrumentation | Safe Shutdown |
05000247/LER-2017-001 | 22 August 2017 | Manual Reactor Trip Due to Decreasing Steam Generator Levels Caused By Main Boiler Feedwater Pump Turbine Low Pressure Governor Valves Failed Closed LER 17-001-00 for Indian Point, Unit 2 Regarding Manual Reactor Trip Due to Decreasing Steam Generator Levels Caused By Main Boiler Feedwater Pump Turbine Low Pressure Governor Valves Failed Closed | Power change Loctite |
05000247/LER-2017-002 | 22 August 2017 | Auxiliary Feedwater Flow Indication Inoperable for Longer Than the Allowed Technical Specification Completion Time Due to Failure of Complete Restoration Following Calibration LER 17-002-00 for Indian Point, Unit 2 Regarding Auxiliary Feedwater Flow Indication Inoperable for Longer Than the Allowed Technical Specification Completion Time Due to Failure of Complete Restoration Following Calibration | |
05000286/LER-2017-002 | 9 August 2017 | Manual Isolation of Chemical and Volume Control System Normal Letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition A Limit for Pressurizer Level LER 17-002-00 for Indian Point, Unit 3 re Manual Isolation of Chemical and Volume Control System Normal letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition A Limit for Pressurizer Level | Safe Shutdown |
05000286/LER-2017-001 | 13 July 2017 | Single Flow Barrier Access Point Found Unbolted LER 17-001-00 for Indian Point, Unit 3 Regarding Single Flow Barrier Access Point Found Unbolted | Locked High Radiation Area Scaffolding |
05000247/LER-2016-010 | 28 February 2017 | Safety System Functional Failure Due to an Inoperable Containment Caused by a Through Wall Defect in a Service Water Supply Pipe Elbow to the 24, Fan Cooler Unit LER 16-010-01 for Indian Point 2 Regarding Safety System Functional Failure Due to an Inoperable Containment Caused by a Through Wall Defect in a Service Water Supply Pipe Elbow to the 24 Fan Cooler Unit | Coatings Through-Wall Leak Through Wall Leak |
05000247/LER-2016-002 | 28 February 2017 | Automatic Actuation of Emergency Diesel Generators (EDGs) Due to 480 VAC Bus Undervoltage Condition and Loss of Residual Heat Removal (RHR) While in Cold Shutdown LER 16-002-01 for Indian Point, Unit 2 Regarding Automatic Actuation of Emergency Diesel Generators (EDGs) Due to 480 VAC Bus Undervoltage Condition and Loss of Residual Heat Removal (RHR) While in Cold Shutdown | Boric Acid Past operability |
NL-16-108, LER 15-001-01 for Indian Point 2 Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Conta | 29 September 2016 | LER 15-001-01 for Indian Point 2 Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Contai | Time of Discovery Through Wall Leak Through-Wall Leakage |
05000286/LER-2015-005 | 14 September 2016 | Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by the Trip of 345kV Main Generator Output Breaker 3 due to a Failure of South Ring Bus 345kV Breaker 5 LER 15-005-01 for Indian Point 3 RE: Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by the Trip of 345kV Main Generator output Breaker 3 due to a Failure of South Ring Bus 345kV Breaker 5 | |
05000286/LER-2015-004 | 14 September 2016 | Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by a Failure of the 31 Main Transformer LER 15-004-01 for Indian Point Unit No. 3 Regarding Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by a Failure of the 31 Main Transformer | Main transformer failure |
05000286/LER-2015-007 | 6 September 2016 | Manual Reactor Trip Due to Decreasing Steam Generator Water Levels Caused by a Miss- Wired Circuit Board in the Main Feedwater Pump Speed Control System LER 2015-007-01 for Indian Point, Unit 3 Regarding Manual Reactor Trip Due to Decreasing Steam Generator Water Level Caused by a Miss-Wired Circuit Board in the Main Feedwater Pump Speed Control System | |
05000286/LER-2015-006 | 8 August 2016 | Technical SpecificatiOn Prohibited Condition Due to Two Pressurizer Code Safety Valves Discovered Outside their As-Found Lift Setpoint Test Acceptance Criteria LER 15-006-01 for Indian Point Unit No. 3 Regarding Technical Specification Prohibited Condition Due to Two Pressurizer Code Safety Valves Discovered Outside Their As-Found Lift Setpoint Test Acceptance Criteria | |
05000286/LER-2014-004 | 1 August 2016 | Automatic Reactor Trip as a Result of Meeting the Trip Logic for Over Temperature Delta Temperature during Reactor Protection System Pressurizer Pressure Calibration LER 14-004-01 for Indian Point Unit 3, Regarding Automatic Reactor Trip as a Result of Meeting the Trip Logic for Over Temperature Delta Temperature During Reactor Protection System Pressurizer Pressure Calibration | |
05000247/LER-2016-004 | 31 May 2016 | Unanalyzed Condition due to Degraded Reactor Baffle-Former Bolts LER 16-004-00 for Indian Point 2 re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts | Safe Shutdown Unanalyzed Condition Time of Discovery |
05000247/LER-2016-005 | 25 May 2016 | Technical Specification (TS) Prohibited Condition Due to a Surveillance Requirement Never Performed for Testing the Trip of the Main Boiler Feedwater Pumps LER 16-005-00 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to a Surveillance Requirement Never Performed for Testing the Trip of the Main Boiler Feedwater Pumps | Missed surveillance |
05000247/LER-2016-001 | 2 May 2016 | Technical Specification Prohibited Condition Caused by One Main Steam Safety Valve Outside Its As-Found Lift Set Point Test Acceptance Criteria LER 16-001-00 for Indian Point 2 RE: Technical Specification Prohibited Condition Caused by One Main Steam Safety Valve Outside Its As-Found Lift Set Point Test Acceptance Criteria | Anticipated operational occurrence |
05000247/LER-2015-004 | 18 February 2016 | Safety System Functional Failure Due to an Inoperable Containment Caused by a Flawed Elbow on the 21 Fan Cooler Unit Service Water Motor Cooling Return Pipe LER 15-004-00 for Indian Point 2 Regarding Safety System Functional Failure Due to an Inoperable Containment Caused by a Flawed Elbow on the 21 Fan Cooler Unit Service Water Motor Cooling Return Pipe | Time of Discovery Through Wall Leak |
05000286/LER-2015-008 | 11 February 2016 | Automatic Reactor Trip Due to a Turbine-Generator Trip as a Result of a Fault on 345 kV Feeder W96 Tower Lines Caused by Pre-Existing Degraded Insulator LER 15-008-00 for Indian Point, Unit 3, Regarding Automatic Reactor Trip Due to a Turbine-Generator Trip as a Result of a Fault on 345 kV Feeder W96 Tower Lines Caused by Bird Streaming | |
05000247/LER-2015-003 | 3 February 2016 | Manual Reactor Trip Due to Indications of Multiple Dropped Control Rods Caused by Loss of Control Rod Power Due to a Power Supply Failure LER 15-003-00 for Indian Point, Unit 2, Regarding Manual Reactor Trip Due to Indications of Multiple Dropped Control Rods Caused by Loss of Control Rod Power Due to a Power Supply Failure | Boric Acid |
NL-15-124, LER 15-001-00 for Indian Point 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Cont | 9 October 2015 | LER 15-001-00 for Indian Point 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Conta | Time of Discovery Nondestructive Examination Through-Wall Leak Through Wall Leak |
NL-13-166, Report on Inoperable Gross Failed Fuel Detector | 20 December 2013 | Report on Inoperable Gross Failed Fuel Detector | |
NL-13-038, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Byproduct Material | 19 February 2013 | Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Byproduct Material | |
NL-12-060, Submittal of Report on Inoperable Gross Failed Fuel Detector | 26 April 2012 | Submittal of Report on Inoperable Gross Failed Fuel Detector | Boric Acid Temporary Modification |
ML110190640 | 9 November 2010 | Event Notification Report; Subject: Power Reactor Indian Point Unit 2 | |
NL-09-108, Submittal of Report on Inoperable Core Exit Thermocouples | 10 August 2009 | Submittal of Report on Inoperable Core Exit Thermocouples | Post Accident Monitoring |
ML050960041 | 17 December 2004 | Final Precursor Analysis - IP-2 Grid Loop | Fitness for Duty Mission time |
ML050960051 | 17 December 2004 | Final Precursor Analysis - IP-3 Grid Loop | Safe Shutdown Fitness for Duty Mission time |
NL-03-136, LER 03-03-00 for Indian Point Unit 3 Regarding Automatic Turbine Trip/Reactor Trip Due to Fault in 345kV Generator Output Breaker 3 | 21 August 2003 | LER 03-03-00 for Indian Point Unit 3 Regarding Automatic Turbine Trip/Reactor Trip Due to Fault in 345kV Generator Output Breaker 3 | |
ML020910435 | 19 March 2002 | LER 98-001-01 for Indian Point Unit 3 Re Potential Failure or Inadvertent Operation of Fire Protection Systems, Caused by Personnel Error in Design | Earthquake Fire Watch |
ML17252A895 | 25 May 1979 | Letter Reporting a 05/18/1973 Occurrence of a Pressure Transient within the Reactor Coolant System Due to the Closure of Certain Air Operated Valves in the Reactor Coolant Letdown System - Indian Point Unit 2 | Hydrostatic |
ML17252A846 | 19 February 1974 | Letter Regarding Performance of a Surveillance Test PT-M2 Reactor Coolant Temperature Analog Channel Functional Test - Delta T Overtemperature and T Overpower - Indian Point Unit No. 2 | |
ML17252A848 | 19 February 1974 | Letter Regarding a February 1, 1974 Occurrence Where Both Door of the 80 Foot Elevation Personnel Air Lock to the Containment Building Were Inadvertently Open at the Same Time for a Period of About Thirty Seconds - Indian Point Unit. 2 | Boric Acid |
ML17252A847 | 8 February 1974 | Letter Regarding an Occurrence on 1/25/1974 at the Indian Point Unit No. 2 Reactor Was Brought Critical in Preparation for Placing the Plant Back in Service Following Completion of Repairs Associated with No. 22 Steam Generator Feedwater Li | Shutdown Margin |
ML17252A849 | 6 February 1974 | Letter Regarding an Occurrence Where Both Doors of the 80 Foot Elevation Personnel Air Lock to the Containment Building Were Inadvertently Opened at the Same Time for About Thirty Seconds - Indian Point Unit 2 | |
ML17252A850 | 5 February 1974 | Letter Regarding an Occurrence Where a Slight Reactor Coolant System Pressure Transient Was Experienced in the Course of Placing a Reactor Coolant Pump in Service - Indian Point Unit No. 2 | |
ML17252A851 | 1 February 1974 | Letter Regarding an Inspection of All Bergen-Paterson Hydraulic Shock and Sway Arrestors (Snubbers) Located in the Vapor Containment Was Performed and Two Did Not Meet the Established Criterion for Operability - Indian Point Unit No. 2 | |
ML17252A852 | 31 January 1974 | Letter Regarding an Occurrence Where the Reactor Was Brought Critical Preparatory to Placing the Plant Back in Service Following Completion of Repairs Associated with the 11/13/1973 Feedwater Line Break Incident - Indian Point Unit No. 2 | |
ML17252A859 | 28 January 1974 | Letter Regarding an Occurrence 01/23/1974 Where a Slight Reactor Coolant System Pressure Transient Above the Technical Specifications Limit Was Experienced in the Course of Placing a Reactor Coolant Pump in Service - Indian Point Unit No. 2 | |
ML17252A872 | 18 January 1974 | Letter Regarding Analysis of Results of Monthly Periodic Surveillance Test PT-M11 (Steam Line Pressure Analog Channel Function Test) Indicated That One of the Low Steam Line Pressure Bistables Associated with High Steam - Indian Point Unit | |
ML17252A876 | 28 December 1973 | Letter Regarding 12/17/1973 Analysis of the Results of Periodic Tests and Calibration Checks Relating to Pressurizer Level Indicated a Setpoint Drift - Indian Point Unit 2 | |
ML17252A877 | 18 December 1973 | Letter Regarding a 12/17/1973 Analysis of Results of Periodic Tests and Calibration Checks Relating to Pressurizer Level Indicated a Setting for One of the Bistables Was Above the Technical Spec. Limit - Indian Point Unit 2 | |
ML17252A879 | 3 December 1973 | Letter Regarding a 11/18/1973 Occurrence Relating to the Discovery of the Erroneous Setting for 1 of the Bistables Associated with Low Pressurizer Safety Injection Required by the Technical Specifications - Indian Point Unit No. 2 | |
ML17252A878 | 30 November 1973 | Letter Providing Supplemental Information Concerning the 11/13/1973 Incident at Indian Point Unit No. 2 | Safe Shutdown Hydrostatic |
ML17252A882 | 19 November 1973 | Letter Concerning a 11/16/1973 Occurrence Regarding Periodic Tests and Calibration Checks Indicating the Setting for 1 of the Bistable Device Was Below the Technical Specification Requirements - Indian Point Unit 2 |