NL-09-108, Submittal of Report on Inoperable Core Exit Thermocouples
ML092330110 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 08/10/2009 |
From: | Robert Walpole Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NL-09-108 | |
Download: ML092330110 (2) | |
Similar Documents at Indian Point | |
---|---|
Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021
[Table view]Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-028, 2020 Annual Environmental Protection Plan Report2021-04-22022 April 2021 2020 Annual Environmental Protection Plan Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-036, 2019 Annual Environmental Protection Plan Report2020-04-28028 April 2020 2019 Annual Environmental Protection Plan Report NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use 2021-05-06 Category:Licensee Event Report (LER) MONTHYEAR05000247/LER-2018-003-01, Loss of Safety Function Due to Valve SWN-6 Actuator Failure During Service Water Header Swap2020-02-0707 February 2020
[Table view]Loss of Safety Function Due to Valve SWN-6 Actuator Failure During Service Water Header Swap NL-18-039, LER 2018-001-00 for Indian Point, Unit 2 Re Penetration Indications Discovered During Reactor Pressure Vessel Head Inspection2018-05-21021 May 2018 LER 2018-001-00 for Indian Point, Unit 2 Re Penetration Indications Discovered During Reactor Pressure Vessel Head Inspection 05000286/LER-2017-0042017-12-20020 December 2017 Reactor Trip Due to Main Generator Loss of Field, LER 17-004-00 for Indian Point Unit 3, Regarding Reactor Trip Due to Main Generator Loss of Field ML17252A8662017-09-0909 September 2017 Letter Regarding a 04/26/1977 Occurrence Concerning Failure of Number 22 Main Steam Line Isolation Valve to Close to a Manual Signal Initiated by the Control Room Operator - Indian Point Unit No. 2 NL-17-107, LER 15-001-02 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate fo2017-08-29029 August 2017 LER 15-001-02 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for 05000247/LER-2015-0012017-08-29029 August 2017 Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size that Results in Exceeding the Allowed Leakage Rate for Containment, LER 15-001-02 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size that Results in Exceeding the Allowed Leakage Rate for Containment 05000286/LER-2017-0032017-08-29029 August 2017 Condensate Storage Tank Declared Inoperable Per Technical Specification, LER 17-003-00 for Indian Point, Unit 3, Regarding Condensate Storage Tank Declared Inoperable Per Technical Specification 05000247/LER-2017-0032017-08-23023 August 2017 Technical Specification Violation of Section 3.3.1 RPS Instrumentation, LER 17-003-00 for Indian Point Unit 2, Regarding Technical Specification Violation of Section 3.3.1 RPS Instrumentation 05000247/LER-2017-0022017-08-22022 August 2017 Auxiliary Feedwater Flow Indication Inoperable for Longer Than the Allowed Technical Specification Completion Time Due to Failure of Complete Restoration Following Calibration, LER 17-002-00 for Indian Point, Unit 2 Regarding Auxiliary Feedwater Flow Indication Inoperable for Longer Than the Allowed Technical Specification Completion Time Due to Failure of Complete Restoration Following Calibration 05000247/LER-2017-0012017-08-22022 August 2017 Manual Reactor Trip Due to Decreasing Steam Generator Levels Caused By Main Boiler Feedwater Pump Turbine Low Pressure Governor Valves Failed Closed, LER 17-001-00 for Indian Point, Unit 2 Regarding Manual Reactor Trip Due to Decreasing Steam Generator Levels Caused By Main Boiler Feedwater Pump Turbine Low Pressure Governor Valves Failed Closed 05000286/LER-2017-0022017-08-0909 August 2017 Manual Isolation of Chemical and Volume Control System Normal Letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition A Limit for Pressurizer Level, LER 17-002-00 for Indian Point, Unit 3 re Manual Isolation of Chemical and Volume Control System Normal letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition A Limit for Pressurizer Level 05000286/LER-2017-0012017-07-13013 July 2017 Single Flow Barrier Access Point Found Unbolted, LER 17-001-00 for Indian Point, Unit 3 Regarding Single Flow Barrier Access Point Found Unbolted 05000247/LER-2016-0022017-02-28028 February 2017 Automatic Actuation of Emergency Diesel Generators (EDGs) Due to 480 VAC Bus Undervoltage Condition and Loss of Residual Heat Removal (RHR) While in Cold Shutdown, LER 16-002-01 for Indian Point, Unit 2 Regarding Automatic Actuation of Emergency Diesel Generators (EDGs) Due to 480 VAC Bus Undervoltage Condition and Loss of Residual Heat Removal (RHR) While in Cold Shutdown 05000247/LER-2016-0102017-02-28028 February 2017 Safety System Functional Failure Due to an Inoperable Containment Caused by a Through Wall Defect in a Service Water Supply Pipe Elbow to the 24, Fan Cooler Unit, LER 16-010-01 for Indian Point 2 Regarding Safety System Functional Failure Due to an Inoperable Containment Caused by a Through Wall Defect in a Service Water Supply Pipe Elbow to the 24 Fan Cooler Unit NL-16-108, LER 15-001-01 for Indian Point 2 Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Conta2016-09-29029 September 2016 LER 15-001-01 for Indian Point 2 Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Contai 05000286/LER-2015-0052016-09-14014 September 2016 Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by the Trip of 345kV Main Generator Output Breaker 3 due to a Failure of South Ring Bus 345kV Breaker 5, LER 15-005-01 for Indian Point 3 RE: Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by the Trip of 345kV Main Generator output Breaker 3 due to a Failure of South Ring Bus 345kV Breaker 5 05000286/LER-2015-0042016-09-14014 September 2016 Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by a Failure of the 31 Main Transformer, LER 15-004-01 for Indian Point Unit No. 3 Regarding Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by a Failure of the 31 Main Transformer 05000286/LER-2015-0072016-09-0606 September 2016 Manual Reactor Trip Due to Decreasing Steam Generator Water Levels Caused by a Miss- Wired Circuit Board in the Main Feedwater Pump Speed Control System, LER 2015-007-01 for Indian Point, Unit 3 Regarding Manual Reactor Trip Due to Decreasing Steam Generator Water Level Caused by a Miss-Wired Circuit Board in the Main Feedwater Pump Speed Control System 05000286/LER-2015-0062016-08-0808 August 2016 Technical SpecificatiOn Prohibited Condition Due to Two Pressurizer Code Safety Valves Discovered Outside their As-Found Lift Setpoint Test Acceptance Criteria, LER 15-006-01 for Indian Point Unit No. 3 Regarding Technical Specification Prohibited Condition Due to Two Pressurizer Code Safety Valves Discovered Outside Their As-Found Lift Setpoint Test Acceptance Criteria 05000286/LER-2014-0042016-08-0101 August 2016 Automatic Reactor Trip as a Result of Meeting the Trip Logic for Over Temperature Delta Temperature during Reactor Protection System Pressurizer Pressure Calibration, LER 14-004-01 for Indian Point Unit 3, Regarding Automatic Reactor Trip as a Result of Meeting the Trip Logic for Over Temperature Delta Temperature During Reactor Protection System Pressurizer Pressure Calibration 05000247/LER-2016-0042016-05-31031 May 2016 Unanalyzed Condition due to Degraded Reactor Baffle-Former Bolts, LER 16-004-00 for Indian Point 2 re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts 05000247/LER-2016-0052016-05-25025 May 2016 Technical Specification (TS) Prohibited Condition Due to a Surveillance Requirement Never Performed for Testing the Trip of the Main Boiler Feedwater Pumps, LER 16-005-00 for Indian Point, Unit 2, Regarding Technical Specification (TS) Prohibited Condition Due to a Surveillance Requirement Never Performed for Testing the Trip of the Main Boiler Feedwater Pumps 05000247/LER-2016-0012016-05-0202 May 2016 Technical Specification Prohibited Condition Caused by One Main Steam Safety Valve Outside Its As-Found Lift Set Point Test Acceptance Criteria, LER 16-001-00 for Indian Point 2 RE: Technical Specification Prohibited Condition Caused by One Main Steam Safety Valve Outside Its As-Found Lift Set Point Test Acceptance Criteria 05000247/LER-2015-0042016-02-18018 February 2016 Safety System Functional Failure Due to an Inoperable Containment Caused by a Flawed Elbow on the 21 Fan Cooler Unit Service Water Motor Cooling Return Pipe, LER 15-004-00 for Indian Point 2 Regarding Safety System Functional Failure Due to an Inoperable Containment Caused by a Flawed Elbow on the 21 Fan Cooler Unit Service Water Motor Cooling Return Pipe 05000286/LER-2015-0082016-02-11011 February 2016 Automatic Reactor Trip Due to a Turbine-Generator Trip as a Result of a Fault on 345 kV Feeder W96 Tower Lines Caused by Pre-Existing Degraded Insulator, LER 15-008-00 for Indian Point, Unit 3, Regarding Automatic Reactor Trip Due to a Turbine-Generator Trip as a Result of a Fault on 345 kV Feeder W96 Tower Lines Caused by Bird Streaming 05000247/LER-2015-0032016-02-0303 February 2016 Manual Reactor Trip Due to Indications of Multiple Dropped Control Rods Caused by Loss of Control Rod Power Due to a Power Supply Failure, LER 15-003-00 for Indian Point, Unit 2, Regarding Manual Reactor Trip Due to Indications of Multiple Dropped Control Rods Caused by Loss of Control Rod Power Due to a Power Supply Failure NL-15-124, LER 15-001-00 for Indian Point 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Cont2015-10-0909 October 2015 LER 15-001-00 for Indian Point 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Conta NL-13-166, Report on Inoperable Gross Failed Fuel Detector2013-12-20020 December 2013 Report on Inoperable Gross Failed Fuel Detector NL-13-038, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Byproduct Material2013-02-19019 February 2013 Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Byproduct Material NL-12-060, Submittal of Report on Inoperable Gross Failed Fuel Detector2012-04-26026 April 2012 Submittal of Report on Inoperable Gross Failed Fuel Detector ML1101906402010-11-0909 November 2010 Event Notification Report; Subject: Power Reactor Indian Point Unit 2 NL-09-108, Submittal of Report on Inoperable Core Exit Thermocouples2009-08-10010 August 2009 Submittal of Report on Inoperable Core Exit Thermocouples ML0509600412004-12-17017 December 2004 Final Precursor Analysis - IP-2 Grid Loop ML0509600512004-12-17017 December 2004 Final Precursor Analysis - IP-3 Grid Loop NL-03-136, LER 03-03-00 for Indian Point Unit 3 Regarding Automatic Turbine Trip/Reactor Trip Due to Fault in 345kV Generator Output Breaker 32003-08-21021 August 2003 LER 03-03-00 for Indian Point Unit 3 Regarding Automatic Turbine Trip/Reactor Trip Due to Fault in 345kV Generator Output Breaker 3 ML0209104352002-03-19019 March 2002 LER 98-001-01 for Indian Point Unit 3 Re Potential Failure or Inadvertent Operation of Fire Protection Systems, Caused by Personnel Error in Design ML17252A8951979-05-25025 May 1979 Letter Reporting a 05/18/1973 Occurrence of a Pressure Transient within the Reactor Coolant System Due to the Closure of Certain Air Operated Valves in the Reactor Coolant Letdown System - Indian Point Unit 2 ML17252A8461974-02-19019 February 1974 Letter Regarding Performance of a Surveillance Test PT-M2 Reactor Coolant Temperature Analog Channel Functional Test - Delta T Overtemperature and T Overpower - Indian Point Unit No. 2 ML17252A8481974-02-19019 February 1974 Letter Regarding a February 1, 1974 Occurrence Where Both Door of the 80 Foot Elevation Personnel Air Lock to the Containment Building Were Inadvertently Open at the Same Time for a Period of About Thirty Seconds - Indian Point Unit. 2 ML17252A8471974-02-0808 February 1974 Letter Regarding an Occurrence on 1/25/1974 at the Indian Point Unit No. 2 Reactor Was Brought Critical in Preparation for Placing the Plant Back in Service Following Completion of Repairs Associated with No. 22 Steam Generator Feedwater Li ML17252A8491974-02-0606 February 1974 Letter Regarding an Occurrence Where Both Doors of the 80 Foot Elevation Personnel Air Lock to the Containment Building Were Inadvertently Opened at the Same Time for About Thirty Seconds - Indian Point Unit 2 ML17252A8501974-02-0505 February 1974 Letter Regarding an Occurrence Where a Slight Reactor Coolant System Pressure Transient Was Experienced in the Course of Placing a Reactor Coolant Pump in Service - Indian Point Unit No. 2 ML17252A8511974-02-0101 February 1974 Letter Regarding an Inspection of All Bergen-Paterson Hydraulic Shock and Sway Arrestors (Snubbers) Located in the Vapor Containment Was Performed and Two Did Not Meet the Established Criterion for Operability - Indian Point Unit No. 2 ML17252A8521974-01-31031 January 1974 Letter Regarding an Occurrence Where the Reactor Was Brought Critical Preparatory to Placing the Plant Back in Service Following Completion of Repairs Associated with the 11/13/1973 Feedwater Line Break Incident - Indian Point Unit No. 2 ML17252A8591974-01-28028 January 1974 Letter Regarding an Occurrence 01/23/1974 Where a Slight Reactor Coolant System Pressure Transient Above the Technical Specifications Limit Was Experienced in the Course of Placing a Reactor Coolant Pump in Service - Indian Point Unit No. 2 ML17252A8721974-01-18018 January 1974 Letter Regarding Analysis of Results of Monthly Periodic Surveillance Test PT-M11 (Steam Line Pressure Analog Channel Function Test) Indicated That One of the Low Steam Line Pressure Bistables Associated with High Steam - Indian Point Unit ML17252A8761973-12-28028 December 1973 Letter Regarding 12/17/1973 Analysis of the Results of Periodic Tests and Calibration Checks Relating to Pressurizer Level Indicated a Setpoint Drift - Indian Point Unit 2 ML17252A8771973-12-18018 December 1973 Letter Regarding a 12/17/1973 Analysis of Results of Periodic Tests and Calibration Checks Relating to Pressurizer Level Indicated a Setting for One of the Bistables Was Above the Technical Spec. Limit - Indian Point Unit 2 ML17252A8791973-12-0303 December 1973 Letter Regarding a 11/18/1973 Occurrence Relating to the Discovery of the Erroneous Setting for 1 of the Bistables Associated with Low Pressurizer Safety Injection Required by the Technical Specifications - Indian Point Unit No. 2 ML17252A8781973-11-30030 November 1973 Letter Providing Supplemental Information Concerning the 11/13/1973 Incident at Indian Point Unit No. 2 2020-02-07 |
Text
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 r ,,Buchanan,
,tr.-* N.Y. 10511-0249 Tel (914) 734-6700 Robert Walpole Licensing Manager 914-734-6710 August 10, 2009 NL-09-108 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Report on Inoperable Core Exit Thermocouples Indian Point Unit Number 3 Docket No. 50-286 License No. DPR-64
Dear Sir or Madam:
The purpose of this letter is to submit a report pursuant to Technical Specification (TS) 5.6.7.
Two channels of Core Exit Thermocouples (CET), each channel consisting of two CETs in the same train, are required by TS 3.3.3, Table 3.3.3-1, for each reactor quadrant. Each reactor quadrant is considered a separate function. CET K-13 is in reactor quadrant IV, Train A, and is required to satisfy the function of Post Accident Monitoring. CET R-10 is in reactor quadrant IV, Train A, and is also required to satisfy the function of Post Accident Monitoring. These CETs were declared inoperable on July 1 and July 3, 2009, respectively, and TS 3.3.3, Condition B was entered. The 30 day allowed outage time expired on July 31 and August 2,.
2009. TS 3.3.3, Condition B requires a report in 14 days pursuant to TS 5.6.7. The report is to outline the alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrument to operable status.
- Alternate method of monitoring Quadrant IV Train A has one operable qualified CET and Train B has two operable qualified operable CETs. With the single channel failure of Train B in quadrant IV there are additionally 5 non qualified operable CETs, that for non accident conditions, can help to provide indications for unit stabilization, cool down and channel check capability for the one operable qualified Train A CET P13.
- Cause These failures were entered into the IPEC Corrective Action Program in CR-IP3-2009-02964. Troubleshooting and evaluation of the failure has identified that an electrical fault is present somewhere in the Containment Building in the cabling between a connection panel
NL-09-108 Docket 50-286 Page 2 of 2 and the connection at the Reactor Vessel Head. However, the precise nature of the fault is not determinate at this time. The boundary described above is not accessible during power operation and as such further investigation as well as repair is not practical at this time.
0 Plans and schedule for restoring Repair plans have been entered into the IPEC Corrective Action Program in CR-IP3-2009-03041, CA-001. Work Orders 200238 and 200239 have been issued and coded as a Forced Outage activity to be implemented in the first Forced Outage of sufficient duration.
If an opportunity does not present itself, repairs will be implemented no later than the next Refueling Outage in the spring of 2011.
There are no new commitments being made in this submittal.