Issue date | Title | Topic | |
---|---|---|---|
ML18039A902 | 15 October 1999 | Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event | |
ML18039A896 | 14 October 1999 | Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event | |
ML18039A888 | 8 October 1999 | Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML18039A893 | 8 October 1999 | Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr | |
ML20217B548 | 1 October 1999 | Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR | |
ML20212F775 | 22 September 1999 | Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses | |
ML18039A872 | 10 September 1999 | Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks | |
ML20211Q573 | 9 September 1999 | Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl | Generic Fundamentals Examination |
ML20210Q693 | 9 August 1999 | Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants | |
ML18039A837 | 6 August 1999 | Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept | Grab sample Hydrostatic |
ML18039A818 | 26 July 1999 | Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) | |
ML20210F303 | 22 July 1999 | Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 | |
ML18039A808 | 28 June 1999 | Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF | |
ML18039A811 | 25 June 1999 | Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 | |
ML20196F813 | 22 June 1999 | Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld | |
ML18039A805 | 22 June 1999 | Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept | |
ML18039A803 | 18 June 1999 | Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days | |
ML18039A793 | 1 June 1999 | Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage | |
ML20195D332 | 1 June 1999 | Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 | |
ML20195B936 | 24 May 1999 | Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License | |
ML18039A791 | 24 May 1999 | Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training | |
ML18039A789 | 24 May 1999 | Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 | |
ML20206U655 | 14 May 1999 | Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 | |
ML20206Q842 | 10 May 1999 | Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) | |
ML18039A777 | 6 May 1999 | Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments | |
ML20206H590 | 30 April 1999 | Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 | Met Tower |
ML18039A774 | 30 April 1999 | Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval | |
ML18039A768 | 27 April 1999 | Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval | Nondestructive Examination |
ML18039A759 | 27 April 1999 | Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML18039A765 | 27 April 1999 | Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr. | |
ML20206C859 | 23 April 1999 | Informs That Util Has Determined,Dr Bateman No Longer Needs to Maintain His License,Effective 990331,per Requirement of 10CFR55.55(a) | |
ML18039A754 | 23 April 1999 | Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping | |
ML18039A758 | 23 April 1999 | Responds to Item 4 of 981117 RAI Re TS Change Request 376 Re Extended EDG Allowed Outage Time,In Manner Consistent with Rgs 1.174 & 1.177 | High winds Probabilistic Risk Assessment Large early release frequency |
ML20206C124 | 21 April 1999 | Forwards Annual Occupational Radiation Exposure Rept for 1998, IAW TS Section 5.6.1.Rept Reflects Radiation Exposure Data as Tracked by Electronic Dosimeters on Radiation Work Permits | Deep Dose Equivalent |
ML20205T097 | 15 April 1999 | Submits Change in Medical Status for DM Olive in Accordance with 10CFR55.25,effective 990315.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld,Per 10CFR2.790(a)(6) | |
ML18039A744 | 7 April 1999 | Forwards LER 99-001-00,providing Details Re Inoperability of Two Trains of Standby Gas Treatment Due to Breaker Trip on One Train in Conjunction with Planned Maint Activities on Other.Ltr Contains No New Commitments | |
ML18039A743 | 30 March 1999 | Responds to NRC 990112 RAI Re BFN Program,Per GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs. | Stroke time |
ML18039A742 | 30 March 1999 | Provides Results of Analysis of Design Basis Loca,As Required by License Condition Re Plants Power Uprate Operating License Amends 254 & 214 | Seismically rugged |
ML18039A741 | 30 March 1999 | Provides Partial Response to NRC 981117 RAI Re TS Change Request 376,proposing to Extend Current 7 Day AOT for EDG to 14 Days | Probabilistic Risk Assessment |
ML18039A737 | 26 March 1999 | Requests Relief from Specified ISI Requirements in Section XI of ASME Boiler & Pressure Vessel Code,1989 Edition.Encl Contains Request for Relief 3-ISI-7,for NRC Review & Approval | Nondestructive Examination |
ML18039A733 | 26 March 1999 | Forwards Rev 4 to TVA-COLR-BF2C10, Bnfp,Unit 2,Cycle 10 COLR, IAW Requirements of TS 5.6.5.d.COLR Was Revised to Extend Max Allowable Nodal Exposure for GE GE7B Fuel Bundles | |
ML18039A729 | 22 March 1999 | Forwards Revised Epips,Including Index,Rev 26A to EPIP-1, Emergency Classification Procedure & Rev 26A to EPIP-5, General Emergency. Rev 26A Includes All Changes Made in Rev 26 as Well as Identified Errors | |
ML20204G847 | 19 March 1999 | Reports Change in Medical Status for Ma Morrow,In Accordance with 10CFR55.25.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld from Pdr,Per 10CFR2.790(a)(6).Without Encl | |
ML20207M061 | 11 March 1999 | Forwards Goals & Objectives for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3,radiological Emergency Plan Exercise.Plant Exercise Is Currently Scheduled for Wk of 990524 | |
ML18039A697 | 22 February 1999 | Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation | |
ML18039A696 | 19 February 1999 | Provides Util Response to GL 95-07 Re RCIC Sys Injection Valves (2/3-FCV-71-39) for BFN Units 2 & 3.Previous Responses,Dtd 951215,1016 & 960730,0315 & 0213,supplemented | |
ML18039A691 | 19 February 1999 | Forwards Rev 3 to Unit 2 Cycle 10 & Rev 1 to Unit 3 Cycle 9, Colr.Colrs for Each Unit Were Revised to Include OLs Consistent with Single Recirculation Loop Operation | |
ML20203B603 | 4 February 1999 | Requests Temporary Partial Exemption from Requirements of 10CFR50.65,maint Rule for Unit 1.Util Requesting Exemption to Resolve Issue Initially Raised in NRC Insp Repts 50-259/97-04,50-260/97-04 & 50-296/97-04,dtd 970521 | Exemption Request Maintenance Rule Program |
ML18039A674 | 21 January 1999 | Responds to NRC 981209 Ltr Re Violations Noted in Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07,respectively. Corrective Actions:Will Revise Procedure NEPD-8 Re Vendor Nonconformance Documentation Submission to TVA | |
ML20199F695 | 8 January 1999 | Submits Request for Relief from ASME Section XI Inservice Testing Valve Program to Extend Interval Between Disassembly of Check Valve,Within Group of Four Similar Check Valves for EECW Dgs,From 18 to 24 Months |