Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleTopic
ENS 56912Saint Lucie3 January 2024 17:57:00Pressure Boundary Degraded / Both Trains of High Pressure Safety Injection InoperableThrough Wall Leak
ENS 56893Saint Lucie16 December 2023 01:45:00Reactor Coolant System LeakThrough Wall Leak
ENS 56813Turkey Point25 October 2023 01:59:00Automatic Reactor Trip
ENS 56755Turkey Point22 September 2023 22:19:00Automatic Reactor Trip
ENS 56658Turkey Point4 August 2023 17:20:00Manual Reactor Trip
ENS 56474Turkey Point15 April 2023 15:12:00RCS Pressure Boundary DegradedTime of Discovery
Through Wall Leak
ENS 56264Turkey Point8 December 2022 19:02:00Unusual Event Due to Excessive Reactor Coolant System Leakage
ENS 56135Saint Lucie30 September 2022 20:08:00Safety System Inoperability
ENS 56128Saint Lucie26 September 2022 21:41:00Safety System Inoperability
ENS 56087Saint Lucie3 September 2022 02:48:00Manual Reactor Trip Due to Loss of Feed Pump
ENS 55831Turkey Point7 April 2022 23:00:00Both Trains of Residual Heat Removal Inoperable
ENS 55785Turkey Point12 March 2022 05:50:00Main Steam Isolation Valve Failed to Shut
ENS 55768Turkey Point5 March 2022 15:30:00Failed Fitness for Duty TestFitness for Duty
ENS 55757Turkey Point24 February 2022 21:50:00Fitness for DutyFitness for Duty
ENS 55693Saint Lucie7 January 2022 00:37:00Shutdown Initiated in Accordance with Technical Specifications
ENS 55641Saint Lucie10 December 2021 15:24:00Manual Reactor Trip
ENS 55574Turkey Point12 November 2021 21:05:00Reactor Coolant System Pressure Boundary DegradedThrough-Wall Leak
Through Wall Leak
ENS 55513Turkey Point9 October 2021 07:00:00Auxiliary Feedwater System AUTO-STARTED on Feedwater Isolation Signal
ENS 55153Turkey Point25 March 2021 01:29:00Notice of Unusual Event Declared Due to Fire Alarm in Containment
ENS 55117Turkey Point1 March 2021 16:12:00Automatic Reactor Trip Due to Reactor Protection System Actuation
ENS 55109Turkey Point20 February 2021 23:30:00Offsite Notification Due to Three Individuals in Distress Offshore of the Facility
ENS 55078Saint Lucie20 January 2021 23:22:00Automatic Reactor Trip Due to Trip of Motor Control Center
ENS 55036Turkey Point14 December 2020 17:40:00Charging Pump and Boration Flowpaths Simultaneously InoperablePast operability
ENS 54847Turkey Point21 August 2020 03:54:00Manual Reactor Trip Due to Steam Generator Water Level Control
ENS 54844Turkey Point19 August 2020 17:25:00Automatic Reactor Trip During Startup
ENS 54839Turkey Point18 August 2020 01:13:00Manual Reactor Trip Due to Rising Steam Generator Level
ENS 54808Saint Lucie31 July 2020 21:00:00Notice of Unusual Event Due to Hurricane Warning Posted for Area
ENS 54762Turkey Point6 July 2020 01:09:00Reactor Trip Due to Turbine Trip
ENS 54423Turkey Point5 December 2019 17:20:00Offsite Notification Due to Deceased Manatee in Owner Controlled Area
ENS 54362Saint Lucie30 October 2019 04:26:00Unusual Event Due to Release of Flammable Gas
ENS 54262Saint Lucie7 September 2019 12:24:00Automatic Reactor Trip
ENS 54253Saint Lucie1 September 2019 21:17:00En Revision Imported Date 9/4/2019
ENS 54072Turkey Point18 May 2019 15:08:00Manual Reactor Trip Due Grid Disturbance
ENS 54046Turkey Point3 May 2019 12:52:00Fitness-For-Duty Report
ENS 54027Saint Lucie25 April 2019 13:18:00Automatic Reactor Trip Due to Turbine Generator Trip
ENS 53703Saint Lucie29 October 2018 04:00:00Manual Reactor Trip Due to Inadequate Feedwater Flow
ENS 53665Saint Lucie12 October 2018 04:00:00Automatic Reactor Trip
ENS 53598Saint Lucie11 September 2018 04:00:00Weld Defect on Pressurizer Interface
ENS 53260Saint Lucie13 March 2018 04:00:00Fitness for Duty - Non-Licensed Supervisor Tested Positive Ffd TestFitness for Duty
ENS 53111Saint Lucie11 December 2017 04:50:00Unusual Event Due to a Smoke Detector Alarm Received Inside Containment
ENS 53085Saint Lucie22 November 2017 14:37:00St. Lucie Unit 2 Unusual Event Due to a Smoke Detector Alarm Received Inside Containment
ENS 53036Saint Lucie26 October 2017 06:12:00Automatic Reactor Trip Following a Loss of Load
ENS 52960Turkey Point10 September 2017 22:55:00Manual Reactor Trip on Lowering Steam Generator Water Level
ENS 52957Crystal River9 September 2017 15:09:00Hurricane Warning Issued Affecting Site within 36 Hours
ENS 52956Saint Lucie8 September 2017 21:14:00Notification of Unusual Event - Hurricane WarningEarthquake
ENS 52952Turkey Point8 September 2017 03:14:00Notification of Unusual Event - Hurricane WarningEarthquake
ENS 52879Saint Lucie31 July 2017 18:00:00Unanalyzed Condition for Hot Leg Injection ScenariosUnanalyzed Condition
ENS 52791Turkey Point6 June 2017 21:51:00Both Standby Steam Generator Feed Pumps Out of Service for Pre-Planned Maintenance
ENS 52757Saint Lucie15 May 2017 22:00:00Valid Emergency Diesel Generator Signal Generated Upon Loss of 4160V PowerPower change
ENS 52796Turkey Point10 April 2017 17:47:00Invalid System Actuation During Testing