Semantic search
Jump to navigation
Jump to search
Site | Start date | Title | Topic | |
---|---|---|---|---|
ENS 56912 | Saint Lucie | 3 January 2024 17:57:00 | Pressure Boundary Degraded / Both Trains of High Pressure Safety Injection Inoperable | Through Wall Leak |
ENS 56893 | Saint Lucie | 16 December 2023 01:45:00 | Reactor Coolant System Leak | Through Wall Leak |
ENS 56813 | Turkey Point | 25 October 2023 01:59:00 | Automatic Reactor Trip | |
ENS 56755 | Turkey Point | 22 September 2023 22:19:00 | Automatic Reactor Trip | |
ENS 56658 | Turkey Point | 4 August 2023 17:20:00 | Manual Reactor Trip | |
ENS 56474 | Turkey Point | 15 April 2023 15:12:00 | RCS Pressure Boundary Degraded | Time of Discovery Through Wall Leak |
ENS 56264 | Turkey Point | 8 December 2022 19:02:00 | Unusual Event Due to Excessive Reactor Coolant System Leakage | |
ENS 56135 | Saint Lucie | 30 September 2022 20:08:00 | Safety System Inoperability | |
ENS 56128 | Saint Lucie | 26 September 2022 21:41:00 | Safety System Inoperability | |
ENS 56087 | Saint Lucie | 3 September 2022 02:48:00 | Manual Reactor Trip Due to Loss of Feed Pump | |
ENS 55831 | Turkey Point | 7 April 2022 23:00:00 | Both Trains of Residual Heat Removal Inoperable | |
ENS 55785 | Turkey Point | 12 March 2022 05:50:00 | Main Steam Isolation Valve Failed to Shut | |
ENS 55768 | Turkey Point | 5 March 2022 15:30:00 | Failed Fitness for Duty Test | Fitness for Duty |
ENS 55757 | Turkey Point | 24 February 2022 21:50:00 | Fitness for Duty | Fitness for Duty |
ENS 55693 | Saint Lucie | 7 January 2022 00:37:00 | Shutdown Initiated in Accordance with Technical Specifications | |
ENS 55641 | Saint Lucie | 10 December 2021 15:24:00 | Manual Reactor Trip | |
ENS 55574 | Turkey Point | 12 November 2021 21:05:00 | Reactor Coolant System Pressure Boundary Degraded | Through-Wall Leak Through Wall Leak |
ENS 55513 | Turkey Point | 9 October 2021 07:00:00 | Auxiliary Feedwater System AUTO-STARTED on Feedwater Isolation Signal | |
ENS 55153 | Turkey Point | 25 March 2021 01:29:00 | Notice of Unusual Event Declared Due to Fire Alarm in Containment | |
ENS 55117 | Turkey Point | 1 March 2021 16:12:00 | Automatic Reactor Trip Due to Reactor Protection System Actuation | |
ENS 55109 | Turkey Point | 20 February 2021 23:30:00 | Offsite Notification Due to Three Individuals in Distress Offshore of the Facility | |
ENS 55078 | Saint Lucie | 20 January 2021 23:22:00 | Automatic Reactor Trip Due to Trip of Motor Control Center | |
ENS 55036 | Turkey Point | 14 December 2020 17:40:00 | Charging Pump and Boration Flowpaths Simultaneously Inoperable | Past operability |
ENS 54847 | Turkey Point | 21 August 2020 03:54:00 | Manual Reactor Trip Due to Steam Generator Water Level Control | |
ENS 54844 | Turkey Point | 19 August 2020 17:25:00 | Automatic Reactor Trip During Startup | |
ENS 54839 | Turkey Point | 18 August 2020 01:13:00 | Manual Reactor Trip Due to Rising Steam Generator Level | |
ENS 54808 | Saint Lucie | 31 July 2020 21:00:00 | Notice of Unusual Event Due to Hurricane Warning Posted for Area | |
ENS 54762 | Turkey Point | 6 July 2020 01:09:00 | Reactor Trip Due to Turbine Trip | |
ENS 54423 | Turkey Point | 5 December 2019 17:20:00 | Offsite Notification Due to Deceased Manatee in Owner Controlled Area | |
ENS 54362 | Saint Lucie | 30 October 2019 04:26:00 | Unusual Event Due to Release of Flammable Gas | |
ENS 54262 | Saint Lucie | 7 September 2019 12:24:00 | Automatic Reactor Trip | |
ENS 54253 | Saint Lucie | 1 September 2019 21:17:00 | En Revision Imported Date 9/4/2019 | |
ENS 54072 | Turkey Point | 18 May 2019 15:08:00 | Manual Reactor Trip Due Grid Disturbance | |
ENS 54046 | Turkey Point | 3 May 2019 12:52:00 | Fitness-For-Duty Report | |
ENS 54027 | Saint Lucie | 25 April 2019 13:18:00 | Automatic Reactor Trip Due to Turbine Generator Trip | |
ENS 53703 | Saint Lucie | 29 October 2018 04:00:00 | Manual Reactor Trip Due to Inadequate Feedwater Flow | |
ENS 53665 | Saint Lucie | 12 October 2018 04:00:00 | Automatic Reactor Trip | |
ENS 53598 | Saint Lucie | 11 September 2018 04:00:00 | Weld Defect on Pressurizer Interface | |
ENS 53260 | Saint Lucie | 13 March 2018 04:00:00 | Fitness for Duty - Non-Licensed Supervisor Tested Positive Ffd Test | Fitness for Duty |
ENS 53111 | Saint Lucie | 11 December 2017 04:50:00 | Unusual Event Due to a Smoke Detector Alarm Received Inside Containment | |
ENS 53085 | Saint Lucie | 22 November 2017 14:37:00 | St. Lucie Unit 2 Unusual Event Due to a Smoke Detector Alarm Received Inside Containment | |
ENS 53036 | Saint Lucie | 26 October 2017 06:12:00 | Automatic Reactor Trip Following a Loss of Load | |
ENS 52960 | Turkey Point | 10 September 2017 22:55:00 | Manual Reactor Trip on Lowering Steam Generator Water Level | |
ENS 52957 | Crystal River | 9 September 2017 15:09:00 | Hurricane Warning Issued Affecting Site within 36 Hours | |
ENS 52956 | Saint Lucie | 8 September 2017 21:14:00 | Notification of Unusual Event - Hurricane Warning | Earthquake |
ENS 52952 | Turkey Point | 8 September 2017 03:14:00 | Notification of Unusual Event - Hurricane Warning | Earthquake |
ENS 52879 | Saint Lucie | 31 July 2017 18:00:00 | Unanalyzed Condition for Hot Leg Injection Scenarios | Unanalyzed Condition |
ENS 52791 | Turkey Point | 6 June 2017 21:51:00 | Both Standby Steam Generator Feed Pumps Out of Service for Pre-Planned Maintenance | |
ENS 52757 | Saint Lucie | 15 May 2017 22:00:00 | Valid Emergency Diesel Generator Signal Generated Upon Loss of 4160V Power | Power change |
ENS 52796 | Turkey Point | 10 April 2017 17:47:00 | Invalid System Actuation During Testing |