At 1400 [EDT], St. Lucie completed a review of Unit 1 Hot Leg Injection scenarios. St. Lucie Unit 1 was licensed with a Hot Leg Injection capability that relies upon manual actions to accomplish the function. This review concluded that some postulated single electrical train failure scenarios were not fully addressed in plant procedures. Because of the potential to extend Hot Leg Injection initiation beyond the analysis start time, St. Lucie is reporting this condition under
10 CFR 50.72(b)(3)(ii)(B).
The affected off-normal procedures were immediately revised to include necessary instructions to restore power to selected valves during a postulated loss of electrical power to restore the Hot Leg Injection strategy. Unit 1 remained at 100% power.
The NRC Resident Inspector has been notified.
A review found this condition was not applicable for Unit 2.