ENS 52957
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
15:09 Sep 9, 2017 | |
Title | Hurricane Warning Issued Affecting Site within 36 Hours |
Event Description | Crystal River Unit 3 is currently undergoing decommissioning and is permanently shut down.
The licensee entered their adverse weather procedure EM-220D based on a Hurricane Warning affecting the site within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. All applicable sections of EM-220D are complete or in progress. No fuel movement activities are in progress. All equipment including Emergency Diesel Generators (EDGS) is available to perform required spent fuel cooling. The licensee will inform the NRC Region I Office. |
Where | |
---|---|
Crystal River ![]() Florida (NRC Region 1) | |
Reporting | |
Other Unspec Reqmnt | |
Time - Person (Reporting Time:+-3.32 h-0.138 days <br />-0.0198 weeks <br />-0.00455 months <br />) | |
Opened: | John Jernigan 11:50 Sep 9, 2017 |
NRC Officer: | Steve Sandin |
Last Updated: | Sep 9, 2017 |
52957 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52957\u003C/a\u003E - \u003Ca href=\"/Crystal_River\" title=\"Crystal River\"\u003ECrystal River\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EHurricane Warning Issued Affecting Site within 36 Hours\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52957 - Crystal River\n","link":"","lat":28.959783333333334,"lon":-82.69345555555556,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 529572017-09-09T15:09:0009 September 2017 15:09:00
[Table view]Other Unspec Reqmnt Hurricane Warning Issued Affecting Site within 36 Hours ENS 467222011-04-04T04:00:0004 April 2011 04:00:00 Other Unspec Reqmnt Press Release Concerning Additional Containment Delamination ENS 466732011-03-14T18:11:00014 March 2011 18:11:00 Other Unspec Reqmnt Additional Delaminated Containment Concrete Discovered ENS 454162009-10-07T23:30:0007 October 2009 23:30:00 Other Unspec Reqmnt Discovery of a Containment Separation ENS 437062007-10-10T17:12:00010 October 2007 17:12:00 Information Only, Other Unspec Reqmnt, 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Pressurizer Porv Opened Momentarily with Rcs Discharge of Approximately 10 Gallons 2017-09-09T15:09:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_52957&oldid=420399"