Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23355A1432024-01-17017 January 2024 January 17, 2024 Public Meeting Handout - Fusion Systems Rulemaking ML23258A1802023-11-0909 November 2023 November 9, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23296A1992023-11-0808 November 2023 Cumulative Effects of Regulation Public Meeting (11/08/2023): Renewing Nuclear Power Plant Operating Licenses Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23258A1712023-11-0101 November 2023 November 1, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule NUREG-1556, November 1, 2023 Public Meeting Handout Preliminary Draft Guidance (NUREG-1556, Volume 22) Fusion Systems Proposed Rule2023-10-31031 October 2023 November 1, 2023 Public Meeting Handout Preliminary Draft Guidance (NUREG-1556, Volume 22) Fusion Systems Proposed Rule ML23240A7182023-08-29029 August 2023 Slides - Public Meeting on Regulatory Basis for Rb-82 Generators, Emerging Medical Technologies, and Other Medical Use of Byproduct Material ML23191A1532023-07-12012 July 2023 Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems ML23123A3292023-06-0606 June 2023 SGI Training ML13108A326 ML23123A3322023-06-0606 June 2023 SGI Pamphlet ML23062A7352023-04-14014 April 2023 Tanana Chiefs Conference 2023 Annual Convention NRC Presentation ML23137A0442023-04-11011 April 2023 April 11, 2023, Presentation to NOAA Narw Northeast U.S. Implementation Team - North Atlantic Right Whale and NRC Endangered Species Act Consultations ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML23019A0122023-01-19019 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Awareness Training for NRC & Agreement State Inspectors ML23012A2302023-01-12012 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Public Presentation - Decommissioning Fuel Cycle, Uranium Recovery & Materials Inspection Program ML23006A0232022-12-15015 December 2022 NEIs Presentation for the December 15, 2022 Spent Fuel Priorities Meeting with NEI ML22334A1022022-12-0505 December 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Fall 2022 Meeting Handout ML22334A2692022-11-30030 November 2022 Advisory Committee on the Medical Uses of Isotope (ACMUI) Fall 2022 Meeting Handout (Revised) ML22326A2222022-11-23023 November 2022 Future of the National Materials Program Working Group Public Meeting: Presentation ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML22308A0502022-11-0303 November 2022 Presentation 2 Chapman NRC Background Slides Nov 3 2022 Discrete Radioactive Particle (DRP) Workshop ML22308A0512022-11-0303 November 2022 Presentation 3b Parks DRP Exposure Scenarios November 3, 2022 DRP Workshop Presentation ML22301A1612022-10-28028 October 2022 Discussion Questions for DRP Workshop ML22286A0712022-10-25025 October 2022 Harmonization of Transportation Safety Requirements with International Atomic Energy Agency Standards (Rin 3150-AJ85; NRC-2016-0179); Public Meeting Presentation ML22272A0382022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1B Section-by-Section, Backfit and Issue Finality, and Availability of Guidance Documents ML22272A0362022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1A Preamble (E.G. Statements of Consideration) ML22272A0392022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1C Part 2 Through Part 53 Framework a Rule Language ML22272A0402022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1D Part 53 Framework B Through Part 171 Rule Language ML22272A0422022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DG-1413 Technology-Inclusive Identification of Licensing Events for Commercial Nuclear Plants ML22272A0472022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DRO-ISG-2023-01 Operator Licensing Programs ML22272A0492022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DRO-ISG-2023-02 Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR Part 50.54 ML22272A0512022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53- DRO-ISG-2023-03 Development of Scalable Human Factors Engineering Review Plans ML22272A0452022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DG-1414 Alternative Evaluation for Risk Insights (Aeri) Methodology ML22238A2542022-08-31031 August 2022 Slides - Reporting Events and Event Trending, 2022 Annual OAS Meeting ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22137A3232022-04-0505 April 2022 NRC 2022 and ACMUI 2021 Medical Event Summary Presentations ML22112A1042022-04-0505 April 2022 NRC Staff Medical Event Slide, April 5, 2022, FY21 ML22089A1892022-04-0505 April 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Spring Meeting 2022 Handout ML22094A1022022-04-0505 April 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Spring Meeting 2022 Revised Handout ML22097A1412022-03-24024 March 2022 Part 53 Rulemaking - Advanced Reactor Applications Presentation on March 24, 2022 ML22097A1312022-03-23023 March 2022 Decommissioning Rulemaking Presentation on March 23, 2022 ML22041A3352022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting Redline RG 5.84, Rev 1, Fitness-For -Duty Programs at New Reactor Construction Sites ML22042A1162022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting Draft NUREG 1021, Rev 13, Operator Licensing Examination Standards for Power Reactors ML22042A1042022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting Redline RG 1.149, Rev 5, Nuclear Power Plant Simulation Facilities for Use in Operator Training, License Examinations, and Applicant Experience Requirements ML22041A5322022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting Redline Standard Review Plan 19.1 Determining the Technical Adequacy of Probablistic Risk Assessment for Risk-Informed License Amendment Requests After Initial Fuel Load ML22041A5272022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting Redline Standard Review Plan 19.0 Probablistic Risk Assessment and Accident Evaluation for New Reactors ML22041A4562022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting - Redline Standard Review Plan 13.6.4 Access Authorization - Operational Program ML22041A4462022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting - Redline Standard Review Plan 13.6.1 Physical Security-Combined License and Operating Reactors ML22041A4442022-02-0909 February 2022 Document to Support ACRS Subcommittee Meeting - Redline Standard Review Plan 13.3 Emergency Planning 2024-01-30
[Table view]Some use of "" in your query was not closed by a matching "". Category:Slides and Viewgraphs
MONTHYEARML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23355A1442024-01-17017 January 2024 January 17, 2024 Public Meeting Presentations - Fusion Systems Rulemaking ML23258A1802023-11-0909 November 2023 November 9, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23296A1992023-11-0808 November 2023 Cumulative Effects of Regulation Public Meeting (11/08/2023): Renewing Nuclear Power Plant Operating Licenses Environmental Review (Rin 3150-AK32; NRC-2018-0296) SECY-21-0109, 11/2/2023 ACRS Full Committee Meeting: Increased Enrichment of Conventional and Accident Tolerant Fuel Designs for Light-Water Reactors2023-11-0202 November 2023 11/2/2023 ACRS Full Committee Meeting: Increased Enrichment of Conventional and Accident Tolerant Fuel Designs for Light-Water Reactors ML23258A1712023-11-0101 November 2023 November 1, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23258A1472023-10-11011 October 2023 October 11, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23241A9492023-09-0606 September 2023 09-06-2023 Rulemaking: Proposed Rule: Public Meeting Slides - ASME 2021-2022 Code Editions Proposed Rule ML23240A7182023-08-29029 August 2023 Slides - Public Meeting on Regulatory Basis for Rb-82 Generators, Emerging Medical Technologies, and Other Medical Use of Byproduct Material ML23191A1532023-07-12012 July 2023 Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems ML23200A3452023-06-20020 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Jack Parrott on Decommissioning ML23186A0212023-06-0808 June 2023 Spent Nuclear Fuel Shipments in the Us: Addressing the Myths ML23123A3292023-06-0606 June 2023 SGI Training ML13108A326 ML23123A3322023-06-0606 June 2023 SGI Pamphlet ML23130A0332023-05-11011 May 2023 NRC Presentation Browns Ferry Subsequent License Renewal Pre-application Meeting, Environmental Overview ML23062A7352023-04-14014 April 2023 Tanana Chiefs Conference 2023 Annual Convention NRC Presentation ML23102A0522023-04-12012 April 2023 Meeting Slide: Information Meeting with Federally-Recognize Tribes Regarding the Proposed Rule Renewing Nuclear Power Plant Operating Licenses Environmental Review ML23137A0442023-04-11011 April 2023 April 11, 2023, Presentation to NOAA Narw Northeast U.S. Implementation Team - North Atlantic Right Whale and NRC Endangered Species Act Consultations ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML23069A0132023-03-10010 March 2023 Pubic Meeting Slides - Proposed Rule: Renewing Nuclear Power Plant Operating Licenses - Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23019A0122023-01-19019 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Awareness Training for NRC & Agreement State Inspectors ML23012A2302023-01-12012 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Public Presentation - Decommissioning Fuel Cycle, Uranium Recovery & Materials Inspection Program ML23006A0232022-12-15015 December 2022 NEIs Presentation for the December 15, 2022 Spent Fuel Priorities Meeting with NEI ML22326A2222022-11-23023 November 2022 Future of the National Materials Program Working Group Public Meeting: Presentation ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML22308A0502022-11-0303 November 2022 Presentation 2 Chapman NRC Background Slides Nov 3 2022 Discrete Radioactive Particle (DRP) Workshop ML22308A0512022-11-0303 November 2022 Presentation 3b Parks DRP Exposure Scenarios November 3, 2022 DRP Workshop Presentation ML22301A1612022-10-28028 October 2022 Discussion Questions for DRP Workshop ML22286A0712022-10-25025 October 2022 Harmonization of Transportation Safety Requirements with International Atomic Energy Agency Standards (Rin 3150-AJ85; NRC-2016-0179); Public Meeting Presentation ML22238A2542022-08-31031 August 2022 Slides - Reporting Events and Event Trending, 2022 Annual OAS Meeting ML22203A0192022-08-30030 August 2022 Patient Release Brochure Medical-Chinese Language ML22203A0202022-08-30030 August 2022 Patient Release Brochure Medical-French Language ML22203A0212022-08-30030 August 2022 Patient Release Brochure Medical-Spanish Language ML22221A1402022-08-10010 August 2022 Enclosure 2 - SGI Awareness Training ML22221A1412022-08-10010 August 2022 Enclosure 3 - Protection of SGI Pamphlet ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22137A3232022-04-0505 April 2022 NRC 2022 and ACMUI 2021 Medical Event Summary Presentations ML22112A1042022-04-0505 April 2022 NRC Staff Medical Event Slide, April 5, 2022, FY21 ML22088A2252022-03-30030 March 2022 Kairos Environmental Audit Closeout Meeting Presentation ML22097A1412022-03-24024 March 2022 Part 53 Rulemaking - Advanced Reactor Applications Presentation on March 24, 2022 ML22097A1312022-03-23023 March 2022 Decommissioning Rulemaking Presentation on March 23, 2022 ML22140A3102022-03-0808 March 2022 clarkt-hv-th24 ML22046A0782022-03-0808 March 2022 RIC 2022 Digital Exhibit - VLSSIR in NMSS ML21302A2472021-11-0404 November 2021 Nuclear Waste Technical Review Board - NRCs Development and Use of Performance Assessment Presentation Slides ML21285A0412021-10-13013 October 2021 Summary of September 29, 2021 Meeting with the U.S. Fish and Wildlife Service Regarding Crocodile Monitoring at Turkey Point ML21271A1392021-09-28028 September 2021 ISFSI Pre-Application Meeting Presentation by Pacific Gas & Electric for License Amendment Request to Revise the License and Technical Specifications ML21236A3192021-08-26026 August 2021 August 26, 2021 Public Meeting Presentation of the Draft Environmental Impact Statement for the Columbia Fuel Fabrication Facility License Renewal ML21201A0282021-07-23023 July 2021 Handout for Meeting with Holtec on HI-STORM 100 Amendment No. 16 (July 27, 2021) ML21208A2222021-07-14014 July 2021 2-6 Survey Issues with Excavations from Recent Decommissionings 2024-01-30
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Part 53 Rulemaking Overview State Liaison Officer Conference March 24, 2022
Background Discussion of Part 53 Rulemaking
NRC is preparing for a Variety of Advanced Nuclear Technologies Research Molten Salt Small and Test Reactors Modular Reactors Reactors Current and potential 13+ applications by 2027 EVOLVING LANDSCAPE Potential operating licenses by High-Temperature Liquid Metal Micro-Reactors 6+ 2027 Gas-Cooled Cooled Fast Reactors Reactors
- Many different reactor technologies
- Range of sizes from < 10 MWt to 600 MWt
- Multiple reactors on a single site
- Hazards vary with power level and radionuclide inventory 3
Modernizing the Regulatory Framework Functional Part 53 Emergency Containment Preparedness (SECY-18-0096) (SECY-22-0001)
Advanced Physical Nuclear Security for Reactor Advanced GEIS Technology-Inclusive, Reactors Risk-Informed Regulatory Framework Licensing TICAP/ARCAP Modernization Project Fuel Application Qualification Adv Rx Siting Level of RG 1.233 (NUREG-2246) (SECY-20-0045) Detail See SECY-22-0008, Advanced Reactor Program Status 4
Other Ongoing Advanced Reactor Activities to be Included in Part 53: Emergency Preparedness
(https://www.nrc.gov/docs/ML2120/ML21200A055.html)
- This rule requires applicants and licensees to develop and maintain an emergency plan that provides reasonable assurance of adequate protective measures will be taken in a radiological emergency.
5
Other Ongoing Advanced Reactor Activities to be Included in Part 53: Siting
- Some interest by the U.S. Department of Energy and stakeholders to evaluate current siting guidance developed for large light water reactors
- Staff provided SECY-20-0045, Population-Related Siting Considerations for Advanced Reactors, with options related to guidance on population densities (currently 500 persons per square mile to 20 miles) and paper remains under Commission review (https://www.nrc.gov/docs/ML2120/ML19262H055.html) o Options include consequence dependent approach similar to that being considered for emergency planning zones 6
Part 53 Rulemaking Schedule 7
Part 53 Rulemaking Objectives
- 1. Continue to provide reasonable assurance of adequate protection of public health and safety and the common defense and security,
- 2. Promote regulatory stability, predictability, and clarity,
- 3. Reduce requests for exemptions from the current requirements in 10 CFR Part 50 and 10 CFR Part 52,
- 4. Establish new requirements to address non-light-water reactor technologies,
- 5. Recognize technological advancements in reactor design, and
- 6. Credit the response of advanced nuclear reactors to postulated accidents, including slower transient response times and relatively small and slow release of fission products.
8
Part 53 Overview Part 53 rulemaking addresses plant lifecycle with appropriate flexibilities and safety focus 9 9
Subpart A - General Provisions
- This subpart includes sections related to topics such as scope, definitions, interpretations, relationships to other parts, communications, misconduct, employee protections, and exemptions.
- Most sections in this subpart were developed based on similar or identical requirements in existing parts of NRC regulations.
10
Subpart B - Technology-Inclusive Safety Requirements
- Safety Objectives (B) Safety Criteria What function(s)
- Safety Criteria (e.g., a barrier, cooling) are needed to satisfy safety criteria
- Licensing Basis Events (B) Safety Functions What design features (e.g., a structure, system)
- Defense in Depth are provided to fulfill the safety function(s)
- Normal Operations and (C) Design Features Protection of Plant (and Human Actions) What design criteria (e.g., leak rate, cooling Workers capacity) are needed for design feature (C) Functional Design Criteria (Personnel; Concept of Operations) 11
Subpart C - Design and Analysis Requirements
- Includes requirements for identification of Design Features and Functional Design Criteria as well as specific design requirements (e.g., using of consensus codes and standards, considering degradation mechanisms, achieving subcriticality, providing long-term cooling, earthquake engineering).
- Includes analysis requirements (e.g., use of a probabilistic risk assessment, qualification of analytical tools) and requirements related to the safety categorization and treatment of plant equipment.
- Addresses how safety margins in the design can be balanced with flexibilities during operations.
12
Subpart D - Siting Requirements
- Addresses requirements associated with the siting of commercial nuclear plants.
- Establishes the overall siting-related considerations in relation to the safety criteria in Subpart B and interfaces with the design (e.g., external hazards).
- Recognizes that some applicants may propose designs that would allow them to essentially collapse the exclusion area and low population zone to the site boundary by demonstrating that the design basis accident does not challenge the dose-related criteria in this section (incorporating concepts in SECY-20-0045).
13
Subpart E - Construction and Manufacturing Requirements
- This subpart addresses requirements for the construction of a commercial nuclear plant and the possible factory fabrication of reactors using a manufacturing license.
- The preliminary language for construction-related activities reflects current requirements without any fundamental changes.
- The preliminary language for manufacturing activities largely mirrors the construction-related activities.
14
Subpart F - Requirements for Operation
- Defines the requirements during the operating phase of a commercial nuclear plant to ensure the safety criteria design & analysis requirements continue to be satisfied throughout the plants lifetime
- Provides requirements on:
- 1. Plant equipment (e.g., configuration control, testing)
- 2. Plant personnel (e.g., operator licensing, training)
- 3. Plant programs (e.g., radiation protection, emergency preparedness, security) 15
Subpart G - Decommissioning Requirements
- This subpart includes requirements related to maintaining financial assurance for decommissioning, requirements for transitioning from operations to decommissioning, termination of commercial nuclear plant licenses, and ultimately supporting unrestricted use of the site.
- Most sections in this subpart were developed based on the existing decommissioning requirements.
- Includes a requirement to perform site-specific cost estimates for decommissioning.
16
Subpart H - Licenses, Certifications and Approvals
- General requirements for the contents of applications for all NRC licenses, approvals, and certifications.
- Application requirements tailored to match Part 53 technical requirements.
17
Subpart I - Maintaining and Revising Licensing Basis Information
- Subpart I and some provisions within Subpart H define the requirements and processes for maintaining licensing basis information.
- The subpart is generally organized into those sections dealing with (1) licensing basis information that licensees are not authorized to change without NRC approval (e.g., licenses, regulations) and (2) licensing basis documents that licensees may change if specified criteria are satisfied.
18
Subpart J - Reporting and Other Administrative Requirements
- This subpart includes sections related to ensuring that NRC inspectors have unfettered access to sites and facilities licensed or proposed to be licensed, maintaining records and making reports to the NRC, meeting financial qualification and reporting requirements, and obtaining and maintaining required financial protections in case of an accident
- Most sections in this subpart were developed based on similar or identical requirements in existing parts of NRC regulations.
19
Subpart K - Quality Assurance Criteria
- Requirements related to quality assurance are similar to current requirements in Appendix B to Part 50 20
Part 53 - Framework B (formerly Part 5X)
- Consideration of stakeholder requests for an option for a more traditional, deterministic licensing framework for advanced reactors
- Provides technology-inclusive alternatives to light water reactor-centric requirements in Part 50
- Aligns with international standards (i.e., IAEA)
- Developing guidance for systematic searches for hazards, initiating events, and accident scenarios
- Includes alternative to PRA for gaining risk insights 21
Part 73 Security and Part 26 Fitness for Duty
- § 73.100 - Physical security requirements at nuclear plants against radiological sabotage
- § 73.110 - Technology neutral requirements for protection of digital computer and communication systems and networks
- § 73.120 - Access authorization
Next StepsFuture Public Meetings
- The staff will continue to announce public meetings to discuss and receive feedback on various regulatory topics and preliminary proposed rule text.
o March 29, 2022 - Discussion of key topics related to Part 53 o Spring/Summer, 2022 - Framework B preliminary proposed rule language; next iteration of Framework A o Preliminary proposed rule text will be posted on regulations.gov under docket ID NRC-2019-0062 before the public meetings and in ADAMS at ML20289A534.
- Stay informed! Subscribe to GovDelivery:
https://service.govdelivery.com/accounts/USNRC/subscriber/new 23
Final Discussion and Questions 24
Closing Remarks Rulemaking Contacts Robert.Beall@nrc.gov 301-415-3874 Jordan.Hoellman2@nrc.gov 301-415-5481 Regulations.gov docket ID: NRC-2019-0062 25
Acronyms and Abbreviations Agencywide Documents Access and ADAMS Management System ARCAP Advanced reactor content of application project CFR Code of Federal Regulations GEIS Generic environmental impact statement IAEA International Atomic Energy Agency MWt Megawatt thermal Nuclear Energy Innovation and Modernization NEIMA Act NUREG NRC technical report designation RG Regulatory guide SECY Office of the Secretary Technology-inclusive content of application TICAP project 26
Background Slides 27
Other Ongoing Advanced Reactor Activities Fusion
- NEIMA also addresses fusion energy systems
- Commission directed NRC staff to develop options on the licensing and regulating fusion energy systems
- NRC staff interacting with stakeholders
- Commission paper with options planned for late 2022
- Utilization facility (reactor) framework
- Material licensing (Part 30) framework
Leveraging and Combining Existing Licensing Processes Operations Fuel Load Operating License Site (OL) selected Combined License (COL)
Use OL or custom COL to develop a CP based on Site subsequent DC SDA, ML or DC selected Standard Design Manufacturing Design Approval (SDA) License (ML) Certification(DC)
Part 50 Construction Part 52 Site selected CP and COL may reference Early Site Permit Permit (CP) Part 53 (ESP) 29