EPID:L-2021-LLM-0002, El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 (Open) |
|
MONTHYEARML21077A2562021-03-18018 March 2021 El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 Project stage: Request ML21103A3632021-04-13013 April 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Indirect Transfer of Control of Licenses Pursuant to 10 CFR 50.80 and 10 CFR 72.50 Project stage: Acceptance Review ML21106A1482021-04-28028 April 2021 ISFSI - Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing Project stage: Other ML21106A1502021-04-28028 April 2021 ISFSI - FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing Project stage: Other ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) Project stage: Other 2021-04-13
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML22118B1622022-04-28028 April 2022 Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements - Supplement ML22090A0982022-03-31031 March 2022 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements ML22054A0062022-03-23023 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) Exemption ML22054A0052022-03-23023 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) Letter ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) ML22020A0402022-01-21021 January 2022 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L 2022 Lle 0005 (Covid 19)) ML22020A0172022-01-19019 January 2022 Incoming Request from Palo Verde-Arizona Public Service Co. Re COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML22014A4152022-01-14014 January 2022 Request for Exemption from Certain Requirements in 10 CFR 50.62(c)(1) Using Risk-Informed Process for Evaluations ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML20355A0002021-01-0505 January 2021 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0XXX (COVID-19)) ML20357A0552020-12-23023 December 2020 Subsequent Request for Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0238 (COVID-19)) ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20356A2922020-12-21021 December 2020 Independent Spent Fuel Storage Installation (ISFSI) - Subsequent Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ML20353A3912020-12-18018 December 2020 Independent Spent Fuel Storage Installation (ISFSI) - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3(l)(1) ML20303A0152020-11-0202 November 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0170 (COVID-19)) ML20302A4172020-10-28028 October 2020 Independent Spent Fuel Storage Installation, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML20107F8352020-04-16016 April 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0024 (COVID-19)) ML19205A2732019-08-19019 August 2019 Environmental Assessment for the Exemption Request for Arizona Public Service Company'S Palo Verde Nuclear Generating Installation in Wintersburg, Arizona ML19186A4492019-07-0505 July 2019 Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 ML0931605962009-11-0202 November 2009 Request for Temporary Exemption from the Provisions of 10 CFR 50.46 and 10 CFR 50, Appendix K for Lead Fuel Assemblies ML0827300062008-10-14014 October 2008 Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies ML0827300032008-10-14014 October 2008 Transmittal Letter, Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies 2023-07-05
[Table view] Category:Federal Register Notice
MONTHYEARML23166B0852023-07-0606 July 2023 FRN: for Issuance of Exemption ML23045A3112023-03-15015 March 2023 Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN) ML22146A1872022-06-0101 June 2022 FRN for Issuance of Exemption ML22101A2572022-05-11011 May 2022 Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN) ML22054A0072022-03-24024 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) FRN ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) ML21307A1332021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (Superseding Order of October 21, 2021) (FRN) ML21307A1312021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21245A0662021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (FRN) ML21245A0642021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21245A0652021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Order) ML21165A0542021-06-23023 June 2021 Letter, Notice of Consideration of Approval of Application Proposed Transfer of Control of Licenses and Opportunity to Request a Hearing ML21165A0562021-06-23023 June 2021 FRN - Notice of Consideration of Approval of Application Proposed Transfer of Control of Licenses and Opportunity to Request a Hearing ML21118B0312021-05-25025 May 2021 FRN - Order Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21118B0292021-05-25025 May 2021 Order Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation (EPID L-2020-LLM-0002) (Order) ML21106A1482021-04-28028 April 2021 ISFSI - Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing ML21106A1502021-04-28028 April 2021 ISFSI - FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing ML21028A0122021-02-18018 February 2021 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for January 2021 ML21011A2592021-01-21021 January 2021 ISFSI, FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity for a Hearing ML21011A2492021-01-21021 January 2021 ISFSI, Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity for a Hearing ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML19213A0342019-08-23023 August 2019 Federal Register Notice: Palo Verde Nuclear Generating Station Independent Spent Fuel Storage Installation - Issuance of Exemption ML19205A2742019-08-19019 August 2019 Federal Register Notice: Palo Verde Nuclear Generating Station ISFSI - Environmental Assessment and Finding of No Significant Impact; Issuance ML19122A2102019-05-15015 May 2019 Federal Register Notice: Palo Verde Independent Spent Fuel Storage Installation - Environmental Assessment and Finding of No Significant Impact; Issuance NRC-2018-0277, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: January2018-12-13013 December 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: January 8, 2 ML18334A2202018-12-13013 December 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: January 8, 2 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML16257A5172016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 20162016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16215A2272016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20162016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 20162016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16131A7952016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 NRC-2015-0269, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 20152015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15328A5502015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15252A1102015-09-11011 September 2015 Letter, Newspaper Notice, Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML14059A1812014-03-0707 March 2014 FRN - Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations 2023-07-06
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. STN 50-528, STN 50-529, STN-530, and 72-44; NRC-2021-0100]
In the Matter of Arizona Public Service Company El Paso Electric Company Palo Verde Nuclear Generating Station, Units 1, 2, and 3 and Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission.
ACTION: Indirect transfer of control of licenses; order.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) is issuing an order approving the application dated March 18, 2021, filed by El Paso Electric Company (EPE). The application sought NRC consent to the indirect transfer of control of EPEs interests in Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, and the general license for the Palo Verde Independent Spent Fuel Storage Installation (together, the facility). No physical changes or operational changes to the facility were proposed in the application.
DATES: The order was issued on January 25, 2022, and is effective immediately.
ADDRESSES: Please refer to Docket ID NRC-2021-0100 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0100. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email:
Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to PDR.Resource@nrc.gov. The license transfer order and the NRC staff safety evaluation supporting the order are available in ADAMS under Package Accession No. ML22003A102.
NRCs PDR: You may examine and purchase copies of public documents, by appointment, at the NRCs PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Siva P. Lingam, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1564, email: Siva.Lingam@nrc.gov.
2
SUPPLEMENTARY INFORMATION: The text of the order is attached.
Dated: January 26, 2022.
For the Nuclear Regulatory Commission.
/RA/
Siva P. Lingam, Project Manager, Plant Licensing Branch IV, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
3
Attachment - Order Approving Indirect Transfer of Control of Licenses UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
Arizona Public Service Company )
El Paso Electric Company )
)
Palo Verde Nuclear Generating Station, ) Docket Nos. STN 50-528, STN 50-529, Units 1, 2, and 3 and Independent Spent ) STN 50-530, and 72-44 Fuel Storage Installation ) License Nos. NPF-41, NPF-51, and NPF-74 ORDER APPROVING INDIRECT TRANSFER OF CONTROL OF LICENSES I.
Arizona Public Service Company (APS) is the licensed operator and a licensed co-owner of Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, and the general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI). Palo Verde is located in Maricopa County, Arizona. The other licensed co-owners (tenants-in-common), Salt River Project Agricultural Improvement and Power District; Southern California Edison Company; El Paso Electric Company (EPE); Public Service Company of New Mexico; Southern California Public Power Authority; and Los Angeles Department of Water and Power, hold possession-only rights for these licenses (i.e., they are not licensed to operate the facility).
II.
By application dated March 18, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML21077A256), EPE requested pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Sections 50.80,
Transfer of licenses, and 72.50, Transfer of license, that the U.S. Nuclear Regulatory Commission (NRC, the Commission) consent to the indirect transfer of control of the Palo Verde NRC licenses.
According to the application, EPE currently owns a 15.8 percent tenant-in-common interest and holds possession-only rights in the Palo Verde NRC licenses. The indirect transfer of control of EPEs possession only non-operating interests in the Palo Verde NRC licenses resulted from the acquisition of an approximately 33.3 percent membership interest in IIF US Holding 2 GP, LLC (IIF US 2 GP), the general partner of IIF US Holding 2 LP (IIF US 2), by a private individual, Anne Cleary, a U.S. citizen, subsequent to the retirement and relinquishment of an approximately 33.3 percent IIF US 2 GP membership interest held by Dennis Clarke, a U.S. citizen. APS owns a 29.1 percent tenant-in-common interest and holds both operating and possession rights in the Palo Verde NRC licenses. Further, APS operates, and will continue to operate, each of the Palo Verde units and the ISFSI pursuant to the operating rights granted to it under the license of each Palo Verde unit. The remaining tenant-in-common co-owners that hold possession-only rights in the Palo Verde NRC licenses are: Salt River Project Agricultural Improvement and Power District (17.49 percent); Southern California Edison Company (15.8 percent); Public Service Company of New Mexico (10.2 percent);
Southern California Public Power Authority (5.91 percent); and Los Angeles Department of Water and Power (5.7 percent).
According to the application, the transaction involved the issuance of the approximately 33.3 percent interest in IIF US 2 GP that was relinquished by Dennis Clarke on September 30, 2020, to Anne Cleary pursuant to that certain resolution dated September 30, 2020, of the IIF US 2 GP Owners, Rita J. Sallis and Christopher Ward.
As a result of the transaction, as of December 17, 2020, Anne Cleary became an 2
approximately 33.3 percent owner of IIF US 2 GP and indirect owner of EPE. The approximately 33.3 percent interests of each of Rita J. Sallis and Christopher Ward were unaffected by the transaction.
After the transaction, Anne Cleary owns an approximately 33.3 percent membership interest in IIF US 2 GP. APS continues to own a 29.1 percent tenant-in-common interest and continues to hold both operating and possession rights in the Palo Verde NRC licenses. Further, APS continues to operate each of the Palo Verde units and the ISFSI pursuant to the operating rights granted to it under the license of each Palo Verde unit. Also, as before the transaction, no entity owns 50 percent or more of the voting interests. Accordingly, after the transaction, there is no change in the control of the operation of Palo Verde; APS continues to make all technical decisions that do not require approval from all owners of Palo Verde.
No physical changes or operational changes were proposed in the application.
A notice of the application and opportunity to comment, request a hearing, and petition for leave to intervene on the application was published in the Federal Register (FR) on May 4, 2021 (86 FR 23757). The NRC did not receive any comments or hearing requests on the application.
Under 10 CFR 50.80 and 10 CFR 72.50, no license for a production or utilization facility or ISFSI, or any right thereunder, shall be transferred, either voluntarily or involuntarily, directly or indirectly, through transfer of control of the license to any person, unless the Commission gives its consent in writing. Upon review of the information in the application, and other information before the Commission, the NRC staff has determined that the acquisition of an approximately 33.3 percent membership interest in IIF US 2 GP by Anne Cleary is acceptable. The transferee is qualified to be the indirect holder of the licenses and indirect transfer of the licenses is otherwise consistent with 3
applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto.
The findings set forth above are supported by an NRC staff safety evaluation dated the same date as this Order, which is available at ADAMS Accession No. ML22003A105.
III.
Accordingly, pursuant to Sections 161b, 161i, and 184 of the Atomic Energy Act of 1954, as amended, 42 USC §§ 2201(b), 2201(i), and 2234; and 10 CFR 50.80 and 10 CFR 72.50, IT IS HEREBY ORDERED that the application regarding the indirect transfer of control of licenses is approved for Palo Verde Units 1, 2, and 3 and the Palo Verde ISFSI.
This Order is effective upon issuance.
For further details with respect to this Order, see the application dated March 18, 2021, and the NRC staffs safety evaluation dated the same date as this Order, which are available for public inspection electronically through ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems accessing the documents located in ADAMS should contact the NRC Public Document Room reference staff by telephone at 1-800-397-4209 or 301-415-4737 or by email to PDR.Resource@nrc.gov.
Dated: January 25, 2022.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Brian D. Wittick, Acting Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
4