Letter Sequence Request |
---|
EPID:L-2020-LLE-0170, Independent Spent Fuel Storage Installation, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs (Approved, Closed) |
|
MONTHYEARML20302A4172020-10-28028 October 2020 Independent Spent Fuel Storage Installation, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs Project stage: Request ML20303A0152020-11-0202 November 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0170 (COVID-19)) Project stage: Approval 2020-10-28
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML22118B1622022-04-28028 April 2022 Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements - Supplement ML22090A0982022-03-31031 March 2022 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements ML22054A0062022-03-23023 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) Exemption ML22054A0052022-03-23023 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) Letter ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) ML22020A0402022-01-21021 January 2022 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L 2022 Lle 0005 (Covid 19)) ML22020A0172022-01-19019 January 2022 Incoming Request from Palo Verde-Arizona Public Service Co. Re COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML22014A4152022-01-14014 January 2022 Request for Exemption from Certain Requirements in 10 CFR 50.62(c)(1) Using Risk-Informed Process for Evaluations ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML20355A0002021-01-0505 January 2021 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0XXX (COVID-19)) ML20357A0552020-12-23023 December 2020 Subsequent Request for Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0238 (COVID-19)) ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20356A2922020-12-21021 December 2020 Independent Spent Fuel Storage Installation (ISFSI) - Subsequent Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ML20353A3912020-12-18018 December 2020 Independent Spent Fuel Storage Installation (ISFSI) - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3(l)(1) ML20303A0152020-11-0202 November 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0170 (COVID-19)) ML20302A4172020-10-28028 October 2020 Independent Spent Fuel Storage Installation, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML20107F8352020-04-16016 April 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0024 (COVID-19)) ML19205A2732019-08-19019 August 2019 Environmental Assessment for the Exemption Request for Arizona Public Service Company'S Palo Verde Nuclear Generating Installation in Wintersburg, Arizona ML19186A4492019-07-0505 July 2019 Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 ML0931605962009-11-0202 November 2009 Request for Temporary Exemption from the Provisions of 10 CFR 50.46 and 10 CFR 50, Appendix K for Lead Fuel Assemblies ML0827300062008-10-14014 October 2008 Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies ML0827300032008-10-14014 October 2008 Transmittal Letter, Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies 2023-07-05
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
10 CFR 26.9 BRUCE J. RASH Vice President, Nuclear 102-08185-BJR/LMW Engineering/Regulatory October 28, 2020 Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7602 Tel 623.393.5102 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Reference:
NRC Letter from H. Nieh to NEI dated March 28, 2020, U.S. NUCLEAR REGULATORY COMMISSION PLANNED ACTIONS RELATED TO THE REQUIREMENTS FOR WORK HOUR CONTROLS DURING THE CORONAVIRUS DISEASE 2019 PUBLIC HEALTH EMERGENCY, [Agencywide Document Access and Management System (ADAMS) Accession Number ML20087P237]
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 and Independent Spent Fuel Storage Installation (ISFSI)
Docket Nos. STN 50-528/529/530 and 72.44 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs As a result of the Coronavirus Disease 2019 (COVID-19) public health emergency (PHE)
Arizona Public Service Company (APS) has proactively determined that PVNGS can no longer meet the work-hour controls of Title 10 of the Code of Federal Regulation (10 CFR)
Part 26, Fitness for Duty Programs, Section 26.205(d) for the covered workers noted below. By implementing the alternative work-hour controls, APS is proactively taking steps to complete necessary work, testing, and inspections in a manner that supports both worker and neighboring community safety to limit the spread of COVID-19.
Pursuant to 10 CFR 26.9, this request is being made in support of the efforts to maintain the recommendations made by the Centers for Disease Control and Prevention (CDC) related to social distancing, worker screening, and limiting close-proximity work.
Particularly given the challenges that COVID-19 could present in the immediate community surrounding PVNGS, leveraging the alternative work-hour controls will assist in facilitating further worker and community protection as APS continues the current Unit 1 refueling outage and daily operation of Units 2 and 3.
As the U.S. Departments of Homeland Security and Energy have stated in their guidance, the electric grid and nuclear plant operation make up the nation's critical infrastructure similar to the medical, food, communications, and other critical industries. The PVNGS daily operation of Units 2 and 3 and the current Unit 1 refueling outage must be conducted such that all three units are available when needed.
$PHPEHURIWKH67$56$OOLDQFH//&
&DOODZD\'LDEOR&DQ\RQ3DOR9HUGH:ROI&UHHN
102-08185-BJR/LMW ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Request for Exemption from Specific Requirements of 10 CFR Part 26 Page 2 In accordance with the Reference, the following information is provided in the table below:
x Positions [as described in 10 CFR 26.4(a)(1) - (5)] for which either current work-hour controls will be maintained, or for which alternative controls will be required as a preventive measure.
x The date and time for which alternative controls (if necessary) will be implemented for the listed positions.
Positions Compliance Begin Implementation 26.4(a)(1) Operators Will phase in site-specific Upon NRC Approval alternative work-hour controls as defined in the Reference, as necessary, to minimize transition issues.
26.4(a)(2) Health Physics and Will phase in site-specific Upon NRC Approval Chemistry alternative work-hour controls as defined in the Reference, as necessary, to minimize transition issues.
26.4(a)(3) Fire Team Advisor Will phase in site-specific Upon NRC Approval (Operations fire alternative work-hour controls as brigade member) defined in the Reference, as necessary, to minimize transition issues.
26.4(a)(4) Maintenance Will phase in site-specific Upon NRC Approval alternative work-hour controls as defined in the Reference, as necessary, to minimize transition issues.
26.4(a)(5) Security Will phase in site-specific Upon NRC Approval alternative work-hour controls as defined in the Reference, as necessary, to minimize transition issues.
The PVNGS site-specific COVID-19 PHE fatigue-management controls are consistent with the constraints outlined in the Reference and its attachment.
APS will continue to follow the fatigue-management controls, behavioral observation requirements, and self-declaration allowances in accordance with the current work-hour control program and station Procedure 01DP-0AP17, Managing Personnel Fatigue.
Upon NRC approval, APS will implement the alternative controls described below, consistent with the Reference for the management of fatigue during the period of the exemption.
These controls ensure that covered workers are subjected to the following minimum controls:
(1) not more than 16 work-hours in any 24-hour period and not more than 86 work-hours in any 7-day period, excluding shift turnover;
102-08185-BJR/LMW ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Request for Exemption from Specific Requirements of 10 CFR Part 26 Page 3 (2) a minimum 10-hour break is provided between successive work periods; (3) 12-hour shifts are limited to not more than 14 consecutive days; (4) a minimum of 6 days off are provided in any 30-day period; and (5) requirements are established for behavioral observation and self-declaration during the period of the exemption.
The requirements of 10 CFR 26.33, Behavioral observation; 10 CFR 26.209, Self-declarations; and 10 CFR 26.211, Fatigue assessments, remain in effect during the period of the exemption. These requirements provide reasonable assurance that should personnel become impaired due to fatigue, requirements and processes are in place to identify the impairment through observation by plant staff or by worker self-declaration, and to assess and address instances of impairment through fatigue assessments.
Upon NRC approval, APS will implement the alternative controls described in the Reference for the management of fatigue during the initial period of 60 days. Near the end of the 60-day period, if the COVID-19 conditions persist at the site affecting staffing requirements and the efforts to maintain CDC, state, and local recommendations related to social distancing, worker screening, and limiting close-proximity work, as well as the particular concern of the COVID-19 challenge in the immediate community of PVNGS, an additional email supplement request may be submitted to extend the 60-day implementation period exemption.
A prior exemption from specific requirements of Title 10 CFR Part 26, Fitness for Duty Programs, Section 26.205, Work hours, was granted to APS on an NRC letter dated April 16, 2020 (ADAMS Accession Number ML20107F835) and expired on June 15, 2020. The NRC exemption approval was in response to an APS letter dated April 14, 2020 (ADAMS Accession Number ML20105A481).
APS requests NRC approval by no later than November 2, 2020, to expedite implementation of the safety benefits of the alternative controls.
APS makes no commitments in this letter. Should you need further information regarding this exemption request, please contact Matthew Kura, Department Leader, Nuclear Regulatory Affairs, at (623) 393-5379.
Sincerely, Weber, Thomas Digitally signed by Weber, Thomas N(Z00499)
DN: cn=Weber, Thomas N(Z00499)
Reason: I am approving this document and N(Z00499) signing for Bruce Rash, APS Engineering VP Date: 2020.10.28 10:53:31 -07'00' BJR/LMW cc: S. A. Morris NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS J. L. Dixon NRC Branch Chief for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS