ML21195A096

From kanterella
Jump to navigation Jump to search
Rhode Island Atomic Energy Commission - Annual Report
ML21195A096
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 07/14/2021
From: Godwin C
State of RI and Providence Plantations, Atomic Energy Commission
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21195A096 (12)


Text

STATE OF RHODE ISLAND Rhode Island Atomic Energy Commission 16 Reactor Road Narragansett,Rl 02882-1165 Telephone# 401-874-2600 July 14, 2021 Docket No. 50-193 Document Control Desk U.S. Nuclear Regulatory Commission (NRC) 11555 Rockville Pike Rockville, Maryland 20852 Attn: Mr. Patrick Boyle, Project Manager

Dear Mr. Boyle:

This letter and the enclosures constitute the annual report required by the RINSC Technical Specifications (Section 6. 7 .1). Enclosure 1 provides reactor operating statistics. Enclosure 2 provides information pertaining to unscheduled reactor shutdowns or scrams. Enclosure 3 discusses maintenance operations performed during the reporting period. Enclosure 4 describes changes to the facility carried out under the conditions of Section 50.59 of Chapter 10 of the Code of Federal Regulations. Lastly, Enclosure 5 summarizes the radiological controls information. If there are any questions regarding this information, please call me at 401-874-9437.

~~

Dr. Cameron Goodwin Director, RINSC Enclosures (5)

Copy to:

Mr. Craig Bassett, USNRC Dr. John J. Breen, Chairman, NRSC Dr. Clinton Chichester, Chairman, RIAEC Dr. Nancy Breen, RIAEC Mr. Howard Chun, RIAEC Dr. Yana K. Reshetnyak, RIAEC

Enclosure 1 Reactor Operating Statistics Technical Specification Section 6.7.1.1 Operating MWH of Month Year Hours Operation July 2020 11.02 13.30 August 2020 8.05 3.80 September 2020 21.35 14.44 October 2020 23.22 21.80 November 2020 3.98 0.74 December 2020 0.0 0.0 January 2021 15.40 11.12 February 2021 40.12 53.17 March 2021 17.22 14.38 April 2021 26.75 30.09 May 2021 17.20 13.16 June 2021 16.62 18.12 194.12 MWH or Total FY2021 200.93 8.09 MWD Total Energy Output Since Initial Criticality 68,303.68 MWH or 2845.99 MWD

ENCLOSURE 2 UNSCHEDULED SHUTDOWNS OR SCRAMS Technical Specification Section 6.7.1.2 Page 1 of 1 The following is a list of the unscheduled shutdowns or scrams that occurred during the 2020-2021 reporting period:

Date Run Log Page Cause Description No. book 8/7/20 9627 65 134 Power Level Power level selector switch was not fully Selector Switch engaged at 2 MW. Reactor scrammed during start-up at 100 kW.

8/20/20 9628 65 135 WR CH2 Range Momentary loss of range selector for WR Selector channel2 2/16/21 9657 66 15 Short period Short period scram due to noise while scram raising SS#2. Reactor was not yet critical.

6/30/21 9688 66 48 Instrument Noise Momentary instrument noise caused scram during start-up.

ENCLOSURE 3 MAINTENANCE OPERATIONS Technical Specification 6.7.1.3 requires a listing of the major maintenance operations performed in the 2020-2021 reporting period including their impact upon the safe operation of the reactor and the reasons for the corrective maintenance.

During a start-up on October 23, 2020, it was noticed that CIC #1 could no longer be compensated properly. After several days of troubleshooting, the detector was removed from the pool and tested. The CIC was internally shorted and needed to be replaced. The CIC detector was replaced along with all of the wiring between the detector and drawer. A 50.59 evaluation was conducted and the reactor was restarted on January 13, 2021.

ENCLOSURE 4 FACILITY CHANGES -10CFR50.59 REVIEW Technical Specification 6.7.1.4 requires that we provide a listing and description of any 10 CFR 50.59 evaluations conducted during the 2020-2021 reporting period.

One 10 CFR 50.59 evaluation was performed in this reporting period. The evaluation addressed the failure and subsequent replacement of the CIC #1 which had internally shorted. The evaluation was reviewed by the Nuclear Reactor Safety Committee prior to resumption of operation.

ENCLOSURE 5 RADIOLOGICAL CONTROLS

1. Environmental Surveys outside the Facility- Technical Specification 6.7.1.6 Quarterly TLD 1 badges are deployed outside the reactor building in three separate locations. The quarterly doses in units of mrem are shown in the table below. The second quarter of year 2021 reports are not available yet due to the vendor's reports delay affected by COVID-19.

2nd QTR 3 rd QTR 4 th QTR 1st QTR 2 nd QTR LOCATION 2020 2020 2020 2021 2021 Northeast Wall 11 13 7 18 No data Demineralizer Door 28 17 12 58 No data Heat Exchanger Door 36 5 11 42 No data The general public does not frequent these locations and therefore occupancy factors may be used to approximate annual dose. The allowable annual external dose for whole body must be below 100 mrem per year. Assuming that the maximum time that a member of the general public would be present in one of these locations is 10 minutes per day, an occupancy factor of 0.025 can be used to obtain the annual dose that would be received by a member of the general public, in any of these areas.

The annual dose at the Northeast Wall, Demineralizer and Heat Exchanger Doors is dependent on the operations schedule of the reactor. Ignoring the fact that the dose rate is not present 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day, and applying the occupancy factor of 0.025 2 , the annual dose that would be receive by an individual in the demineralizer room would be 2.875 mrem. The dose received at the Heat Exchanger Door would be 2.351 mrem.

The annual dose received at the Northeast wall would be 1.225 mrem. The variations from quarter to quarter and from previous reports are also due in part to movements of items within the reactor building during the fiscal year and varying use of the different irradiation facilities.

2. Annual Exposures Exceeding 500 mrem for facility members, 100 mrem for non-staff members or 10 mrem for members of the general public - Technical Specification 6.7.1.7 Two facility member exposures were greater than 500 mrems of extremity shallow dose due to the handling of experiment samples.

1 Thermoluminescent Dosimeter; Mirian Technology reads the dosimeters at minimum of 1 mrem.

2 Occupancy factor of 0.025 was used, from NCRP 147 for Outdoors, unattended parking lots, attics, stairways, unattended elevators, janitor's closets.

3. Radioactive Effluents - Technical Specification 6.7.1.5 A. Individual gaseous effluent concentrations for each reactor operation are recorded on the Monthly Information Sheets (Form NSC-78). The concentration of radioactive materials in the effluent released from the facility exhaust stacks shall not exceed 1E+05 times concentrations specified in 10CFR20, Appendix B, Table 2, when averaged over time periods permitted by 10CFR20. 3 Gamma spectroscopy of stack gas samples has shown that the principal gaseous effluent is Argon-41. The maximum concentration for this principle contaminant permitted under Technical Specifications is 1E-8 µCi/cc x1 E+5 = 1 E-3 µCi/cc.

Average concentrations released during the year were 3.75E-5 µCi/cc and 0.0375 of the limit.

The total Argon-41 release during the reporting period was 52.52 curies. The calculated effective dose equivalent for this release is 2.2 mrem/year (COMPLY Code). The Comply Code report is attached.

B. Liquid effluent concentrations released to the environment are documented on the Sewer Discharge Report (NSC-09). Each release was approved prior to discharge with its pH being within the acceptable range and with the sum of the fractions of the respective radioisotopes per month being below the discharge limit of 1. For the reporting period, the total volume of discharge was 6.237E6 ml. The isotopes and their relative activities discharged are given below.

Radioisotope Total Activity Discharged (microcuries)

H-3 11388.762 C-14 58.94 Pb-214 10.56 Bi-214 15.555 K-40 2.21 3

Technical Specifications, Section 3.7.2.1

2021 Ar41 release COMPLY: V1.7. 7/12/2021 3:12 40 CFR Part 61 National Emission Standards for Hazardous Air Pollutants REPORT ON COMPLIANCE WITH THE CLEAN AIR ACT LIMITS FOR RADIONUCLIDE EMISSIONS FROM THE COMPLY CODE V1.7.

Prepared by:

RI Atomic Energy Commission RI Nuclear Science Center 16 Reactor Road, Narragansett, RI 02882 Sangho Nam 4018749439 Prepared for:

U.S. Environmental Protection Agency Office of Radiation and Indoor Air Washington, DC 20460 Page 1

2021 Ar41 release COMPLY: V1.7. 7/12/2021 3:12 2021 Ar41 release report

SCREENING LEVEL 3

DATA ENTERED:

Release Rate Nuclide (curies/YEAR)

AR41 5.252E+01 Release height 35 meters.

Building height 18 meters.

The source and receptor are not on the same building.

Distance from the source to the receptor is 100 meters.

Building width 18 meters.

Default mean wind speed used (2.0 m/sec).

Distance from the SOURCE to the FARM producing VEGETABLES is 155 meters.

Distance from the SOURCE to the FARM producing MILK and MEAT is 100 meters.

NOTES:

Page 2

2021 Ar41 release Input parameters outside the "normal" range:

None.

RESULTS:

Effective dose equivalent: 2.2 mrem/yr.

      • Comply at level 3.

COMPLY: V1.7. 7/12/2021 3:12 2021 Ar41 release report

SCREENING LEVEL 4

DATA ENTERED:

Building length 20 meters.

STACK DISTANCES, FILE: stack data 100.dat Distance DIR (meters)

N 100.0 NNE 100.0 NE 100.0 ENE 100.0 E 100.0 ESE 100.0 SE 100.0 SSE 100.0 S 100.0 SSW 100.0 SW 100.0 WSW 100.0 W 100.0 WNW 100.0 NW 100.0 NNW 100.0 Page 3

2021 Ar41 release COMPLY: V1.7. 7/12/2021 3:12 WINDROSE DATA, FILE: 2016 windrose data 2m.dat Source of wind rose data: 2016 Windrose data Dates of coverage: 19541994 Wind rose location: Narragansett, RI Distance to facility: 155 m Percent calm: 0.05 Wind Speed FROM Frequency (meters/s)

N 0.062 2.00 NNE 0.058 2.00 NE 0.044 2.00 ENE 0.013 2.00 E 0.012 2.00 ESE 0.013 2.00 SE 0.058 2.00 SSE 0.049 2.00 S 0.058 2.00 SSW 0.084 2.00 SW 0.105 2.00 WSW 0.064 2.00 W 0.068 2.00 WNW 0.095 2.00 NW 0.104 2.00 NNW 0.068 2.00 Distance from the SOURCE to the FARM producing MILK is 100 meters.

Distance from the SOURCE to the FARM producing MEAT is 100 meters.

NOTES:

The receptor exposed to the highest concentration is located 100. meters from the source in the NE sector.

He gets his VEGETABLES from a farm located Page 4

2021 Ar41 release 155. meters from the source in the NE sector.

He gets his MEAT from a farm located 100. meters from the source in the NE sector.

He gets his MILK from a farm located 100. meters from the source in the NE sector.

Input parameters outside the "normal" range:

Windrose wind frequency is unusually LOW.

COMPLY: V1.7. 7/12/2021 3:12 RESULTS:

Effective dose equivalent: 1.1 mrem/yr.

      • Comply at level 4.

This facility is in COMPLIANCE.

It may or may not be EXEMPT from reporting to the EPA.

You may contact your regional EPA office for more information.

                    • END OF COMPLIANCE REPORT **********

Page 5