Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23199A221 | 18 July 2023 | Rhode Island Atomic Energy Commission - Annual Report | |
ML22208A130 | 27 July 2022 | State of Rhode Island, Submittal of Annual Report | COVID-19 |
ML21195A096 | 14 July 2021 | Rhode Island Atomic Energy Commission - Annual Report | COVID-19 |
ML20196L735 | 13 July 2020 | State of Ri, Atomic Energy Commission - Annual Report 2020 | Pandemic COVID-19 |
ML19212A284 | 26 July 2019 | State of Rhode Island and Providence Plantations - Annual Report 2019 | |
ML18219B394 | 7 August 2018 | State of Ri, Atomic Energy Commission, Submittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.7.1) | |
ML17201A005 | 19 July 2017 | Rhode Island Nuclear Science Center - Annual Operating Report, Per Technical Specifications 6.7.1 | Grab sample Fuel cladding |
ML16243A391 | 25 August 2016 | State of Rhode Island and Providence Plantation Rhode Island Atomic Energy Commission, Submittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.8.4) | Fuel cladding |
ML15251A207 | 28 August 2015 | Letter from Constance Hathaway Reactor Operating Statistics | |
ML14258A009 | 29 August 2013 | Rhode Island Atomic Energy Commission - Annual Operating Report | |
ML11234A032 | 28 July 2011 | Rhode Island Atomic Energy Commission Ltr. Enclosing Annual Report Required by Rinsc Technical Specifications (Section 6.8.4) | |
ML102230416 | 30 July 2010 | Rhode Island Atomic Energy Commission Ltr. Enclosing Annual Report Required by Rinsc Technical Specifications (Section 6.8.4) | |
ML100110050 | 31 July 2009 | Submittal of Annual Report Required by Rinsc Technical Specifications (Section 6.8.4) | |
ML072500014 | 27 August 2007 | Transmittal of Annual Report Required by the Rinsc Technical Specifications (Section 6.8.4) | |
ML052550176 | 31 August 2005 | Rhode Island Atomic Energy Commission Annual Report, Required by the Rinsc Technical Specification (Section 6.8.4) | |
ML022600257 | 26 August 2002 | Forward the Annual Report Required by the Rinsc Technical Specifications Re Reactor Operating Statistics |