3F0796-11, Informs That FPC Will Provide Response to Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, by 960915

From kanterella
(Redirected from ML20115F380)
Jump to navigation Jump to search
Informs That FPC Will Provide Response to Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, by 960915
ML20115F380
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/11/1996
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0796-11, 3F796-11, GL-95-07, GL-95-7, NUDOCS 9607170223
Download: ML20115F380 (1)


Text

1 I

Florida Power CORPORATION tkxhstNa E July 11, 1996 l 3F0796-11 U.S. Nuclear Regulatory Commission Attention: Document Control Desk l Washington, D.C. 20555-0001

Subject:

Request for Additional Information on Generic Letter 95-07,

" Pressure Locking and Thermal Binding of Safety-Related Power Operated Gate Valves"

Reference:

A. NRC to FPC letter, 3N0696-04, dated June 13, 1996 B. FPC to NRC letter, 3F0296-06, dated February 9, 1996 l

Dear Sir:

In Reference A the NRC requested additional information on the Florida Power  :

Corporation (FPC) evaluation of pressure locking and thermal binding of safety l related power-operated gate valves at Crystal River Unit 3 (CR-3), as reported in Reference B. FPC has reviewed the questions raised in Reference A, and believes they can be answered to our mutual satisfaction. However, the CR-3 staff is currently responding to several high priority issues, and is hosting an Integrated Performance Assessment Process Inspection. Thus, FPC regrets that due to these other demands on staff resources at this time, we are not able to provide the requested information within the 30 day time limit. FPC will provide ,

the information requested in Reference A by September 15, 1996. I Please contact Brian Gutherman at (352) 563-4566 if you have any questions concerning this submittal.

Sincerely,

. . Beard, Jr.

Sen or Vice President IO 1 Nuclear Operations A AG

PMB/SCP
ff xc: Regional Administrator, Region II NRR Project Manager Senior Resident Inspector 9607170223 960711 PDR ADOCK 05000302 P pon j CRYSTAL FWER ENERGY COMPLEX: 15760 W. Power Une Street . Crystal River, Morida 3442Ek6708 . (352) 7956486 l A Flanda Progress Company l 1G0114

\