Applicant Exhibit A-28,consisting of Re LER 1-92-009-01 Involving Dose Limits Potentially Exceeded from Chemical & Vol Control Sys Valve Diaphragm Leakage Due to Thermally Induced DegradationML20059M607 |
Person / Time |
---|
Site: |
Diablo Canyon |
---|
Issue date: |
08/23/1993 |
---|
From: |
Rueger G PACIFIC GAS & ELECTRIC CO. |
---|
To: |
|
---|
References |
---|
OLA-2-A-028, OLA-2-A-28, NUDOCS 9311190185 |
Download: ML20059M607 (3) |
|
|
---|
Category:EXHIBITS (DOCKETING AND SERVICES BRANCH INFORMATION
MONTHYEARML20059D2431994-01-0707 January 1994 Package of Intervenor Exhibits Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20059M5291993-11-19019 November 1993 Applicant Exhibits A-21,A-22,A-24,A-25,A-26,A-29 & A-F1, Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence IR 05000275/19910041993-08-24024 August 1993 Intervenor Exhibit I-MFP-70,consisting of Insp Rept,Re Rept Numbers 50-275/91-04 & 50-323/91-04,dtd 910304 IR 05000275/19930111993-08-24024 August 1993 Intervenor Exhibit I-MFP-26,consisting of Re Insp Repts 50-275/93-11 & 50-323/93-11 ML20059M7491993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-2,consisting of 920422 Rev 4 to Procedure MP E-57.8 Temp Monitoring ML20059M7521993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-3,consisting of 900227 Rept, Effects of Localized High Temps Upon EQ Components ML20059M7581993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-3A,consisting of 900225 Table Re EQ Devices Affected by Localized High Temperatures ML20059M7601993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-4,consisting of Rev O to MP E-57.8A, Temp Monitoring ML20059C7361993-08-24024 August 1993 Intervenor Exhibit I-MFP-88,consisting of NRC Insp of Diablo Canyon Units 1 & 2 ML20059D0841993-08-24024 August 1993 Intervenor Exhibit I-MFP-139,consisting of Insp Rept Re Dockets 50-275 & 50-323,dtd 920417 IR 05000275/19920131993-08-24024 August 1993 Intervenor Exhibit I-MFP-140,consisting of 920416,mgt Meeting Repts 50-275/92-13 & 50-323/92-13 ML20059D2241993-08-24024 August 1993 Intervenor Exhibit I-MFP-220,consisting of Protest of Util IR 05000275/19910061993-08-24024 August 1993 Intervenor Exhibit I-MFP-71,consisting of Rept of EC W/Util Mgt,Re Rept Numbers 50-275/91-06 & 50-323/91-06,dtd 910411 ML20059D2071993-08-24024 August 1993 Intervenor Exhibit I-MFP-193,consisting of Review of LER 1-90-015-00,re Docket 50-275,dtd 910118 ML20059M8621993-08-24024 August 1993 Intervenor Exhibit I-MFP-35,consisting of Rept, Self- Evaluation of Diablo Canyon Power Plant, Dtd Jul 1993 IR 05000275/19920161993-08-24024 August 1993 Intervenor Exhibit I-MFP-137,consisting of Insp Rept Re Dockets 50-275/92-16 & 50-323/92-16,dtd 920707 ML20059M5041993-08-24024 August 1993 Staff Exhibit S-2,consisting of Re Notice of Violation IR 05000275/19900291993-08-24024 August 1993 Intervenor Exhibit I-MFP-69,consisting of Insp Rept,Re Rept Numbers 50-275/90-29 & 50-323/90-29,dtd 910207 IR 05000275/19920171993-08-24024 August 1993 Intervenor Exhibit I-MFP-102,consisting of Insp Rept Re Dockets 50-275/92-17 & 50-323/92-17,dtd 920508 ML20059M1381993-08-24024 August 1993 Staff Exhibit S-1,consisting of Re 920519 Enforcement Conference IR 05000275/19920261993-08-24024 August 1993 Intervenor Exhibit I-MFP-118,consisting of Notice of Violation & Insp Rept Re Docket 50-275/92-26 & 50-323/93-26,dtd 921113 ML20059D2101993-08-23023 August 1993 Intervenor Exhibit I-MFP-196,consisting of Mgt Summary, DCO-91-MM-N067 D6, Asw Pump Vault Drain Check Valves, 910115 ML20059D1721993-08-23023 August 1993 Intervenor Exhibit I-MFP-168,consisting of Mgt Summary, Ncr DCO-91-EM-N009, FCV 495/496 Corrosion, ML20059D1841993-08-23023 August 1993 Intervenor Exhibit I-MFP-178,consisting of Mgt Summary, Ncr DCO-91-TR-N044, Maintenance Personnel Qualifications, ML20059D2031993-08-23023 August 1993 Intervenor Exhibit I-MFP-192,consisting of LER 1-90-015-01, Re Docket 50-275,dtd 910125 ML20059D1961993-08-23023 August 1993 Intervenor Exhibit I-MFP-191,consisting of Nonconformance Rept & Mgt summary,DCI-90-OP-N083, P-14 ESF Actuation Due to Valve Leakage, ML20059M5251993-08-23023 August 1993 Applicant Exhibit A-23,consisting of Rept DCO-93-TN-N006, DCM Maint & Testing Requirements ML20059M6071993-08-23023 August 1993 Applicant Exhibit A-28,consisting of Re LER 1-92-009-01 Involving Dose Limits Potentially Exceeded from Chemical & Vol Control Sys Valve Diaphragm Leakage Due to Thermally Induced Degradation ML20059D2181993-08-23023 August 1993 Intervenor Exhibit I-MFP-216,consisting of Nonconformance Rept & Mgt Summary DCO-90-SE N080,dtd 920128 ML20059D1871993-08-23023 August 1993 Intervenor Exhibit I-MFP-190,consisting of Mgt Summary, Ncr DC1-91-TN-N002, Backleakage Through Check Valve FW-1-531, ML20059D1821993-08-23023 August 1993 Intervenor Exhibit I-MFP-172,consisting of Mgt Summary, Rev 00,NCR DCO-91-MM-N049, Deg 1-3 Test Cock Valve, 911002 ML20059D2121993-08-23023 August 1993 Intervenor Exhibit I-MFP-210,consisting of Rept, SI-1-8805A, Failed to Cycle on Actuation Signal, ML20059C9651993-08-21021 August 1993 Intervenor Exhibit I-MFP-122,consisting of LER 2-91-007-00, Re Docket 50-323,dtd 911101 ML20059C9431993-08-21021 August 1993 Intervenor Exhibit I-MFP-117,consisting of LER 1-92-022-00, Re Docket 50-275,dtd 921030 ML20059C9571993-08-21021 August 1993 Intervenor Exhibit I-MFP-120,consisting of LER 1-92-013-00, ML20059D0701993-08-21021 August 1993 Intervenor Exhibit I-MFP-138,consisting of Nonconformance Rept, & Rev 00,NCR DC1-92-EM-N010,dtd 920729 ML20059C9871993-08-21021 August 1993 Intervenor Exhibit I-MFP-124,consisting of Technical Review Group Meeting Minutes Distribution, & 920124 DCI-91-TI-N047, Reactor Trip Due to Personnel Error & Safety Injection Due to Leaking Steam Dump Valves ML20059M5191993-08-21021 August 1993 Applicant Exhibit A-22,consisting of Responding to Violations Noted in Insp Repts 50-275/92-26 & 50-323/92-26 ML20059C9981993-08-21021 August 1993 Intervenor Exhibit I-MFP-127,consisting of LER 2-91-007-00, Re Docket 50-323,dtd 911101 ML20059C9901993-08-21021 August 1993 Intervenor Exhibit I-MFP-126,consisting of 911030, DC2-91-TI-N088 D2, Inadvertent SI Due to Personnel Error ML20059C9631993-08-21021 August 1993 Intervenor Exhibit I-MFP-121,consisting of 910503, Ncr DC1-OP-N038, Diesel Generator Start & Valve Actuation Due to Personnel Error, Mgt Summary ML20059C9841993-08-21021 August 1993 Intervenor Exhibit I-MFP-123,consisting of LER 1-91-009-00, Re Docket 50-275,dtd 910617 ML20059M5941993-08-21021 August 1993 Applicant Exhibit A-27,consisting of Responding to Violations Noted in Insp Repts 50-275/92-16 & 50-323/92-16 ML20059D0531993-08-21021 August 1993 Intervenor Exhibit I-MFP-136,consisting of Ncr DC1-MM-N028, Unit 1 Loss of Offsite Power - 910307, ML20059D1591993-08-21021 August 1993 Intervenor Exhibit I-MFP-154,consisting of LER 1-92-004-00, Re Docket 50-275,dtd 920520 ML20059D1301993-08-21021 August 1993 Intervenor Exhibit I-MFP-149,consisting of LER 1-91-006-00, Re Docket 50-275,dtd 910425 ML20059D0081993-08-21021 August 1993 Intervenor Exhibit I-MFP-129,consisting of LER 1-92-010-00, Re Dockets 50-275 & 50-323,dtd 921015 ML20059D1671993-08-21021 August 1993 Intervenor Exhibit I-MFP-155,consisting of LER 1-91-002-01, Re Docket 50-275,dtd 910517 ML20059D1461993-08-21021 August 1993 Intervenor Exhibit I-MFP-150A,consisting of Mgt Summary, Ncr DC1-90-WP-N093, Inadvertent Ground Causes CVI, ML20059D1421993-08-21021 August 1993 Intervenor Exhibit I-MFP-150,consisting of LER 1-90-019-00, Re Docket 50-275,dtd 910128 1994-01-07
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARDCL-99-123, Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations1999-09-20020 September 1999 Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations ML20205N4081999-04-14014 April 1999 Comments Opposing Proposed Rules 10CFR2,19 & 20 Re Proposed Repository at Yucca Mountain.Requests Information on How Much Radiation Being Released Now at Diablo & Hanford NPPs ML20205N4601999-03-21021 March 1999 Introduces K Schumann as Representative of Nuclear Waste Committee (Nuwic) of San Lius Obispo County.Informs That Nuwic & Nuclear Waste Management Committee Concerned with Transportation of Spent Nuclear Fuel Rods from Dcnpp ML20195E8841998-11-24024 November 1998 Petition for Mod to OLs to Require Plant Owner to Have Independent Contractor Evaluate Plant Safety Culture ML20236T3011998-07-24024 July 1998 Order Prohibiting Involvement in NRC Licensed Avtivities (Effective Immediately).Lh Brooks Prohibited for 5 Yrs from Date of Order from Engaging in NRC Licensed Activities ML20248C2261998-05-22022 May 1998 Comment Opposing Revised Proposed Rule 10CFR50 Re Protection & Safety Sys ML20129J4191996-10-18018 October 1996 Order Approving Application Re Corporate Restructuring of Pacific Gas & Electric Company by Establishment of Holding Company DCL-95-206, Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations1995-10-0606 October 1995 Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations ML20091P8721995-08-23023 August 1995 Comment Opposing Petition for Rulemaking PRM-50-61 Re Nuclear Energy Institute Proposed Amends on Fire Safety for All NPPs DCL-95-001, Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments1995-01-0303 January 1995 Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments ML20077M7521994-12-30030 December 1994 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors DCL-94-270, Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal1994-12-0808 December 1994 Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal ML20149H0851994-11-0404 November 1994 Initial Decision (Construction Period Recovery/Recapture).* Renewed Motion to Reopen Record 940808,denied.Served on 941104.W/Certificate of Svc ML20072L2651994-08-23023 August 1994 PG&E Opposition to San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record.* Util Opposes San Luis Obispo for Peace Motion Based on Affidavit Stating No Evidence Found in Motion Re Flaw in Program.W/Certificate of Svc ML20072F0291994-08-12012 August 1994 Erratum to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Intervenors Corrects Error in Renewed Motion to Reopen Record Re Application for License Amend to Extend Term of Operating License for Plant.W/Certificate of Svc ML20072B2651994-08-0909 August 1994 Comment Supporting Proposed Rule 10CFR26 Re FFD Requirements Concerning Random Drug Testing ML20072A5821994-08-0808 August 1994 San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record Re PG&E Application for Amend to Extend Term of OL for Plant.* Motion to Reopen Record to Introduce Insp Rept Identifying Alleged Problems W/Plant.W/Certificate of Svc ML20071L2061994-07-26026 July 1994 Comment Supporting Proposed Rule 10CFR26 Re Changing Current Drug Testing Policies to Exclude All Personnel in nonsafety-related Positions ML20072B8481994-07-26026 July 1994 Comment Opposing Proposed Rule 10CFR26 Re Changes to FFD Requirements Concerning Random Drug Testing ML20071L1901994-07-20020 July 1994 Comments on Proposed Rule 10CFR26 Re Relaxing Rule on Drug Testing of Employees Working at NPP DCL-94-134, Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program DCL-94-135, Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs ML20064D1791994-03-0707 March 1994 Pacific Gas and Electric Co Reply in Opposition to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Motion to Reopen Record Denied.W/Certificate of Svc ML20064D1961994-03-0404 March 1994 Affidavit of Mj Angus Re Motion to Reopen Record ML20063L5721994-02-25025 February 1994 San Luis Obispo Mothers for Peace Re Util Application for License Amend to Extend Term of Operating License for Plant.* Advises That Record of Proceeding Should Be Reopened to Consider Insp 93-36 Re Util Surveillance of Asw Sys DCL-94-021, Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation1994-01-26026 January 1994 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation ML20059D2431994-01-0707 January 1994 Package of Intervenor Exhibits Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20062N0001993-12-30030 December 1993 PG&E Reply Findings of Fact & Conclusions of Law.* Mothers for Peace Proposed Findings & Conclusions Do Not Provide Any Supportable Rationale to Change Findings & Conclusions Previously Proposed by Pg&E.W/Certificate of Svc ML20058P3931993-12-22022 December 1993 NRC Staff Findings of Fact & Conclusions of Law in Form of Initial Decision.* Certificate of Svc ML20058K7491993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Board Has Extended Filing Time for Util Until 931230.W/Certificate of Svc. Served on 931206.Granted for Board on 931203 ML20058K8771993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Requests That Board Extend Date for Staff to File Findings Until 931222. W/Certificate of Svc ML20059M5291993-11-19019 November 1993 Applicant Exhibits A-21,A-22,A-24,A-25,A-26,A-29 & A-F1, Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20058E0741993-11-19019 November 1993 San Luis Obispo Mothers for Peace Proposed Findings of Fact & Conclusions of Law Re Licensee Application for License Amend to Extend Term of Operating License for Plant.* W/ Certificate of Svc ML20059E8931993-10-28028 October 1993 Memorandum & Order (Motion for Extension of Time).* San Luis Obispo Mothers for Peace 931018 Request for two-wk Extension of Time to File Proposed Findings of Fact & Conclusions of Law Granted.W/Certificate of Svc.Served on 931029 ML20059E8531993-10-27027 October 1993 NRC Staff Response to Board Memorandum & Order Re Extension of Time.* Staff Believes That San Luis Obispo Mothers for Peace Has Shown No Good Cause for Requesting Extension to File Proposed Findings of Fact.W/Certificate of Svc ML20059E8631993-10-25025 October 1993 Pacific Gas & Electric Co Response to Motion for Extension of Time.* Util Does Not Agree W/Board Assessment That Mothers for Peace Request Appears to Be Reasonable But Will Not Oppose Request.W/Certificate of Svc ML20059B2191993-10-19019 October 1993 Memorandum & Order (Responses to Motion for Extension of Time).* Board Believes Intervenor Request for Extension of Time to File Proposed Findings of Fact Appears Reasonable. W/Certificate of Svc.Served on 931019 ML20059B1071993-10-18018 October 1993 San Luis Obispo Mothers for Peace Motion for Extension of Time for Filing Proposing Findings of Fact & Conclusions of Law.* Requests Extension of Two Wks or Until 931119 to File Proposed Findings of Fact.W/Certificate of Svc ML20057D0531993-09-23023 September 1993 Notice of Appearance.* Notice Given That Undersigned Attorney Enters Appearance in Listed Matter & Listed Info Provided.W/Certificate of Svc ML20057B0401993-09-14014 September 1993 NRC Staff Reply to PG&E Response to Staff Motion to Amend Protective Order.* NRC Staff Moves Board to Adopt Language Requested in 930817 Motion as Stated.W/Certificate of Svc ML20056G4891993-08-30030 August 1993 Pacific Gas & Electric Co Response to Motion to Amend Protective Order.* Staff Asks That Protective Order Be Clarified by Adding New Footnote to Paragraph 3 of Order. W/Certificate of Svc ML20059C7361993-08-24024 August 1993 Intervenor Exhibit I-MFP-88,consisting of NRC Insp of Diablo Canyon Units 1 & 2 IR 05000275/19920161993-08-24024 August 1993 Intervenor Exhibit I-MFP-137,consisting of Insp Rept Re Dockets 50-275/92-16 & 50-323/92-16,dtd 920707 IR 05000275/19930111993-08-24024 August 1993 Intervenor Exhibit I-MFP-26,consisting of Re Insp Repts 50-275/93-11 & 50-323/93-11 ML20059M1381993-08-24024 August 1993 Staff Exhibit S-1,consisting of Re 920519 Enforcement Conference IR 05000275/19920131993-08-24024 August 1993 Intervenor Exhibit I-MFP-140,consisting of 920416,mgt Meeting Repts 50-275/92-13 & 50-323/92-13 ML20059D0841993-08-24024 August 1993 Intervenor Exhibit I-MFP-139,consisting of Insp Rept Re Dockets 50-275 & 50-323,dtd 920417 IR 05000275/19920261993-08-24024 August 1993 Intervenor Exhibit I-MFP-118,consisting of Notice of Violation & Insp Rept Re Docket 50-275/92-26 & 50-323/93-26,dtd 921113 ML20059M5041993-08-24024 August 1993 Staff Exhibit S-2,consisting of Re Notice of Violation ML20059M8621993-08-24024 August 1993 Intervenor Exhibit I-MFP-35,consisting of Rept, Self- Evaluation of Diablo Canyon Power Plant, Dtd Jul 1993 1999-09-20
[Table view] |
Text
~-
i 6$- 2 75l333 -DLA 2 0~E S sj B3 DameFm CW$ g' g
,.* Pacific Gas and Electric Company 77 Beale Street .Gregoryy. uegerf
- San Francisco, CA94106 -Setupf&ce President and ,
GeneralManager 201951 415/973-4684 Nuclear Power Generation '
! '93 Oc128 P 6 25 January 11, 1993 l
PG&E Letter No. DCL-93-006 Q YM U.S. Nuclear Regulatory Commission ATTN: Document Control Desk l Washington, D.C. 20555 Re: Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit I Licensee Event Report 1-92-009-01 ,
l Dose Limits Potentially Exceeded from Chemical and Volume Control System Valve Diaphragm Leakage Due to Thermally Induced Degradation Gentlemen:
Pursuant to 10 CFR 50.73 (a)(2)(ii)(B), PG&E is submitting the enclosed revision to Licensee Event Report (LER) 1-92-009-00 regarding identified l
leakage through a valve diaphragm that could have resulted in the control room and offsite dose limits being exceeded during the design-basis recirculation phase of a loss-of-coolant accident. This revision is being submitted to report the root cause and corrective actions, and supercedes the previous LER in its entirety.
This event has in no way affected the health and safety of the public.
Sincerely, s wy Grego y M. Rueger cc: Ann P. Hodgdon John B. Martin Mary H. Miller Sheri R. Peterson CPUC Diablo Distribution INPO DC2-91-TN-N087 p.- . . l NuctrAn ntautATORY COMMitst0N Enclosure
%ket no. 50-Q 96-a LA oMust ftfc7Ric' _Cp_
ns,. no. h6 E'b !
l inm.u,aPk/p/c.G6 1069S/85K/JCN/2246 __
_IDENTlHED n:L _ _ . _
S vt . _ _ _._ _. m mvro # ~ , _ _ . _
1WaW , _ _
. R2 nCILD 3:: p CATE_ b
"' ~
~
9311190185 930823'~ s
,Nk hfy/
ADOCK 05 -
{DR
,,_m.ma.
- ~n-LICENSEE EVENT REPORT (LER) 2D17$1 9 s
F AcauTY N AME (1) DOCKET NuMS 175 (2) PAG F (31 6 DIABLO CANYON UNIT I 0l5l0 0l0l2l7l5 1 'l 6 mum DOSE LIMITS POTENTIALLY EXCEEDED FROM CHEMICAL AND VOLUME CONTROL SYSTEM VALVE DIAPHRAGM LEAKAGE DUE TO THERMALLY INDUCE 0 DEGRADATION EVENT DATE (El UR NUMS&R IS) REPORT DATE (7) OTHER F ACILITIES INVOLVED (0)
MON DAT TR YM SEQUENT 1AL REVl800N MON DAY YM DOCKET NUhmm (St NuMBaR NuMBaR 0 5 0 0 0 f
06 22 92 92 -
0l0l9 -
0l1 01 11 93 0 5 0 0 0 gc, Tnts RCPORT 15 SUBMITTED PUR$UANT TO THE REQUIREMENTS OF 10 CFR (11) 1 L r X 10 CFR 50.73f a)(2)fI()(B)
"")
1l0l0 OTHER -
(spectfy in Abstr ict betow and in text, NRC Form 366A)
UCENSEE CONT ACT FOR Tles Lam (12)
T[Lf 9 HOP E NUMBER DAVID P. SISK, SENIOR REGULATORY COMPLIANCE ENGINEER ^"
805 545-4420 l
caust susitm Cce<pONENT nagrAC. R gE A CAUSC ST5f(M COMPONENT FAC. R A E X FlE TlHl l Tl1l 8l 5 N l lll lll l
l lll lll l lll llI"*""
SurruMENT AL RtroRT ExrscTEn ties D^' ""'
EXPECTED SUBMISSION l l TES (if yes, Conplete EXPECTED SUBNISSION DATE) DATE W lX l NO assinACT (16)
On June 26, 1992, with Unit 1 in Mode 1 (Power Operation) at 100 percent power, PG&E i determined that identified leakage from the chemical and volume control system (CVCS) could potentially cause design-basis dose limits to be, exceeded during the recirculation phase of a loss-of-coolant accident (LOCA). A one-hour, non-emergency report was made to the NRC in accordance with 10 CFR 50.72 (b)(1)(ii)(B) on June 26, 1992, at 1549 PDT.
~ ~
On June 22, 1992, diaphragm valve CVCS-1-547, the emergency borate flow to the volume control tank outlet isolation, was found to be leaking approximately 0.5 gallon per l minute. This leakage could have caused 10 CFR 100 and GDC 19 dose limits to be exceeded during a design-basis LOCA.
The root cause of the leakage has been determined to be thermally-induced premature degradation of the valve diaphragm caused by a malfunctioning heat trace controller, resulting in distortion of the diaphragm at the body-to-bonnet joint and breaching of the system pressure boundary.
During the Unit I fifth refueling outage, the valve bonnet and diaphragm of CVCS 547, as well as the heat trace controllers, were replaced to return the valve to an acceptable configuration. All heat-traced diaphragm valves in the post-LOCA recirculation flow path were inspected and reconfigured as necessary.
1069S/85K
' LICENSEE EVENT REPORT (LER) TEXT CONTINUATION .MM -
2 .
par.c (3) rcesLity nAME (a) oocrti eninsta (z) tra uvusta is)
DIABLO CANYON UNIT 1 0l5l 0 l0l 0l 2 l 7 l 5 92 -
0l0l9 -l0l1 2 l 'l 6 i 5
nu tm i I. Plant Conditions Unit I was in Mode 1 (Power Operation) at 100 percent power.
l II. Description of Event A. Summary:
i On June 22, 1992, diaphragm valve CVCS-1-547 (CB)(V), the emergency borate flow to the volume control tank (VCT)(CB)(TK) outlet isolation in the chemical and volume control system (CVCS)(CB), was found to be leaking approximately 0.5 gallons per minute (gpm) to the auxiliary building (NF) atmosphere.
4 On June 26, 1992, PG&E determined that identified leakage from the CVCS ,
i could potentially cause design-basis dose limits to be exceeded during 4 the recirculation phase of a loss-of-coolant accident (LOCA). A one-hour, non-emergency report was made to the NRC in accordance with 10 CFR
~
50.72(b)(1)(ii)(B) on June 26, 1992, at 1549 PDT.
, B.
Background:
l Leakage from the post-LOCA recirculation flow path must be limited to meet design-basis dose limits. As specified in the Final Safety Analysis Report (FSAR) Update, the maximum permissible leakage outside of containment from the post-LOCA recirculation loop, while pressurized to post-LOCA pressure, is 0.10 gpm in areas where the plant ventilation j exhaust is not filtered by charcoal filters (VF)(FLT) and 0.94 gpm when filtered through charcoal filters (in addition to a postulated residual
]' heat removal pump seal (BP)(SEAL) leakage of 50 gpm).
i CVCS-1-547 is located in the boric acid blender (CB)(MIX) room on the 100 foot elevation of the auxiliary building. The boric acid blender room ventilation (VF) exhausts to the plant vent (VL) without passing through charcoal filters. Therefore, any radioactive mater 41 that may be released as a result of leakage in this area would be released to the plant vent, which is filtered only by high efficiency particulate air
- (HEPA) filters (VF)(FLT).
CVCS-1-547 is a manually operated diaphragm valve in the CVCS system.
l During power operation, this valve normally remains in the'open position j with system pressure at approximately 23 pounds per square inch, gauge (psig). This valve does not have'a safety function to close'during either normal or accident conditions. However, this valve does become pressurized as part of the reactor coolant (AB) flow path pressure
~
i boundary during the recirculation phase of a LOCA.
1 4
This valve also forms part of the flow path for emergency boration.
l Because the dissolved boron present in the water will precipitate out of 10695/85K
~
~ -
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION 3$$,N[ ,
FACILITY NAMC (1) DOCKET NLM8(R (2) if R NLM6fD i 6) PAGE (3) l DIABLO CANYON UNIT 1 0l 5 l 0 l 010 l 2 l 7 l 5 92 -
0l0l9 -1 0l1 3 l 'l 6 f(AT (37) solution at low temperatures, electric heat trace circuitry (FE) is installed to maintain the temperature of lines above 145 F as required by Technical Specifications 3.5.4.2 and 4.1.2.2. Heat tracing is not installed on the bonnet of CVCS-1-547 to minimize any valve diaphragm degradation due to excessive heat.
C. Event
Description:
On June 22, 1992, the VCT and centrifugal charging pump (CB)(P) header, including CVCS-1-547, were pressurized to approximately 55 psig. This system condition was the result of maintenance unrelated to CVCS-1-547.
Such an evolution is unusual but not outside the allowable CVCS ,
operational limits. The VCT is normally pressurized to approximately 23 psig.
On June 22, 1992, during a routine radiation survey, diaphragm alve CVCS-1-547 was found to be leaking to the room drain at the rate of approximately 0.5 gpm. No boric acid crystals were present, which indicated that the valve had not been leaking for an extended period of time.
The valve bonnet retaining nuts were determined to be " finger-tight" and retorquing the nuts stopped the leakage. The as-left torque on the nuts was in accordance with the valve supplier's requirements.
Investigation determined that the bonnet temperature of CVCS-1-547 was approximately 304 F. No estimate of the time the valve had been at this temperature could be made.
Information from the valve vendor (ITT) indicated that the qualified operating limits for the valve diaphragm are 100 psig at 300 F, 175 psig at 250'F and 235 psig at 200'F.
Therefore, the as-found condition was in excess of the vendor-recommended limits. No other CVCS diaphragm . 1ves had a measured body temperature over 200 F.
l l'
On June 26, 1992, an evaluation determir.ed that the leakage from CVCS 547 could have resulted in the control room (NA) and exclusion area boundary 10 CFR 100 thyroid dose limits being exceeded during the recirculation phase of recovery from a design-basis LOCA. A one-hour, non-emergency report was made for Unit 1 in accordance with 10 CFR 50.72 (b)(1)(ii)(B) at 1549 PDT.
During the Unit 1 fifth refueling outage (IR5), which started on September 12, 1992, and ended on November 11, 1992, the valve bonnet and diaphragm of valve CVCS-1-547, as well as the heat trace controllers (FE)(TH), were replaced to return the valve to an acceptable configuration. All heat-traced diaphragm valves in the post-LOCA recirculation flow path were inspected and reconfigured as necessary.
)i 10695/85K !
1
l ..
l LICENSEF EVENT REPCRT (LER) TEXT CONTINUATION MM'4 l 4 tra numsta - s) east (3)
- FACILITY W (1) oocs:sf mmsta (a)
T =
l DIABLO CANYON UNIT 1 0l5l0l0l0l2l7l5 92 -
0l0l9 -
0l1 4l"l6 I
7tXT (17)
D. Inoperable Structures, Components, or Systems that Contributed to the Event:
None.
E. Dates and Approximate Times for Major Occurrences:
- 1. June 22, 1992: Event date. CVCS-1-547 was found to be leaking approximately 0.5 gpm.
- 2. June 26, 1992: Discovery date. Investigation identified that the leakage condition could have resulted in exceeding dose limits. A one-hour, non-emergency report was made to the NRC in ,
accordance with 10 CFR 50.72(b)(1)(ii)(B).
- 3. July 1, 1992
- A leak repair enclosure was installed on CVCS l 547 to provide system pressure boundary l
integrity until valve repairs could be i
performed.
l 4. November 4, 1992: Unit I entered Mode 4 (Hot Shutdown) with CVCS-1-547 operational.
F. Other Systems or Secondary Functions Affected:
None.
G. Method of Discovery:
The leakage was discovered by radiation protection personnel during the l
performance of a routine radiation survey.
H. Operator Actions:
An operator retorqued the body-to-bonnet nuts on CVCS-1-547 and stopped the leak.
I. Safety System Responses:
None.
III. Cause of the Event A. Immediate Cause:
CVCS-1-547 had a body-to-bonnet leak exceeding the maximum permissible leakage for unfiltered plant effluent. '
1069S/85K
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION g@7Qt t
g un,- m -an u m u.
- r. .>
. .. m
/
4 4
DIABLO CANYON UNIT I trur (17) 0l5l0l0l0l2l7l5 92 -
0l0l9 -
0l1 5 l"l 6 1
B. Root Cause:
Although heat tracing is not installed on the bonnet of CVCS-1-547, the valve had insulation installed. The heat trace controller (thermostat) for this segment of system piping is not at CVCS-1-547. The physical arrangement of the piping at CVCS-1-547 resulted. in heat accumulation at the valve, as evidenced by measured valve body temperature.
Investigation determined that the heat trace controller for CVCS-1-5,,
was not turning off. ,
Although the vendor's qualification for the valve diaphragm temperature was only slightly exceeded, the root cause of the leakage was thermally induced degradation of the CVCS-1-547 diaphragm caused by the heat trace controller for the valve not turning off, resulting in valve diaphragm distortion and breaching of the system pressure boundary.
IV. Analysis of the Event The leakage from CVCS-1-547 was estimated to be approximaHy 0.5 gpm.
However, this leakage was occurring with the system pressure at approximately 55 psig. Under post-LOCA conditions, the system pressure at this valve would be approximately 200 psig. The equivalent leakage under post-LOCA conditions-is postulated to be approximately 9.0 gpm.
A leak of 9.0 gpm in the auxiliary building, filtered only by HEPA filters, could potentially have resulted in control room operator dose exceeding the 10 CFR 50 Appendix A General Design Criterion 19 thyroid limit over the 30-day duration of the design-basis LOCa.
However, post-LOCA emergency response procedures provide for use of self-contained breathing apparatus would mitigate control room ope (SCBAs)-and rator potassium iodide prophylaxis, which dose. Control room rJiation conditions would be monitored by area radiation monitors (IL)(MON) located in the control room. Although the monitors are design Class II, they are powered from Class IE power supplies (IL)(JX). The area radiation monitors would provide sufficient indication to allow control room operators to don SCBA equipment or take additional corrective measures.
A leak of 9.0 gpm from the auxiliary building, filtered only by the HEPA filters, could potentially have resulted in exceeding the 10 CFR 100 2-hour site boundary thyroid dose limit.
However, a design-basis LOCA dose analysis contains many conservative assumptions, damage). particularly with regards to the source term (i.e., fuel Therefore, an analysis was performed using " expected case" LOCA assumptions (no fuel damage). The analysis determined that a 9.0 gpm leak would result in 2-hour site boundary and low population zone doses significantly less than the 10 CFR 100 limit of 300 rem.
10695/85K
U UCENSEE EVENT REPORT (LER) TEXT CONTINUATION Mf58. -
coctri nuMeta (r) tra nuMata i s) paec (3)
FActuvr naME (1) t
_ g ,
DIABLO CANYON UNIT 1 0l5l0l0l0l2l7l5 92 -
0l0l9 -
0l1 6 l 'l 6 TEXT (27)
I Therefore, this event did not adversely affect the health and safety of the l
public. r l
l V. Corrective Actions i
A. Immediate Corrective Actions:
- 1. Personnel tightened the L..'y-to-bannet nuts on the valve, which stopped the leakage.
- 2. A leak repair enclosure was installed on CVCS-1-547.
l l B. Corrective Actions to Prevent Recurrence:
- 1. PG&E will document the heat trace program implementation (i.e.,
that thermostats are appropriateiy located and components and j piping are at a temperature between 70 and 170'F).
- 2. PG&E replaced the bonnet and diaphragm of CVCS-1-547 during 1R5.
I
- 3. PG&E has set the temperature on the piping immediately adjacent to CVCS-1-547 to between 70 and 170*F following replacement of the heat trace controllers during 1R5.
- 4. PG&E has established acceptable body / bonnet surface temperatures on all diaphragm valves that are in heat-traced systems, including the post-LOCA recirculation flow path.
VI. Additional Information A. Failed Components:
Heat Trace Temperature Controller, Thermon Manufacturing Co., Type FP l Thermon Econtrace, 120 vac.
B. Previous LERs on Similar Events:
LER 2-91-009-01, "10 CFR 100 Dose Limits Potentially Exceeded in the Event of a Design Basis Loss of Coolant Accident Recovery as a Result of Valve Leakage" This previous LER was also caused by leakage from diaphragm valves in the post-LOCA flow path. The root cause was that one of the valves and -
certain vendor recommendations were not included in the preventive maintenance program. Because the scope of previous corrective actions did not include heat tracing on diaphragm valves in the post-LOCA flow path, the corrective actions could not have prevented the current LER.
10695/85K
.