LER 79-088/03L-0:on 790807,supply Breaker for Essential Unit Substation Bus F1 Tripped de-energizing Bus.Caused by Electrical Fault in Baat Room Heater,Instituting Operation of Neutral Overcurrent Device
ML19207C054
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/30/1979
From: Naylor R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19207C042 List:
References
33-79-102, LER-79-088-03L, LER-79-88-3L, NUDOCS 7909060377
Download: ML19207C054 (3)


Text

U. S. NUCLEAR REGULATORY COMMISSION NRC FORM 366 (7-77)

  • LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

CONTROL BLOCK: l 1

l l l l l lh 6

l0l1l 0lHlD BlSl1l@!0l0 - l 0 l0 N lP F - l 0 l 3 l@l 4 1l1l1l1 @lbl L Al I Sdl@ .10 14 15 LICENSE NUYciEH 25 2ti LICENSE T YPE 7 8 9 LICENSEE CODE CON'T 7

0 1 8

5OfRN l L @[ 0 l 5 l 0 l - l 0 l 3 l 4 l 6 @l 0 l 8 l 0 l7 l 7REPORT 00 61 DOCM ET NUVS ER 66 b) EVENT D ATE 74 75 l9 @l DATE 0 ] 8 ] 3l 0 ] 7 6J EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h Io l2] On 8/5/79, at 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> the supply breaker for essential unit substation bus "Fl" l 3 l tripped, de-energizing the bus. This placed the unit in the Action Statement of T.S. l

} o o 14 i l 3.8.2.1 which requires the operability of all essential AC busses in Modes 1, 2, 3, l s land 4. While selectively reloading the bus to determine the location of the fault, l o

~

o 6 l the supply breaker acain tripped on overcurrent at 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> when the breaker supplv-j o 7 l ing the Boric Acid Addition Tank (BAAT) room heaters was reclosed. There was no danger.

o a lThe redundant essential bus "E1" was operable. (NP-33-79-102) l 80 7 8 9 COYP. VALVE SYSTEM CAUSE CAUSE CODE COOE SUBCODE COYPONENT CODE SUBCODE SUBCODE o 9 l El B j@ lE @ l Al@ l E l L l E C[0lN @ ] Z l@ l Z l @ 16 la

.u 7 8 9 10 11 1.' 12 OCCURRENCE REPORT REVISION SEQUENTI AL REPORT NO. CODE TYPE NO.

LER RO EVENT YEAR

@ RE l7 l9 l

,_ 21 2.

l-l 23 24 0l8 8l ab l/l 27 l 0l 3 l 28 2') JJ Ll l_l 31

{

32 ATT AC HY E N T NPRD4 PR1YE COYp. CCVPONENT ACTION FUTLRE EFFECT SH UT DO /. .

FORMsu& SU Pp LI E R MANUFACTURER TAKEN ACTION ON PL A*.T YETHOC HOURS SU B *.*l T T E D I33B lgl34Fl@ yg lZ [@ 3 l 0] 0l 0 40 l l YlQ 43 l Nlg l Al@

42 43 44 Cl3l3l2l@ 47 33 A CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i o l Bus "Fl" was stripoed and re-energized at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, removing the unit from the Actioq

~

i i Statement. After re-entering the Action Statement at 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br />, the bus was re-  !

1, [ 2 l l energized at 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br /> on August 5, 1979, removing the unit from the Action Statement 4 i 3 l The problem with the BAAT room besters will be corrected under Maintenance Work Order l

[il4l]79-2734. Ground fault protection on the individual 480 VAC MCCs will be installed. 80 l

7 8 9 STA S  % POW E R OTHER STATUS ISCOV RY DISCOVERY DESCRtPTION i 5 Wh l1 l 0 l0 hl NA l Al@lOperatorobservation l ACTIVITY CO TENT RELEASED OF RE LE ASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE l NA l1 l6 l d h Wh 7 8 9 10 it NA 44 l

45 80 l

PERSONNEL EXPOSURES NUURER TYPE C E SC RIPTION l

li l 71 I el d l 0 @l Z @l13 NA 80 7 8 9 11 12 PERSONNE L INJURIES NUY9ER DESCRIPTION

,.liIsl101olo@) NA 80 g

7 8 9 1i 12 LOSS OF OR DAM AGE TO F ACILITY f, t 'g Y iO TYPE DESCRIPTION '" l l1 l9l 7 8 9 l Zlh io NA 80 1

PU B L ICI T Y NRC USE CNLY ISS J E n DE SCHIP TION dd "' l 1111 lilll1IlI -

'" 69 ao a e s io Richard U. Navlor 7909060 VPHONE. 7 419-259-5000, Ext. 294 DVR 79-124 &l2a*E OF PREPARER

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POUER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-lC2 DATE OF EVENT: August 5, 1979 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Overcurrent fault tripping on the neutral of essen-tial unit substation bus "Fl" Conditions Prior to Occurrence: The unit was in Mode 1, with Power (MWT) = 2772, and Load (Gross MWE) = 914 Description of Occurrence: On August 5, 1979, at 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> essential unit substation bus "Fl" supply breaker tripped, de-energizing "Fl" bus. This placed the unit in the Action Statement of Technical Specification 3.8.2.1 which requires all essential AC electrical busses operable in Modes 1, 2, 3, and 4. The Action Statement requires the inoperable bus be re-energized within eight Sours or the unit be in hot standby within the next six hours. "F1" bus uas stripped and re-energized at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, removing the unit from the Action Statement. The bus was selectively reloaded to determine the source of the f ault.

At 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> when operations personnel reclosed the boric acid addition tank (BAAT) room heaters supply breaker BR1315 on MCCF13, the c"ercurrent trip recurred. This again placed the unit in the Action Statement of Technical Specification 3.8.2.1.

Bus "Fl" was re-energized at 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br /> removing the unit f rom the Action Statement.

The breaker to the BAAT room heater, BF1315, was left de-energized and was tagged to prevent operation of the breaker until the fault was repaired.

Designation of Anparent Cause of Occurrence: The cause of this occurrence was an electrical f ault in the BAAT room heater which caused tF neutral overcurrent device to operate and trip the supply breaker to "Fl" bus, de t rgizing "Fl" bus. This occurred because there is no ground fault protection on the 480 V AC motor control centers (MCC). Any ground fault on the low voltage side of the unit substation will cause the neutral overcurrent device to actuate and trip the substation supply breaker. This condition was previously identified as a potential problem and Faci-lity Change Request (FCR)79-223 was written on June 24, 1979. This FCR would install ground fault protection at the MCC supply breakers to prevent loss of a substation due to a ground on downstream loads.

Analysis cf Occurrence: There was no danger to the health and safety of the public or to station personnel. The redundant essential bus "El" was operable throughout the occurrence. "Fl" bus was de-energized for a period of 15 minutes at 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> and for 5 minutes at 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br />.

LER #79-088 cet .: ("? ^

sf A *J

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE PAGE 2 SUPPLEMENTAL INFORMATION FOR LER NP-33-79-102 Corrective Action: On August 5, 1979, Maintenance Uork Order (MWO) 79-2734 was written to correct the problem with the BAAT room beaters. Supplemental work orders were issued to inspect and test the supply breakers to F13 and the BAAT room heaters to assure proper operation. The breakers tested properly and no defi-ciencies were f ound.

Installation of ground fault protection on the feeder breakers to individual 480 V AC MCCs will be accomplished per FCR 79-223. This FCR is presently in the design engineering stage and is scheduled to be completed during the March 1980 refueling outage.

Failure Data: There have been two previously reported occurrences of essential busses tripoing because of ground f aults; see Licensee Event Reports NP-33-77-48 and NP-33-79-13.

LER #79-088

  • k -