MONTHYEARNOC-AE-240040, Inservice Inspection Summary Report - 2RE232024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23044A6192023-02-13013 February 2023 Summary Report for Inservice Inspection (2RE22) Completed in November 2022 ML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 ML21196A4922021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval ML21144A1092021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval ML20303A2602020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20281A8542020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20191A2702020-07-0909 July 2020 Inservice Inspection Summary Report -1RE22 NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) NOC-AE-19003624, Inservice Inspection Summary Report- 1RE212019-02-0707 February 2019 Inservice Inspection Summary Report- 1RE21 NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing2018-10-18018 October 2018 Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-18003587, Inservice Inspection Summary Report -2RE192018-07-25025 July 2018 Inservice Inspection Summary Report -2RE19 NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE202017-07-20020 July 2017 Inservice Inspection Summary Report - 1 RE20 NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 20162017-02-0808 February 2017 Inservice Inspection Summary Report -2RE18 Completed in November 2016 NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing2016-04-25025 April 2016 1RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-16003355, Inservice Inspection Summary Report, 1RE192016-03-24024 March 2016 Inservice Inspection Summary Report, 1RE19 NOC-AE-15003282, Inservice Inspection Summary Report -2E172015-08-0606 August 2015 Inservice Inspection Summary Report -2E17 NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE182014-08-26026 August 2014 Inservice Inspection Summary Report - 1 RE18 NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing2014-05-22022 May 2014 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-14003112, Inservice Inspection Summary Report - 2RE162014-03-24024 March 2014 Inservice Inspection Summary Report - 2RE16 NOC-AE-13002968, Inservice Inspection Summary Report - 1RE172013-02-21021 February 2013 Inservice Inspection Summary Report - 1RE17 NOC-AE-12002803, Inservice Inspection Summary Report - 2RE152012-02-20020 February 2012 Inservice Inspection Summary Report - 2RE15 NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing2011-09-21021 September 2011 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-11002706, Inservice Inspection Summary Report - 1RE162011-07-28028 July 2011 Inservice Inspection Summary Report - 1RE16 NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2011-03-14014 March 2011 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-10002585, Inservice Inspection Summary Report - 2RE142010-08-0202 August 2010 Inservice Inspection Summary Report - 2RE14 NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval2010-07-29029 July 2010 Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2010-07-13013 July 2010 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-11002684, Categorization of Risk-Informed Piping2010-06-20020 June 2010 Categorization of Risk-Informed Piping ML1006401202010-02-22022 February 2010 Inservice Testing Program Description for the Third 10-Year Interval NOC-AE-10002522, Inservice Inspection Summary Report - 1RE152010-02-16016 February 2010 Inservice Inspection Summary Report - 1RE15 NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing2009-03-24024 March 2009 Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing NOC-AE-09002381, Inservice Inspection Summary Report - 2RE132009-01-20020 January 2009 Inservice Inspection Summary Report - 2RE13 NOC-AE-08002318, Inservice Inspection Summary Report - 1RE142008-06-23023 June 2008 Inservice Inspection Summary Report - 1RE14 NOC-AE-07002195, Inservice Inspection Summary Report - 2RE122007-07-25025 July 2007 Inservice Inspection Summary Report - 2RE12 NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing2007-04-16016 April 2007 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing ML0701602012007-01-0808 January 2007 Inservice Inspection Summary Report - IRE13 NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing2005-10-12012 October 2005 Refueling Outage Inservice Inspection Results for Steam Generator Tubing NOC-AE-05001910, Inservice Inspection Summary Report - 1RE122005-07-15015 July 2005 Inservice Inspection Summary Report - 1RE12 NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant2005-03-0303 March 2005 Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant 2024-09-04
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-240040, Inservice Inspection Summary Report - 2RE232024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 NOC-AE-240040, Operator Licensinq Examination Schedule Revision 32024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 NOC-AE-240040, Annual Dose Report for 20232024-04-29029 April 2024 Annual Dose Report for 2023 NOC-AE-240040, Financial Assurance for Decommissioning - 2024 Update2024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation2024-02-0808 February 2024 Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic 2024-09-04
[Table view] |
Text
Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth. Texas 77483 February?, 2019 NOC-AE-19003624 10CFR50.55a U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 1 Docket No. STN 50-498 Inservice Inspection Summary Report- 1RE21 Attached is the South Texas Project Electric Generating Station Unit 1 summary report for inservice inspections performed prior to and during scheduled refueling outage 1RE21 completed in November 2018. This summary report satisfies the reporting requirements of American Society of Mechanical Engineers ASME Code Section Xl, Article IWA-6230.
There are no commitments in this letter.
If there are any questions regarding this report, please contact Wendy Brost at (361) 972-8516 or me at (361) 972-7806.
- ^c<
"Christopher Georg^son Manager, Design Engineering web
Attachment:
Summary Report for 1RE21 Inservice Inspection of Unit 1 South Texas Project Electric Generating Station STI:34799132
NOC-AE-19003624 Page 2 of 2 ec:
(paper copy)
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (09E01) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth.TX 77483
NOC-AE-19003624 Page 1 of 8
SUMMARY
REPORT For 1RE21 INSERVICE INSPECTION Of UNIT 1 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Nuclear Operating Company STP NUCLEAR OPERATING COMPANY 04/29/17-11/11/18
NOC-AE-19003624 Page 2 of 8 COVER SHEET 1RE21 INSERVICE INSPECTION
SUMMARY
REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50.498 OPERATING LICENSE NO: NPF-78 COMMERCIAL OPERATION DATE: AUGUST 25,1988 Prepared <$Ws^
bv: C^W^^ _ Date ^FeSWf Erie Lanlz, ISITrogram Engineer Reviewed by: /^//^ 7 _ Date 2/4/Wf ^
Brian IVIigl^upervisor, /Testing Programs f
NOC-AE-19003624 Page 3 of 8 SCOPE COMPONENT SUPPORTS, REPAJR/REPLACEMENT ACTIVITIES, SYSTEM PRESSURE TESTS, CONTAINMENT METAL LINER, AND WELD INSPECTION PROGRAMS (IWB, IWC, IWD, IWF, IWL}
The examinations summarized in this report were perfQrmed in accdrdance with Ihe 2004 Edition of the ASME Cocte, Section Xl that is applicable to the South Texas Project. Unit 1, third 1an-year interval (09/25/2010-09/24/2020), third period (12/20/2017-09/24/2020). This repQrt covers selected ASME Code Class 1, 2, and 3 Systems/Comppnents. This report is documented in accordance with the requirements of ASME Section Xl Code Case N-532-4, Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined In 1WB-2412 for ASME Code Class 1 Systeme/Components, IWO-2412forASME Code Class 2 Systems/Componehts, IWD-2412 for ASME Code Class 3 Systems/Components, ^nd IWF-2410 component supports, ASME Code Class 1 components were examined as prescribed by Table IWB~2500-1 and the applicable Examination Categories, which established the examinatJQn frequency at each refueling outage. The ASME Code Class 2 Systems/CQmponents were examined in accordance with Table IWC-2500~1, Examination Categories, The ASME Code Class 3 Systems/Components were examined in accordance with Table tWD-250Q-1, ExaminatiQH Categories. Gomponent Supports were examinecl in accordance with IWF-Table 2500-1, Examination Categories.
The Containment Tendon Test / End Anchorage and Adjacent Concrete Inspection was perfQrmed in accordance with the 2004 Edition bftheASNE Code>> Sedion Xl, Subsection IWL as sypplemented and modified by 10CFR50.55a(b)(2)(viti).
NOC-AE-19003624 Page 4 of 8 TORMOAR-l OWNER'S ACTTV1TY REPORT (Code CaseN-532-4)
ReportNumnber_OAR-1.RE21, Plant_South Texas Project Electric Generating Station Unit No, I _ommerGiaI service date August 25,1988 jtefueling outage no, 1HJS21 (If applicable)
Current inspection rntem! IWB. WC. IWD. IWF- 3hi__: WE -3n{.
(lst,2>>(I,3M4tb^her) purreot inspedion period IWB, IWC. IWD. IWF - 3rd ^
<!5V?nd,3rf)
Edition and Addenda of Section XI applicable to the inspection plan ,2Q04Edition_
Bate and revisioa ofmspection plan^ Revision 8 Effecdve date: 02/27/2018 Edition and Addenda of Section. XI applicable to rejpairs/replacement activifies, if different than fh.e iAspection plan N/A Code Cases used: N-46D< ?532-4< N-578-1. N-706-l< ?729-4 N-770-2, N-722-1 _
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspectipn Plan as required by the ASME Code,Section XI; and (e) the repair/replacement activities and evaluaticms supporting the cQmpletion of
_1RE21_ conform to the requirements of Section XI.
(RNueIing outage number)
Signed mC_t^T^ ISIProsram Engineer Date: January :30,2019 (Owner of Owner^Designee, Title]
^6 T^,ar>{-maa 1T^-
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdirig a valid commission issued by the National Board of Boiler and pressure Vessel Inspectors and the State or Province of
_T^as__^_ and employed by_ABS Boiler & Marine Insurance Co>__ of__Hou?t<3n, Texas^^.have ins^cted the items described m this Owner's A.cfivity Report, and state that, to the best of my knowledge and belief the Owner Ns perfoFmed all activities represented by this report in accordance with the requirements of Section XL ;:
fiy signing this certificate neither the Inspector nor his employer.makes my warranty,, expressed pr implied, concemmg the repairs/
replacements activities and eyalyatlpn described this report, Furtliennore., neither the inspector nor his employer shall be liable ift my manner for any personal mjury or property damage or alossofanylcind arising j&om the connected with this inspection.
^^.^^^<^ yijF'y-5^
[^%i actor's Signature Natfonal Board, Slate, Province, andBhdoKiements
'^^^D^
NOC-AE-19003624 Page 5 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 1RE21 FALL 2018 Examination Item Item Evaluation Description Category Number Description N/A N/A N/A N/A NOTES:
1, No items with flaws or relevant conditions that required evaluatlQn for continued service were found during 1 RE21.
NOC-AE-19003624 Page 6 of 8 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 1RE21 FALL 2018 Code Corrective Measure Item Systerft Description of Work Date Repair/Replacemenf Plan Number Class Description Completed 3 REPLACEMENT VAWE ESSENTIAL Replaced Valve At EWR/6935 6/21/2018 1-15-063 COOLING WATER 3 REPLACEyENT VALVE CHILLED Replaced Valve 3VH1TCH0590 6/20/2017 1 *.16-028 WATER 2 REPLACEMENT VALVE MAIN STEAM Refurbish 3Q" Valve, Replaced stem 11/2/2018 1-16-031 Assembly.
2 REPAIR VAD^/E VAIN STEAM Refurbish 30" Valve. Replaced stem 11/2/2018 1-16-032 Assembly and Studs.
T REPLACEMENT VALVE STARTINGAIR Replaced Valve 3Q1 B1XSD0007C 6/5/2017 1-17-012 3 REPLACEMENT VALVE ESSENTIAL Replaced Valve 3R281TEW0079 6/6/2017 1-17-016 COOLING WATER 3 REPAIR VALVE ESSENTIAL Refurbished and returned to 10/4/2017 1-17-017 COOLING warehouse.
WATER 3 REPLACEMENT VALVE ESSENTIAL Replaced Vatve B1EWR/%36 7/2772017 1-17-018 COOLING WATER 3 REPLACEMENT PIPING ESSENTIAL Removed Range to use under WAN 7/13/2017 1-17-019 COOLING 556955.
WATER 3 REPLACEMENT PIPING ESSENTIAL Replaced 4" pipe, ASME Welds. 10/26/2017 1-17-021 COOLING WATER 3 REPLACEMENT PIPING ESSENTIAL Replaced pipe and fitting. ASME 10/26/2017 1-17-022
/COOUN3 Welds.
WATER 3/NF REPAIR SUPPORTS ESSENTIAL Reworked pipe supports. ASME 10/26/2017 1-17-023 COOLING Weldgi.
WATER 3 REPLACEMENT PIPING ESSENTIAL Replaced pipe and fittinQ. ASME 10/26/2018 1-17-024 COOLING Welds.
WATER 3/NF REPLACEMENT PIPING ESSENTIAt Replaced pipe and fitting. ASME 10/^6/2017 W7-02S COOLING Welds.
WATER 311 REPAIR. FLANGES ESSENTIAL OVERLAY FLANGES WITH 3/22/2018 1-17-026 COOLING ALUMINUM BRONZE.
WATER
NOC-AE-19003624 Page 7 of 8 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTMTIES REQUIRED FOR CONTINUED SERVICE 1 RE21 FALL 2018 Code Class Corrective IVIeasure Item System Description of Work Date Repalr/RepIacement Plan Number Description Completed 3 REPLACEMENT PIPING ESSENTIAL Replaced Piping, ASME Welds. 8/15/2018 1-17-028 COOLING WATER 3 REPLACEMENT FASTENER8 CHILLED Replace Fastehers N10HPSV9508 10/18/2017 1-17-032 WATER 3 REPLACENENT PIPING COMPONENT Replaced piping, ASME Welds. 8/15/2018 1-17<<036 COOLING 1 REPLACEMENT SEAL PACKAGE REACTOR Replaced CARTRIDGE SEAL 11/1/2Q18 1-17-037 COOLANT PACKAGE.
3 REPAIR PIPING ESSENTIAL A8ME, Welds, 8/13/2018 1-18-003 COOUNG WATER a REPLACEMENT PIPING ESSENTIAL Replaced ptping/fittings. 8/13/2(N8 1-18-004 COOUNG WATER 3 REPLACEMENT PIPING ESSENTIAL Replaced plplng/fittings. 8/13/2018 1-18-005 COOLING WATER 3: REPLACEMENT PIPING ESSENTIAL Replacect plpIng/TOngs. 8/13/2018 1-18-006 COOLING WATER 3 REPAIR PIPING ESSENTIAL Reworked pipe supports. 8/13/2018 M8-007 COOLING WATER 2 REPLACEMENT VALVE MAIN STEAM Replace Code part (Pilot Poppet). 11/2/2018 1-18-010 2 REPLACEMENT VALVE MAIN 8TEAV Replace: Code part (Pilot Poppet and 1171/2018 1-1MT1 stud/boltlng).
1 REPLACEMENT VALVE REACTOR Replaced 6" PZR Safety Valve 10/25/2018 1-18-016 COOLANT N1RCP8V345D 1 REPLACEMENT VALVE REACTOR Replaced 6" PZR Safety Valve 10/25/2018 1-18-017 CDOLANT N1RCFG0006A 1 REPLACEMENT VALVE REACTOR Replaced 6" PZR Safety Valve 10/25/20TO M8-Q18 COOLAMT H1RCPSV3452
NOC-AE-19003624 Page 8 of 8 TABLE 2 ABSTRACT OF REPAIR/REPLAGEMENT ACTIVITIES REQUIRED FQR CONTINUED SERVICE 1RE21 FALL 2018 Code Class Corrective Measure Item System Description of Work Date Repair/RepIacement Plan Number Description completed 1 REPLACEMENT BOLTING REACTOR REPLACED RCP1A SEAL HOUSING 10/17/2018 1-18-026 COOLANT BOLTS WITH INCONEL STUDS<
- 2. REPLACEMENT VALVE CHEyiCAL& Replace Code Parts (Trim Set, Plug>> 10/17^018 1-18-036 VOLUME Seat, and Cage).
CONTROL 2 REPLACEMENT VALVE MAIN STEAM Replaced Code Part (Bonnet)* 10/27/2018 1-18-037