ML19004A122

From kanterella
Jump to navigation Jump to search
Initial Operator Licensing Operating Test Approval
ML19004A122
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/03/2019
From: Diane Jackson
Operations Branch I
To: Sena P
Public Service Enterprise Group
Jackson D
References
Download: ML19004A122 (3)


Text

P. Sena UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 January 3, 2019 Mr. Peter P. Sena, III Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SALEM NUCLEAR GENERATING STATION - INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL

Dear Mr. Sena:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at Salem Nuclear Generating Station. Please note that written examination approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Dan McHugh, Operations Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC staff will administer the operating tests during the weeks of January 14 and 21, 2019. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

P. Sena 2 Please contact your Chief Examiner, Mr. David Silk at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-75 cc: Distribution via ListServ

P. Sena 3

SUBJECT:

SALEM NUCLEAR GENERATING STATION - INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL DATED JANUARY 3, 2019 DISTRIBUTION: (via email)

DLew, RA (R1ORAMAIL Resource)

RLorson, DRA (R1ORAMAIL Resource)

DCollins, DRP (R1DRPMAIL Resource)

DPelton, DRP (R1DRPMAIL Resource)

JYerokun, DRS (R1DRSMAIL Resource)

BWelling, DRS (R1DRSMAIL Resource)

FBower, DRP SElkhiamy, DRP MDraxton, DRP PFinney, DRP, SRI MHardgrove, DRP, RI SCalabrese, DRP, AA DJackson, DRS DSilk, DRS DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY19-Salem - Jan19\Salem2019ExamApproval-O-Ltr-Rev11.docx ADAMS PKG: ML18081A982 ADAMS ACCESSION NO.: ML19004A122 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME DSilk DEJackson DATE 12/17/18 1/3/19 OFFICIAL RECORD COPY