IR 05000397/2023402

From kanterella
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 050003972023402 (Full Report)
ML23054A359
Person / Time
Site: Columbia 
Issue date: 02/23/2023
From: Ray Kellar
NRC/RGN-IV/DRSS/PSB
To: Schuetz R
Energy Northwest
Kellar R
References
IR 2023402
Download: ML23054A359 (9)


Text

February 23, 2023

SUBJECT:

COLUMBIA GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000397/2023402

Dear Robert Schuetz:

On February 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station and discussed the results of this inspection with William Hettel, Executive Vice President/Chief Nuclear Officer, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2023402

Enterprise Identifier:

I-2023-402-0020

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

February 13, 2023 to February 16, 2023

Inspectors:

D. Hostetter, Physical Security Inspector

W. Tejada, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC inspection of this program area, Security Plan Revision 20 to 21 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) March 2022 through February

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 16, 2023, the inspectors presented the security baseline inspection results with William Hettel, Executive Vice President/Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Condition Reports

CR 434494, CR 434785, CR 434845, CR435026, CR

435145, CR435706, CR 435769, CR 437303, CR 437303,

CR 437394, CR 438267, CR 439250, CR 439274, CR

440882

Multiple

Corrective Action

Documents

Resulting from

Inspection

Condition Report

AR-00441748

2/16/2023

ADI-1

Green Badge Process

Revision 4

ADI-2

Blue Badge Process

Revision 3

ADI-3

Fingerprint Instructions

Revision 3

ADI-4

Psychological Evaluations

Revision 1

ADI-5

Security Screening Informational System - Database

Revision 4

ADI-6

PADS Operation & Control

Revision 5

ADI-7

Electronic Personnel History Questionnaire (ePHQ)

Revision 2

SPIP-65

Access Authorization Program

Revision 10

SWP-CAP-01

Corrective Action Program

Revision 45

SWP-FFD-02

Behavioral Observation Program

Revision 7

SWP-SEC-06

Personnel Access Data Systems

Revision 8

71130.01

Procedures

SWP-SEC-07

Nuclear Power Plant Access Authorization Program

Revision 23

Corrective Action

Documents

Condition Reports

CR 00431955, CR 00432233, CR 00432560, CR 00432798,

CR 00432861, CR 00433150, CR 00433490, CR 00433867,

CR 00434047, CR 00433771, CR 00433851, CR 00433852,

CR 00434978, CR 00435026, 00435724, CR 00437104,

CR 00438033, CR 00438084, CR 00439250, CR 00440252,

CR 00440267

Multiple

Corrective Action

Documents

Resulting from

Inspection

Condition Reports

CR 00441704, CR 00441747, CR 00441748, CR 00441751

Multiple

SPIP-SEC-01

Sergeant and Lieutenant Duties

Revision 26

71130.02

Procedures

SPIP-SEC-02

Central and Secondary Alarm Stations

Revision 21

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SPIP-SEC-05

Personnel Search Officer, Access Control/Security

Communications Center Officer, Protected Area Access

Point

Revision 38

SPIP-SEC-06

Vehicle Escort Officer, Vehicle Search Officer, and Protected

Area Perimeter Gates

Revision 26

SPIP-SEC-10

Special Purpose Detectors, Operability Test, Inspection, and

Maintenance Records

Revision 18

SPIP-SEC-19

Key and Lock Control

Revision 007

SPIP-SEC-48

Itemizer 4DX Explosive Detector

Revision 008

SPIP-SEC-64

Warehouse X-Ray

Revision 003

SPIP-TQS-06

Managing Security Qualifications

Revision 5

SWP-SEC-01

Vital and Protected Area Key and Lock Control

Revision 8

SWP-SEC-03

Security Responsibilities of Site Personnel

Revision 30

SWP-SEC-07

Nuclear Power Plant Access Authorization Program

Revision 23

SWP-SEC-08

Plant Key and Lock Control

Revision 003

SWP-SEC-12

Protected and Vital Area Personnel and Vehicle Access

Controls

Revision 008

SWP-SEC-16

Identification, Maintenance and Development of Target Sets

Revision 0

Self-Assessments

AR-SA Number:

439133

Self-Assessment Report

2/12/2022

Delta Scientific

DSC 7500

DBT LV Impact LS-DYNA Evaluation

03/04/2021

Familiarization

Fire

Physical Demonstrations of BRE Ports

July - August

22

NSO-01 OJT/TPE

Nuclear Security Officer Initial Certificate OJT/TPE

Administrator Manual

Revision 5

Plant Security

Phase II

Engineering & Design

2/21/2020

Miscellaneous

VBS Redesign

Phase I

Building Target Set MSSD Evaluation

04/12/2014

Physical Security

Plan

Columbia Generating Station, Physical Security Plan,

Training & Qualification Plan, Safeguards Contingency Plan,

and Independent Spent Fuel Storage Installation Plan

Revision 21

71130.09

Procedures

SPIP-SEC-18

Safeguards Compensatory Measures

08/12/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SPIP-SEC-59

Protective Strategy

08/12/2022

Miscellaneous

Performance

Indicators

Quarterly PI Information

Multiple

71151

Procedures

SFI-22

IDS/CCTV NRC Performance Indicator

Revision 0