IR 05000397/2023402
| ML23054A359 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/23/2023 |
| From: | Ray Kellar NRC/RGN-IV/DRSS/PSB |
| To: | Schuetz R Energy Northwest |
| Kellar R | |
| References | |
| IR 2023402 | |
| Download: ML23054A359 (9) | |
Text
February 23, 2023
SUBJECT:
COLUMBIA GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000397/2023402
Dear Robert Schuetz:
On February 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station and discussed the results of this inspection with William Hettel, Executive Vice President/Chief Nuclear Officer, and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000397 License No. NPF-21
Enclosure:
As stated
Inspection Report
Docket Number:
05000397
License Number:
Report Number:
Enterprise Identifier:
I-2023-402-0020
Licensee:
Energy Northwest
Facility:
Columbia Generating Station
Location:
Richland, WA
Inspection Dates:
February 13, 2023 to February 16, 2023
Inspectors:
D. Hostetter, Physical Security Inspector
W. Tejada, Physical Security Inspector
Approved By:
Ray L. Kellar, P.E., Chief
Physical Security Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were evaluated:
Access Authorization
- (1) Tier I: All Requirements
Tier II: All Requirements
Tier III: All Requirements
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
- (1) Tier I: All Requirements
Tier II: All Requirements
Tier III: All Requirements
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC inspection of this program area, Security Plan Revision 20 to 21 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
(1)
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
- (1) March 2022 through February
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 16, 2023, the inspectors presented the security baseline inspection results with William Hettel, Executive Vice President/Chief Nuclear Officer, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Reports
CR 434494, CR 434785, CR 434845, CR435026, CR
435145, CR435706, CR 435769, CR 437303, CR 437303,
CR 437394, CR 438267, CR 439250, CR 439274, CR
440882
Multiple
Corrective Action
Documents
Resulting from
Inspection
Condition Report
2/16/2023
ADI-1
Green Badge Process
Revision 4
ADI-2
Blue Badge Process
Revision 3
ADI-3
Fingerprint Instructions
Revision 3
ADI-4
Psychological Evaluations
Revision 1
ADI-5
Security Screening Informational System - Database
Revision 4
ADI-6
PADS Operation & Control
Revision 5
ADI-7
Electronic Personnel History Questionnaire (ePHQ)
Revision 2
SPIP-65
Access Authorization Program
Revision 10
SWP-CAP-01
Corrective Action Program
Revision 45
SWP-FFD-02
Behavioral Observation Program
Revision 7
SWP-SEC-06
Personnel Access Data Systems
Revision 8
Procedures
SWP-SEC-07
Nuclear Power Plant Access Authorization Program
Revision 23
Corrective Action
Documents
Condition Reports
CR 00431955, CR 00432233, CR 00432560, CR 00432798,
CR 00432861, CR 00433150, CR 00433490, CR 00433867,
CR 00434047, CR 00433771, CR 00433851, CR 00433852,
CR 00434978, CR 00435026, 00435724, CR 00437104,
CR 00438033, CR 00438084, CR 00439250, CR 00440252,
CR 00440267
Multiple
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
CR 00441704, CR 00441747, CR 00441748, CR 00441751
Multiple
SPIP-SEC-01
Sergeant and Lieutenant Duties
Revision 26
Procedures
SPIP-SEC-02
Central and Secondary Alarm Stations
Revision 21
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SPIP-SEC-05
Personnel Search Officer, Access Control/Security
Communications Center Officer, Protected Area Access
Point
Revision 38
SPIP-SEC-06
Vehicle Escort Officer, Vehicle Search Officer, and Protected
Area Perimeter Gates
Revision 26
SPIP-SEC-10
Special Purpose Detectors, Operability Test, Inspection, and
Maintenance Records
Revision 18
SPIP-SEC-19
Key and Lock Control
Revision 007
SPIP-SEC-48
Itemizer 4DX Explosive Detector
Revision 008
SPIP-SEC-64
Warehouse X-Ray
Revision 003
SPIP-TQS-06
Managing Security Qualifications
Revision 5
SWP-SEC-01
Vital and Protected Area Key and Lock Control
Revision 8
SWP-SEC-03
Security Responsibilities of Site Personnel
Revision 30
SWP-SEC-07
Nuclear Power Plant Access Authorization Program
Revision 23
SWP-SEC-08
Plant Key and Lock Control
Revision 003
SWP-SEC-12
Protected and Vital Area Personnel and Vehicle Access
Controls
Revision 008
SWP-SEC-16
Identification, Maintenance and Development of Target Sets
Revision 0
Self-Assessments
AR-SA Number:
439133
Self-Assessment Report
2/12/2022
Delta Scientific
DSC 7500
DBT LV Impact LS-DYNA Evaluation
03/04/2021
Familiarization
Fire
Physical Demonstrations of BRE Ports
July - August
22
NSO-01 OJT/TPE
Nuclear Security Officer Initial Certificate OJT/TPE
Administrator Manual
Revision 5
Plant Security
Phase II
Engineering & Design
2/21/2020
Miscellaneous
VBS Redesign
Phase I
Building Target Set MSSD Evaluation
04/12/2014
Physical Security
Plan
Columbia Generating Station, Physical Security Plan,
Training & Qualification Plan, Safeguards Contingency Plan,
and Independent Spent Fuel Storage Installation Plan
Revision 21
Procedures
SPIP-SEC-18
Safeguards Compensatory Measures
08/12/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SPIP-SEC-59
Protective Strategy
08/12/2022
Miscellaneous
Performance
Indicators
Quarterly PI Information
Multiple
71151
Procedures
SFI-22
IDS/CCTV NRC Performance Indicator
Revision 0