IR 05000027/2015201

From kanterella
Jump to navigation Jump to search
IR 05000027/2015201 on January 13-15, 2015 Washington State University Cover Letter for Security Inspection Report
ML15037A166
Person / Time
Site: Washington State University
Issue date: 02/11/2015
From: Kevin Hsueh
Research and Test Reactors Branch B
To: Wall D
Washington State Univ
Morlang G
Shared Package
ML15037A186 List:
References
IR 2015201
Download: ML15037A166 (4)


Text

ary 11, 2015

SUBJECT:

WASHINGTON STATE UNIVERSITY - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-027/2015-201

Dear Dr. Wall During the period January 13-15, 2015, the U.S. Nuclear Regulatory Commission (NRC or the Commission) conducted a security inspection at your Washington State University TRIGA research reactor facility located in the Nuclear Radiation Center. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, implementation of certain compensatory measures, and compliance with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 Inspections, exemptions, requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of this letters enclosure will not be available for public inspection.

NOTE: Document transmitted herewith contains security-related information.

When separated from enclosure, this document is decontrolled D. Wall -2-Should you have any questions concerning this inspection, please contact Mr. Mike Morlang at 301-415-4092.

Sincerely,

/RA/

Kevin Hsueh, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-027 License No. R-76 Enclosure:

NRC Inspection Report No. 50-027/2015-201 cc w/o encl: See next page Washington State University Docket No.50-027 cc:

Chair, Reactor Safeguards Committee Nuclear Radiation Center Washington State University P.O. Box 641300 Pullman, WA 99164 - 1300 Mr. Corey Hines Reactor Supervisor, Nuclear Radiation Center Washington State University P.O. Box 641300 Pullman, WA 99164 - 1300 Dr. Jean Cloran Radiation Safety Officer Washington State University P.O. Box 641302 Pullman, WA 99163-1302 Office of the Governor Executive Policy Division State Liaisons Officer P.O. Box 43113 Olympia, WA 98504-3113 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Dr. Christopher Keane Vice President for Research and Professor of Physics Office of Research P.O. Box 646525 Washington State University Pullman, WA 99164-1030 ML15037A186 NRC-002 OFFICE NRR/DPR/PROB NRR/DPR/PROB NAME GMorlang KHsueh DATE 2/11/15 2/11/15