Letter Sequence Request |
---|
EPID:L-2017-LLL-0035, Washington State Univ., Submittal of Reactor Staff Requalification Program (Open) |
|
MONTHYEARML18334A1022018-11-19019 November 2018 Washington State Univ., Submittal of Reactor Staff Requalification Program Project stage: Request ML19204A2042019-07-29029 July 2019 Washington State University - Approval of the Revised Operator Requalification Program for the Washington State University Research Reactor Project stage: Other 2018-11-19
[Table View] |
|
---|
Category:Letter
MONTHYEARML24011A1702024-01-11011 January 2024 Washington State University, Revised Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request - Section 5 of the Technical Specifications and Bases ML24003A7892024-01-0303 January 2024 Washington State Univ., Request to Rescind Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modifie ML24003A9152024-01-0303 January 2024 Washington State University, Change in Level 1 Management for the Wsu Reactor Facility ML23334A1952023-11-30030 November 2023 Response to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, P ML23261A6082023-09-20020 September 2023 Washington State University Rfai License Amendment Request for Section 5 of the Technical Specifications for the Washington State University Modified Triga Nuclear Reactor and Facility License R-76 ML23242A3122023-08-30030 August 2023 Washington State University Modified Triga Reactor, 2023 Annual Report ML23102A2052023-08-28028 August 2023 Examination Result Letter No. 50-027/OL-23-01, Washington State University ML23220A3862023-08-0808 August 2023 License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendment 22 IR 05000027/20232012023-06-13013 June 2023 Washington State University U.S. Nuclear Regulatory Commission Routine Inspection Report 05000027-2023201 ML23102A2022023-05-10010 May 2023 Examination Confirmation Letter No. 50-027/Ol-23-01 Washington State University IR 05000027/20222012022-10-0606 October 2022 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2022201 ML22242A3062022-08-30030 August 2022 Washington State University Modified Triga Reactor - 2022 Annual Report for the Wsu Nuclear Science Center ML22137A1022022-06-0606 June 2022 Examination Confirmation Letter No. 50-27/OL-22-01, Washington State University IR 05000027/20212012021-08-27027 August 2021 Washington State University - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000027/2021201 ML21228A1322021-08-16016 August 2021 2021 Annual Report for the Wsu Nuclear Science Center ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20258A0312020-09-14014 September 2020 Examination Confirmation Letter No. 50-027/OL-21-01, Washington State University IR 05000027/20202012020-08-24024 August 2020 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2020201 ML20045D7822020-02-14014 February 2020 Washington State University Modified Triga Reactor: Nuclear Science Center Emergency Plan Updates - Summary of Changes (Revision 1/2020) ML20027C5532020-01-27027 January 2020 Washington State Univ., License Amendment Request (Supplemental) - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML19273A9412019-09-30030 September 2019 Washington State University, License Amendment Request - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML19246C1622019-09-0303 September 2019 Washington State University Modified Triga Reactor - Change to Level 2 Management in the Facility Organization IR 05000027/20192012019-08-30030 August 2019 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-027/2019-201 ML19235A0592019-08-20020 August 2019 Submittal of the 2019 Annual Report for the Wsu Nuclear Science Center ML19210D9652019-07-30030 July 2019 Examination Report No. 50-027/OL-19-01, Washington State University ML19204A2042019-07-29029 July 2019 Washington State University - Approval of the Revised Operator Requalification Program for the Washington State University Research Reactor ML19172A1042019-06-18018 June 2019 Washington State University Modified Triga Reactor - Change in Level 2 Management ML19072A0472019-03-18018 March 2019 Examination Confirmation Letter No. 50-027/OL-19-01, Washington State University ML18334A1022018-11-19019 November 2018 Washington State Univ., Submittal of Reactor Staff Requalification Program IR 05000027/20182022018-10-19019 October 2018 Washington State University - U.S. Nuclear Regulatory Commission Security Inspection Report No. 50-027/2018-202 (Letter) ML18235A3182018-08-20020 August 2018 Annual Report for the Wsu Facility for the Period July 1, 2017 Through June 30, 2018 IR 05000027/20182012018-08-13013 August 2018 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-027/2018-201 ML18179A4932018-06-28028 June 2018 Examination Report No. 50-027/OL-18-01, Washington State University Nuclear Radiation Center ML18012A0492018-01-10010 January 2018 Washington State University - Response to Part 71 Quality Assurance Program Approval Biennial Change Report ML17237A0522017-08-22022 August 2017 Washington State University Submittal of Annual Operating Report for the Period July 1, 2016 Through June 30, 2017 IR 05000027/20172012017-08-17017 August 2017 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000027/2017201 ML17181A2032017-07-0606 July 2017 Examination Report No. 50-027/OL-17-01, Washington State University ML17067A4042017-04-17017 April 2017 Washington State University GL 2016-01 Closeout Form Letter for Rtrs with No Credited NAM ML17073A0072017-03-16016 March 2017 Examination Confirmation Letter, 50-027/OL-17-01, Washington State University ML16321A4042016-11-0707 November 2016 Washington State University Response to Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML16266A2142016-10-25025 October 2016 Request for Withholding Information from Public Disclosure for the Virgil C. Summer Nuclear Station, Units 2 and 3 ML16245A2282016-08-19019 August 2016 Washington State University, Submittal of Annual Report from July 1, 2015 Through June 30, 2016 IR 05000027/20162022016-08-18018 August 2016 Washington State University - NRC Security-Related Inspection Report 05000027/2016202 IR 05000027/20162012016-08-11011 August 2016 Washington State University NRC Routine Inspection Report No. 05000027/2016201,July 19-21, 2016 ML16068A1162016-03-0808 March 2016 Examination Notification Letter No. 50-027/OL-16-01, Washington State University ML15278A3712015-12-29029 December 2015 Request for Withholding Proprietary Information from Public Disclosure for Virgil C. Summer Nuclear Station Units 2 and 3 License Amendment Request, Supplemental Requirements for Mechanical Coupler Weld Acceptability, Supplement 2, Enclosur ML15278A2872015-11-0505 November 2015 Acceptance Letter Sce&G V.C. Summer LAR 15-17, Addition of Two New Turbine Building Sump Pumps to ITAAC ML15223A4382015-08-0707 August 2015 Washington State University - Annual Report for Operating Period July 1, 2014 Through June 30, 2015 ML15217A4932015-07-28028 July 2015 Letter from Donald Wall Reportable Occurrence Involving Release of Fission Products Into Environment ML15182A2612015-07-21021 July 2015 Examinantion Report 50-027/OL-15-02 Washington State University 2024-01-03
[Table view] Category:Report
MONTHYEARML18334A1022018-11-19019 November 2018 Washington State Univ., Submittal of Reactor Staff Requalification Program ML0823802662008-06-13013 June 2008 Redacted - Revised Version of the Safety Analysis Report Regarding Heu/Leu Conversion, Final Report ML0823802732008-06-13013 June 2008 Redacted - Appendix C: Wsu Receipt Inspection Records Regarding Heu/Leu Conversion ML0823802722008-06-13013 June 2008 Appendix B: Fuel Source Inspection Reports Regarding Heu/Leu Conversion ML0307005612003-02-28028 February 2003 Response to NRC Request for Additional Information, Dated 01/09/03 2018-11-19
[Table view] Category:Miscellaneous
MONTHYEARML18334A1022018-11-19019 November 2018 Washington State Univ., Submittal of Reactor Staff Requalification Program ML0823802662008-06-13013 June 2008 Redacted - Revised Version of the Safety Analysis Report Regarding Heu/Leu Conversion, Final Report ML0823802732008-06-13013 June 2008 Redacted - Appendix C: Wsu Receipt Inspection Records Regarding Heu/Leu Conversion ML0823802722008-06-13013 June 2008 Appendix B: Fuel Source Inspection Reports Regarding Heu/Leu Conversion 2018-11-19
[Table view] |
Text
WASHINGTON STATE U UNIVER5I1Y Nuclear Science Center November 19, 2018 S. Traiforos Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 115 55 Rockville Pike Rockville, MD 20852-2738
Dear Mr.. Traiforos,
Attached to this letter is a revised copy of the WSU Reactor Staff Requalification Program updated to reflect minor changes in policy. The revisions include updated language to include the *requirements from the American Nuclear Insurers policy for training records document retention; a change in the departmental name from Nuclear Radiation Center to Nuclear Science Center; and minor grammatical corrections.
These changes have been approved by the WSU Reactor Safeguards Committee on 8/23/2018, and are submitted for your approval under the revision dated 8/2/2018.
If you have any questions about these revisions, please contact me at 509-335-8641 or by electronic mail at cchines@wsu.edu. '
Sincerely, cc: U.S. NRC Document Control Desk PO Box 641300, Pullman, WA 99164-1300 509-335-864 l I nsc.or.wsu.edu
Rev. 8/2/2018 REACTOR STAFF REQUALIFICATION PROGRAM WSU Nuclear Science Center Each licensed. reactor operator (RO) and senior reactor operator (SRO) at the Washington State University Nuclear Science Center (NSC) reactor facility shall participate in the reactor staff requalification program as outlined below. If there is only one SRO at the NSC, that SRO will prepare, administer, and grade the written examinations and be exempted from taking the written examinations. If there is more than one SRO, the responsibility for writing, administering, and grading the written examinations shall be rotated between or among the SRO(s) so that no SRO is exempted from taking the written examination for two consecutive biennial cycles. The requirements in this plan follow the requirements set in ANSI/ANS 15.4 and 10 CFR 55.59. The requalification activities required are detailed in the following sections.
- 1. Biennial Written Requalification Examination Licensed operators and senior operators will biennially, at intervals not to exceed 30 months, take a written examination. This examination will be broken down into sections in accordance with the subjects set forth in 10 CFR 55.41 for the RO examination and 55.43 for the SRO examination as applicable to a non-power reactor. Sections of this examination may be administered over a period of time not to exceed one month. Any individual who does not receive a grade of 70% or higher on any section will be given additional training and/or tutorial lectures and then be reexamined. Individuals who
- receive a grade of less than 70% on any one section will not be allowed to perform licensed duties until after receiving additional training and successfully passing a second examination in that subject area. An overall grade of 70% for the entire examination will be considered as a passing mark.
- 2. Annual Operations Test
- a. An annual operations test shall be administered to each RO and SRO at intervals not to exceed 15 months in order to meet the requirements of 10 CFR 55.59 (a.2.ii). The operations test shall consist of the following elements:
- 1. Checkout and startup of the reactor.
- 2. Bringing the reactor up to full power.
- 3. Reducing the reactor power and leveling off at 50% power.
- 4. Responding to an alarm situation.
- 5. Shutting down the reactor.
Page 1
NSC Requalification Program Rev. 8/2/2018
- b. Each of the five sections on the operations test shall be graded as pass or fail. A licensee shall pass all five sections to receive a passing grade for the test. The following conditions shall apply to a licensee who does not receive a passing grade on the annual operations test:
- 1. the licensee shall undergo additional training before retaking the test
- 2. the licensee shall not perform licensed duties until retaking and passing the test.
- c. Records of the annual operations test must be maintained and any individual who fails shall be given additional training and then retested.
- d. Operators who do not meet the 15 month requirement shall take the annual operations test as soon as practically possible. In addition, the operator in question shall receive documented training on the Washington State University Nuclear Science Center Requalification Plan and 10 CFR 55.59.
- 3. Biennial Operations Requirement In accordance with ANSI/ANS 15.4 and 10 CFR 55.59, over a tw6-year period, each licensee in the requalification program shall perform at least ten reactivity manipulations in any combination of reactor startups, 'shutdowns, or significant reactivity changes. To remain qualified to perform reactor pulses, an operator must complete at least one pulse semiannually at intervals not to exceed 7.5 months. An operator who does not meet this requirement must perform their next pulse under the supervision of an SRO. Direct supervision of these operations shall be considered equivalent to actual performance for the senior reactor operator. The quarterly operations certificat_ion is designed to insure that the biennial operations requirements are met.
- 4. Quarterly Operations Certification Each licensed reactor operator and senior operator must actively participate in the operations of the facility in order to remain qualified. The minimum quarterly oper~tions required are listed below.
- a. Reactor Operators (personally perform) i) One complete reactor checkout and startup, including bringing the reactor up to full power.
ii) One shutdown from full power.
WSU Nuclear Science Center Page2
NSC Requalification Program Rev. 8/2/2018 iii) Four hours of reactor operation time.
- b. Senior Reactor Operators (directly supervise or personally perform) i) One complete reactor checkout and startup, including bringing the reactor up to full power.
ii) One shutdown from full power.
iii) Four hours of reactor operation time.
- c. . Each individual who fails to perform the above minimum operations in any one calendar quarter shall be considered to be unqualified to perform license duties.
In order to be requalified, an individual must be administered the equivalent of an operating test and six hours of supervised reactor operation time.
- 5. Facility and Safety Reviews
- a. All the following listed items will be promptly routed to each licensed operator and senior operator in the facility. Each licensee will be required to read this information and sign a routing slip.
- 1. Facility design changes.
- 2. Technical specification changes.
- 3. Facility license changes.
- 4. Standard operating procedure changes.
- b. Each licensed operator and senior operator shall annually review all the current standard and emergency pro*cedures of the facility. A form indicating that this has been done shall be maintained in the iqdividual's training file.
- 6. Training Records A training record file shall be maintained which shall indicate the performance of each licensed individual in the requalification program during the facility standardized two year training cycle. The records for each licensed individual shall be maintained as required 1 by the American Nuclear Insurers policy, which is currently life of the policy plus ten years. This record shal(contain the following information: .
WSU Nuclear Science Center - Page 3
NSC Requalification Program Rev. 8/2/2018
- a. Performance on each section of the requalification program examination, including the actual examinations and answers given by each licensee.
- b. Special lectures, attended as a result of failure to pass a written requalification examination and results of reexamination.
- c. Quarterly certification forms.
- d. Results of annual operations test.
- e. Facility and safety review signed routing slips.
- f. Biennial performance review.
- g. Biennial medical evaluation NRC Form 396.
- 7. RO and SRO Biennial Performance Reviews The training program supervisor for the Nuclear Science Center shall biennially review the performance of each licensed reactor operator and senior operator to ensure competence to perform licensed activities. This review shall include but not be limited to the following considerations:
- a. Performance on the written requalification examination.
- b. Results of quarterly operations certifications.
- c. Results of annual operations test.
- d. Attitude toward following standard procedures and performing operations in a safe manner.
- e. General overall performance of the individual in carrying out licen~e responsibilities in a safe and competent manner.
WSU Nuclear Science Center Page4