IE Safeguards Insp Rept 50-027/82-01 on 820719-20.No Noncompliance Noted.Major Areas Inspected:Security Plan,Snm Protection,Security Organization & Access Controls.Details Withheld (Ref 10CFR2.790)
ML20058F947
Person / Time
Site: Washington State University
Issue date: 07/28/1982
From: Mcqueen A, Schuster M, Schwan C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19262G667 List:
References
50-027-82-01, 50-27-82-1, NUDOCS 8208030151
Download: ML20058F947 (2)


Text

..

x ..

$

'. a %

.

.,~  : .. .

~ +

.

-

.. .

.

, The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.79 U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-27/82-01 (IE-V-513)

Docket No. 50-27 License No. R-76 Safeguards Group Licensee: Washington State University Pullman, Washington 99104

, Facility Name: Nuclear Radiation Center Inspection at: Pullman, Washington Inspection Conducted: July 19 and 20, 1982 Date of Last Physical Security Inspection Visit: June 9 and 10, 1980

<

Type of Inspection: Unannounced Physical Security Inspectors: thidult h. b$ e n/u M / D A. D. McQueen, PhysicaT Security InsDector (/ J Date ' Signed

/%k //A '

C. A. Schwaff, Physical Security Inspector m/u/ra Date Signed

-

Approved by: //h(A 4 y '/ #f8V M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:

Areas !nspected: Security Plan; Protection of SNM; Security Organization; Access Controls; Alarn Systems; Keys and Locks; Communications; Response Procedures; and Protection against Radiological Sabotag The inspection involved 14 inspection hours onsite by two inspectors. The inspection was conducted during the day shift perio Results: The licensee was found to be in compliance with NRC requirements

'

within t e areas examined during the inspection.